| Plan Review Stops For Permit 22070706 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2023-01-09 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-01-09 |
Time |
13:42 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-01-09 |
Time |
13:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2023-01-09 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-01-09 |
Time |
09:27 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-01-09 |
Time |
09:19 |
Sent To |
|
|
| Notes |
| 2023-01-09 09:27:15 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II/INSPECTOR | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | 3RD BUILDING REVIEW DENIED: | | | | | | WPB AMENDMENTS TO FBC B 1609.3, THE ENGINEERING | | | DOCUMENT TITLED "STRUCTURAL LETTER (1)", INDICATES THE | | | ULTIMATE WIND SPEED TO BE 166 MPH. AS PER THE FLORIDA | | | BUILDING CODE AND THE CITY OF WEST PALM BEACH | | | AMENDMENDMENTS TO THE FLORIDA BUILDING CODE, THE | | | ULTIMATE WIND SPEED NEEDS TO BE CORRECTED FROM 166 MPH | | | TO 170 MPH. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-12-21 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-12-21 |
Time |
07:42 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-12-21 |
Time |
07:35 |
Sent To |
|
|
| Notes |
| 2022-12-21 07:44:15 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II/INSPECTOR | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | 2ND BUILDING REVIEW DENIED: | | | | | | WPB AMENDMENTS TO FBC B 1609.3, THE ENGINEERING | | | DOCUMENT TITLED "STRUCTURAL LETTER (1)", INDICATES THE | | | ULTIMATE WIND SPEED TO BE 166 MPH. AS PER THE FLORIDA | | | BUILDING CODE AND THE CITY OF WEST PALM BEACH | | | AMENDMENDMENTS TO THE FLORIDA BUILDING CODE, THE | | | ULTIMATE WIND SPEED NEEDS TO BE CORRECTED FROM 166 MPH | | | TO 170 MPH. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-11-04 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-11-04 |
Time |
16:33 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-11-04 |
Time |
16:23 |
Sent To |
|
|
| Notes |
| 2022-11-04 16:47:57 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II/INSPECTOR | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | WPB AMENDMENTS TO FBC B 1609.3, THE ENGINEERING | | | DOCUMENT TITLED "STRUCTURAL LETTER (1)", INDICATES THE | | | ULTIMATE WIND SPEED TO BE 166 MPH. AS PER THE FLORIDA | | | BUILDING CODE AND THE CITY OF WEST PALM BEACH | | | AMENDMENDMENTS TO THE FLORIDA BUILDING CODE, THE | | | ULTIMATE WIND SPEED NEEDS TO BE CORRECTED FROM 166 MPH | | | TO 170 MPH. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2023-01-12 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2023-01-12 |
Time |
21:21 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2023-01-10 |
Time |
19:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-12-07 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-12-07 |
Time |
21:41 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-12-07 |
Time |
21:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-10-27 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-10-27 |
Time |
21:14 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-10-27 |
Time |
19:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-01-12 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2023-01-12 |
Time |
21:21 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-12-30 |
Time |
15:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-12-21 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-12-21 |
Time |
07:58 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-11-21 |
Time |
08:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-11-04 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-11-04 |
Time |
16:49 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-10-11 |
Time |
08:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-01-09 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-01-09 |
Time |
09:25 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-01-09 |
Time |
09:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-12-21 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-12-21 |
Time |
07:58 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-12-21 |
Time |
07:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-11-04 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-11-04 |
Time |
16:33 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-11-04 |
Time |
16:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2023-01-11 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2023-01-11 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2023-01-11 |
Time |
15:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-12-13 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-12-13 |
Time |
13:16 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-12-13 |
Time |
13:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-10-19 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-10-19 |
Time |
13:47 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-10-19 |
Time |
13:47 |
Sent To |
|
|
| Notes |
|
|