Plan Review Details - Permit 22070815
Plan Review Stops For Permit 22070815
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-09-20 Cont ID  
Sent By rmcdouga Date 2022-09-20 Time 09:09 Rev Time 0.00
Received By rmcdouga Date 2022-09-20 Time 09:09 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-09-06 Cont ID  
Sent By rmcdouga Date 2022-09-06 Time 14:13 Rev Time 0.00
Received By rmcdouga Date 2022-09-06 Time 11:24 Sent To  
Notes
2022-09-06 14:28:59PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE SURVEY SHOWS A FENCE, HOWEVER, I COULD NOT FIND
 A FENCE PERMIT FOR THIS PROPERTY. IN ORDER FOR THE
 FENCE TO BE UXED AS A POOL BARRIER IT IS REQUIRED TO BE
 LOCATED ON THE PROJECT PROPERTY AND UNDER THE CONTROL
 OF THE PROPERTY OWNER.
  
 2) SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR THE
 POOL ALARMS THAT ARE TO BE INSTALLED. FBC 107.2.1
  
 3) PROVIDE POOL EQUIPMENT ANCHORING DETAILS FOR WIND
 LOADS OF 170 MPH VULT. SPECIFY THE NUMBER AND TYPE OF
 ANCHORS FOR EACH TYPE OF EQUIPMENT. SPECIFY THE SIZE
 AND EMBED DEPTH FOR THE ANCHORS. FBC-R301.2.1
  
 4) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH
 OF THE REVIEW COMMENTS HAS BEEN ADDRESSED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-08-18 Cont ID  
Sent By rmcdouga Date 2022-08-18 Time 07:25 Rev Time 0.00
Received By rmcdouga Date 2022-08-18 Time 07:25 Sent To  
Notes
2022-08-18 07:55:52PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE POOL PLANS ARE NOT LEGIBLE ENOUGH TO REVIEW.
 SUBMIT CLEAR DRAWINGS. FBC 107.2.1.3

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-09-02 Cont ID  
Sent By jleahy Date 2022-09-02 Time 07:22 Rev Time 0.00
Received By jleahy Date 2022-09-02 Time 07:05 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2022-08-05 Cont ID  
Sent By jleahy Date 2022-08-05 Time 07:09 Rev Time 0.00
Received By jleahy Date 2022-08-05 Time 07:05 Sent To  
Notes
2022-08-05 07:09:52CAN NOT READ PLANS JLEAHY

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2022-07-26 Cont ID  
Sent By ccole Date 2022-07-26 Time 16:42 Rev Time 0.00
Received By ccole Date 2022-07-26 Time 16:41 Sent To  
Notes
2022-07-26 16:45:08A SEPARATE PERMIT IS REQUIRED FOR THE GAS PIPING TO THE
 POOL HEATER.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-09-20 Cont ID  
Sent By rmcdouga Date 2022-09-20 Time 11:19 Rev Time 0.00
Received By rmcdouga Date 2022-09-16 Time 09:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-09-06 Cont ID  
Sent By rmcdouga Date 2022-09-06 Time 14:29 Rev Time 0.00
Received By rmcdouga Date 2022-08-19 Time 08:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-08-18 Cont ID  
Sent By rmcdouga Date 2022-08-18 Time 07:25 Rev Time 0.00
Received By rmcdouga Date 2022-07-19 Time 15:25 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-07-26 Cont ID  
Sent By ccole Date 2022-07-26 Time 16:41 Rev Time 0.00
Received By ccole Date 2022-07-26 Time 16:11 Sent To  
Notes
***NONE***

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 1 Status P Date 2022-11-08 Cont ID  
Sent By dbattles Date 2022-11-08 Time 12:40 Rev Time 0.00
Received By dbattles Date 2022-11-08 Time 12:40 Sent To  
Notes
2022-11-08 12:41:46DOCUMENTS STAMPED AND PUT INTO APPROVED SUPPORTING
 DOCUMENTS IN PROJECTDOX.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-09-20 Cont ID  
Sent By rmcdouga Date 2022-09-20 Time 11:19 Rev Time 0.00
Received By rmcdouga Date 2022-09-20 Time 11:19 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-09-02 Cont ID  
Sent By jleahy Date 2022-09-02 Time 07:39 Rev Time 0.00
Received By jleahy Date 2022-09-02 Time 07:39 Sent To  
Notes
2022-09-02 07:39:53SEE SIGNATURE REVIEW FROM 7/26 JLEAHY

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-07-26 Cont ID  
Sent By ccole Date 2022-07-26 Time 16:39 Rev Time 0.00
Received By ccole Date 2022-07-26 Time 16:39 Sent To  
Notes
2022-07-26 16:41:10SIGNATURE REVIEW FBC- 2020
 PERMIT- 22070815
 7/26/22
  
 CODES IN EFFECT:
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE POOL PLANS- SHEETS 1 & 2- ARE PRINTED AND
 SCANNED COPIES OF DIGITAL SIGNED AND SEALED PLANS.
 PLANS PREPARED BY FL. LICENSED ENGINEERS THAT ARE
 TRANSMITTED ELECTRONICALLY SHALL BEAR THE DIGITAL SEAL
 AND SIGNATURE OF THE ENGINEER- FL. STATUTE 471.025, AND
 SECTION 61G15-23.005 FAC. PLANS SUBMITTED IN PAPER FORM
 TO THE FRONT COUNTER OF THE WPB BUILDING DEPT. SHALL
 BEAR EITHER RAISED OR INK SEALS AND THE WET SIGNATURES
 OF THE ENGINEER OF RECORD.
 FLORIDA BOARD OF PROFESSIONAL ENGINEERS GUIDELINES FOR
 ELECTRONIC OR DIGITALLY SIGNED AND SEALED PLANS AND
 DOCUMENTS.
  
 A DIGITAL SIGNATURE MUST BE UNIQUE TO THE PROFESSIONAL
 ENGINEER USING IT, OBTAINED FROM A THIRD-PARTY
 CERTIFICATION AUTHORITY, AND CAPABLE OF VERIFICATION.
 THE CERTIFICATION AUTHORITY WILL VET THE PE AND PROVIDE
 A PASSWORD-PROTECTED DIGITAL SIGNATURE FILE. (FBPE DOES
 NOT APPROVE OR PROVIDE A LIST OF AUTHORITIES.)
 YOU MAY NOT USE THE DIGITAL OPTION PROVIDED IN ADOBE
 ACROBAT, SINCE IT IS SELF-AUTHENTICATED AND DOES NOT
 USE A THIRD PARTY.
 YOUR DIGITAL SIGNATURE MUST BE LINKED TO THE DOCUMENT
 IN SUCH A WAY THAT ANY CHANGE INVALIDATES THE SIGNATURE
 AND DOCUMENT.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2022-08-25 Cont ID  
Sent By afowlkes Date 2022-08-25 Time 15:12 Rev Time 0.00
Received By afowlkes Date 2022-08-25 Time 15:12 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-07-27 Cont ID  
Sent By afowlkes Date 2022-07-27 Time 12:31 Rev Time 0.00
Received By afowlkes Date 2022-07-27 Time 12:31 Sent To  
Notes
2022-07-27 12:36:1407/27/22 FAILED
  
 NEED TO PROVIDE THE SETBACKS FOR THE POOL EQUIPMENT.
 PER CITY CODE, MECHANICAL EQUIPMENT CANNOT PROTRUDE
 MORE THAN 4 FT INTO ANY SETBACK.
  
 IF POSSIBLE, PLEASE PROVIDE A CLEARER COPY OF THE POOL
 LAYOUT AND PIPING PLAN AS IT IS VERY BLURRY AND HARD TO
 READ.
  
 ALEXANDER FOWLKES
 [email protected]
 5618221431


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved