Plan Review Details - Permit 22071280
Plan Review Stops For Permit 22071280
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-12-15 Cont ID  
Sent By rmcdouga Date 2022-12-15 Time 08:33 Rev Time 0.00
Received By rmcdouga Date 2022-12-15 Time 08:33 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-09-29 Cont ID  
Sent By rmcdouga Date 2022-09-29 Time 10:39 Rev Time 0.00
Received By rmcdouga Date 2022-09-29 Time 10:39 Sent To  
Notes
2022-09-29 10:54:59PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE POOL EQUIPMENT IS REQUIRED TO BE ANCHORED TO
 RESIST WINDLOADS. THE MANUFACTURER DOES NOT PROVIDE
 ANCHORING INFORMATION FOR WIND. SPECIFY THE FASTENER
 TYPE, SIZE, EMBED DEPTH AND NUMBER REQUIRED FOR EACH
 PIECE OF EQUIPMENT ON THE PLANS. FBC-R301

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-12-02 Cont ID  
Sent By jleahy Date 2022-12-02 Time 17:26 Rev Time 0.00
Received By jleahy Date 2022-12-02 Time 17:22 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2022-08-14 Cont ID  
Sent By jleahy Date 2022-08-14 Time 17:33 Rev Time 0.00
Received By jleahy Date 2022-08-14 Time 17:31 Sent To  
Notes
2022-08-14 17:34:06NO ELECTRIC SHOWN FOR POOL JLEAHY

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2022-08-22 Cont ID  
Sent By ccole Date 2022-08-22 Time 12:15 Rev Time 0.00
Received By ccole Date 2022-08-22 Time 12:14 Sent To  
Notes
2022-08-22 12:16:23SEPARATE PERMIT AND PLANS REQUIRED FOR THE GAS PIPING
 TO THE POOL HEATER.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-15 Cont ID  
Sent By rmcdouga Date 2022-12-15 Time 08:38 Rev Time 0.00
Received By rmcdouga Date 2022-11-14 Time 08:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-09-29 Cont ID  
Sent By rmcdouga Date 2022-09-29 Time 10:40 Rev Time 0.00
Received By rmcdouga Date 2022-08-11 Time 07:21 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2022-11-18 Cont ID  
Sent By ccole Date 2022-11-18 Time 10:05 Rev Time 0.00
Received By ccole Date 2022-11-18 Time 09:54 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2022-08-22 Cont ID  
Sent By ccole Date 2022-08-22 Time 12:13 Rev Time 0.00
Received By ccole Date 2022-08-22 Time 11:44 Sent To  
Notes
2022-08-22 12:14:121ST REVIEW FBC-2020 RES. PLUMBING
 PERMIT- 22071280
 8/22/2022
  
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION
 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET 2: PROVIDE TDH CALCULATIONS, AND THE PUMP
 CURVE ON THE PLAN MARKED UP TO SHOW THE TDH AND FLOW
 RATE OF THE SYSTEM- SECS. 4.4.9, 4.4.9.1
 ANSI/APSP/ICC-7 & R4501.7.2 & R4501.7.3 FBC RES.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-11-18 Cont ID  
Sent By ccole Date 2022-11-18 Time 09:59 Rev Time 0.00
Received By ccole Date 2022-11-18 Time 09:54 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-09-29 Cont ID  
Sent By rmcdouga Date 2022-09-29 Time 10:39 Rev Time 0.00
Received By rmcdouga Date 2022-09-29 Time 10:39 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-08-29 Cont ID  
Sent By vbroglia Date 2022-08-29 Time 12:35 Rev Time 0.00
Received By vbroglia Date 2022-08-29 Time 12:35 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved