Plan Review Details - Permit 22071318
Plan Review Stops For Permit 22071318
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-08-12 Cont ID  
Sent By rrossano Date 2022-08-12 Time   Rev Time  
Received By rrossano Date 2022-08-12 Time   Sent To I
Notes
2022-08-12 11:48:51PASSED WITH PROVISOS:
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 CONSTRUCTION.
  
 THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT IF PAVERS
 ARE USED IN THE RIGHT OF WAY PORTION OF THE DRIVEWAY.
 THE AGREEMENT SHALL SHOW PROPERTY ADDRESS, PCN NUMBER,
 PLAT BOOK AND PAGE NUMBERS AND MUST THEN BE RECORDED BY
 APPLICANT AT PALM BEACH COUNTY COURTHOUSE - RECORDING
 DEPT. 4.25. A RECORDED COPY OF THIS DOCUMENT SHOULD
 THEN BE FAXED TO (561) 494-1116. ATTENTION: DRIVEWAY
 REVIEWER, AND ALSO UPLOADED WITH RESUBMITTAL OF
 DEVELOPMENT SERVICES APPLICATION FOR DRIVEWAY. DOCUMENT
 NEEDS TO BE RECORDED PRIOR TO FINAL SIGN OFF.
  
 FOR A PDF COPY OF THE PAVER DRIVEWAY AGREEMENT GO TO:
 HTTPS://WWW.WPB.ORG/HOME/SHOWPUBLISHEDDOCUMENT/3298/637
 523652570000000
  
  
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-08-15 Cont ID  
Sent By aoliver Date 2022-08-15 Time 07:07 Rev Time 0.00
Received By aoliver Date 2022-08-03 Time 06:41 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-08-10 Cont ID  
Sent By asangele Date 2022-08-10 Time 12:40 Rev Time 0.00
Received By asangele Date 2022-08-10 Time 12:40 Sent To  
Notes
2022-08-10 12:42:008/10/2022
 PER CONVERSATION WITH APPLICANT PAVER SECTION ON SURVEY
 HAS BEEN REMOVED.
  
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 2022-08-05 Cont ID  
Sent By asangele Date 2022-08-05 Time 10:21 Rev Time 0.00
Received By asangele Date 2022-08-05 Time 10:21 Sent To  
Notes
2022-08-05 10:23:298/5/2022
 FAIL
 PLEASE PROVIDE DRIVEWAY WIDTH ON SURVEY
  
 SINGLE DRIVEWAY WIDTH CANNOT EXCEED 20FT IF PROPOSING
 TWO DRIVEWAY THE WIDTH CANNOT EXCEED 10FT EACH.
  
  
  
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved