Plan Review Details - Permit 22071063
Plan Review Stops For Permit 22071063
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 3 Status P Date 2022-12-15 Cont ID  
Sent By rmcphers Date 2022-12-15 Time 09:53 Rev Time 0.00
Received By rmcphers Date 2022-12-15 Time 09:53 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status F Date 2022-11-23 Cont ID  
Sent By rmcphers Date 2022-11-23 Time 15:56 Rev Time 0.00
Received By rmcphers Date 2022-11-23 Time 15:56 Sent To  
Notes
2022-11-23 15:56:52PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-09-20 Cont ID  
Sent By rmcphers Date 2022-09-20 Time 08:03 Rev Time 0.00
Received By rmcphers Date 2022-09-19 Time 16:57 Sent To  
Notes
2022-09-20 08:04:18PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-12-15 Cont ID  
Sent By rmcphers Date 2022-12-15 Time 09:53 Rev Time 0.00
Received By rmcphers Date 2022-12-15 Time 09:53 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-11-23 Cont ID  
Sent By rmcphers Date 2022-11-23 Time 15:57 Rev Time 0.00
Received By rmcphers Date 2022-11-23 Time 15:56 Sent To  
Notes
2022-11-23 16:03:51BUILD OUT
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS G-001, G-003, A-171 NEED TO BE SIGNED BY
 THE DESIGNER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX
 NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED TO BE USED
 IN ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-09-20 Cont ID  
Sent By rmcphers Date 2022-09-20 Time 08:04 Rev Time 0.00
Received By rmcphers Date 2022-09-19 Time 16:57 Sent To  
Notes
2022-09-20 08:06:08STORE BUILD OUT
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) DRAWING A171 IS NOT COMPLETE IN PROJECTDOX (ITS BEEN
 CUT OFF) - PLEASE PROVIDE A COMPLETE COPY.
  
 2) PLEASE SHOW THE BUILDING CONSTRUCTION TYPE FBC 602.1
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-12-02 Cont ID  
Sent By mpeterso Date 2022-12-02 Time 15:45 Rev Time 0.00
Received By mpeterso Date 2022-12-02 Time 15:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-09-06 Cont ID  
Sent By mpeterso Date 2022-09-06 Time 12:13 Rev Time 0.00
Received By mpeterso Date 2022-09-06 Time 12:13 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-08-19 Cont ID  
Sent By   Date 2022-08-19 Time   Rev Time 0.00
Received By bdolan Date 2022-08-19 Time 11:09 Sent To  
Notes
2022-08-19 11:09:29ELECTRICAL DRAWINGS NOT INCLUDED WITH PLAN SET.
 EMERGENCY LIGHTING
 AND EXIT SIGN PLACEMENT SHALL BE CONFIRMED THROUGH
 ADDITIONAL SUBMITTALS AND/OR DURING SITE INSPECTION.
  
 PER CITY CODES, ALL WORK IS SUBJECT TO FIELD
 INSPECTIONS AND APPROVAL.
  
 LT. BRIAN DOLAN
 DIVISION OF FIRE PREVENTION
 561-804-4752
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-12-15 Cont ID  
Sent By rmcphers Date 2022-12-15 Time 09:53 Rev Time 0.00
Received By rmcphers Date 2022-12-14 Time 07:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-02 Cont ID  
Sent By mpeterso Date 2022-12-02 Time 15:45 Rev Time 0.00
Received By mpeterso Date 2022-11-18 Time 08:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-09-20 Cont ID  
Sent By rmcphers Date 2022-09-20 Time 08:08 Rev Time 0.00
Received By rmcphers Date 2022-08-17 Time 08:21 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2023-03-01 Cont ID  
Sent By lmarchan Date 2023-03-01 Time 14:26 Rev Time 0.00
Received By lmarchan Date 2023-01-06 Time 12:29 Sent To  
Notes
2023-02-07 07:49:02RECEIPT MU-2023-001253 $556.90 PAID
2023-01-06 12:29:571/6/23 EMAILED IMPACT OFFICE TO REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2022-09-20 Cont ID  
Sent By rmcphers Date 2022-09-20 Time 08:06 Rev Time 0.00
Received By rmcphers Date 2022-09-20 Time 08:06 Sent To  
Notes
2022-09-20 08:07:45THIS IS A CHANGE OF OCCUPANCY CLASSIFICATION.
  
 PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2022-11-21 Cont ID  
Sent By medwards Date 2022-11-21 Time 16:50 Rev Time 0.00
Received By medwards Date 2022-11-21 Time 16:50 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2022-08-24 Cont ID  
Sent By medwards Date 2022-08-24 Time 10:35 Rev Time 0.00
Received By medwards Date 2022-08-24 Time 10:35 Sent To  
Notes
2022-08-24 10:42:13THE CURRENT USE OF THIS BUILDING IS BUSINESS AND THE
 OCCUPANT IS A BANK. THE PROPOSED USE IS MERCANTILE
 WHICH IS A CHANGE OF OCCUPANCY THE APPLICATION SHOULD
 REFLECT THIS CHANGE OF USE. THE MECHANICAL SYSTEM MUST
 MEET THE MERCANTILE REQUIREMENTS OF FMC 403.3.1.1 AND
 TABLE 403.3.1.1 FOR THE OUTDOOR AIR AS THE OCCUPANCE
 DENSITY PER 1000 SQ,FT. IS HIGHER IN THE MERCANTILE
 OCCUPANCY. PROVIDE THE MECHANICAL SCOPE OF WORK ALONG
 WITH DRAWINGS AND THE OUTDOOR AIR CALCULATIONS FOR THIS
 CHANGE OF USE.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status N Date 2022-08-26 Cont ID  
Sent By rwbrown Date 2022-08-26 Time 07:51 Rev Time 0.00
Received By rwbrown Date 2022-08-26 Time 07:44 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-12-15 Cont ID  
Sent By rmcphers Date 2022-12-15 Time 09:53 Rev Time 0.00
Received By rmcphers Date 2022-12-15 Time 09:53 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-11-23 Cont ID  
Sent By rmcphers Date 2022-11-23 Time 16:04 Rev Time 0.00
Received By rmcphers Date 2022-11-23 Time 16:04 Sent To  
Notes
2022-11-23 16:05:25SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS G-001, G-003, A-171 DO NOT SHOW AS
 DIGITALLY SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-09-06 Cont ID  
Sent By mpeterso Date 2022-09-06 Time 12:16 Rev Time 0.00
Received By mpeterso Date 2022-09-06 Time 12:16 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-08-29 Cont ID  
Sent By asangele Date 2022-08-29 Time 15:04 Rev Time 0.00
Received By asangele Date 2022-08-29 Time 15:04 Sent To  
Notes
2022-08-29 15:06:14NO SIGNAGE OR GRAPHICS ALLOWED ON BLACK OUT WINDOWS
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved