Plan Review Details - Permit 22070701
Plan Review Stops For Permit 22070701
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-08-03 Cont ID  
Sent By cpuell Date 2022-08-03 Time 16:01 Rev Time 0.00
Received By cpuell Date 2022-08-03 Time 16:01 Sent To  
Notes
2022-08-03 16:01:52ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2022-08-16 Cont ID  
Sent By jgomez Date 2022-08-16 Time 16:04 Rev Time 0.00
Received By jgomez Date 2022-08-16 Time 16:01 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-08-16 Cont ID  
Sent By jgomez Date 2022-08-16 Time 08:46 Rev Time 0.00
Received By jgomez Date 2022-08-16 Time 08:19 Sent To  
Notes
2022-08-16 08:48:28ASBESTOS ACKNOWLEDGMENT REVIEW:
  
 1- ASBESTOS ACKNOWLEDGMENT LETTER SUBMITTED NEEDS TO BE
 REVISED:
  
 A) THE ASBESTOS ACKNOWLEDGMENT LETTER NEEDS TO TO
 INCLUDE THE ADDRESS AND PERMIT NUMBER IN THE SUBJECT
 LINE.
  
 B) PLEASE REWORD THE ACKNOWLEDGMENT LETTER. THE LETTER
 STATES "PLEASE FIND THE ACKNOWLEDGMENT......." THIS
 STATEMENT IS DIRECTING TO LOOK FOR THE ACKNOWLEDGMENT.
 CONTRACTOR'S LETTER IS TO ACKNOWLEDGE THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. SEE CONTRACTOR'S ASBESTOS ACKNOWLEDGMENT
 COMMENT BELOW AND REVISE AS REQUIRED.
  
  
 CONTRACTOR'S ASBESTOS ACKNOWLEDGMENT
 1-CONTRACTOR TO PROVIDE A SIGNED ACKNOWLEDGMENT LETTER,
 ON CONTRACTOR'S LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 NOTE:
 THE INFORMATION SHOULD INCLUDE THE ADDRESS, PERMIT
 NUMBER AND ASBESTOS IN THE SUBJECT LINE.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
 HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC
 ES/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION
 -RENOVATION.HTML
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-08-16 Cont ID  
Sent By jgomez Date 2022-08-16 Time 10:59 Rev Time 0.00
Received By jgomez Date 2022-08-16 Time 08:14 Sent To  
Notes
2022-08-16 10:59:56INTERIOR DEMO ONLY. JG.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-08-01 Cont ID  
Sent By jleahy Date 2022-08-01 Time 15:19 Rev Time 0.00
Received By jleahy Date 2022-08-01 Time 15:16 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-07-28 Cont ID  
Sent By pleduc Date 2022-07-28 Time   Rev Time 0.00
Received By pleduc Date 2022-07-28 Time 12:08 Sent To  
Notes
2022-07-28 12:21:49THIS PLAN WAS REVIEWED AND PASSED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 THIS PERMIT IS APPROVED FOR DEMO PER THE APPLICATION.
  
 THE FOLLOWING COMMENTS NEED TO BE REVIEWED AND APPLIED
 DURING THE DEMO AND TO THE BUILDING PERMIT FOR
 RECONSTRUCTION AT THE APPLICABLE TIME.
  
 1) THERE ARE INDICATIONS OF WALL REMOVAL AND
 RECONSTRUCTION.
  
 ANY REMOVAL AND/OR CONSTRUCTION OF THE WALL AREAS
 REQUIRES AN EVALUATION OR MODIFICATION OF THE FIRE
 SPRINKLER SYSTEM FOR CODE COVERAGE AND COMPLIANCE BY A
 CERTIFIED FIRE SPRINKLER CONTRACTOR.
  
 ANY AND ALL WORK ON THE FIRE SPRINKLER SYSTEMS SHALL BE
 DONE UNDER SEPARATE SHOP DRAWINGS AND BY A CERTIFIED
 FIRE SPRINKLER CONTRACTOR.
  
 THE FIRE SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE
 CONSTRUCTION PERIOD.
  
 PLEASE PROVIDE A NOTE OF ACKNOWLEDGEMENT ON THE DEMO &
 FLOOR PLAN SHEETS AND ENSURE COMPLIANCE.
  
  
  
 1A) THE REMOVAL AND CONSTRUCTION OF NEW SPACES/AREAS
 MAY INVOLVE FIRE ALARM EQUIPMENT/DEVICES AND MAY
 REQUIRE A REVIEW BY A FIRE ALARM CONTRACTOR FOR
 MODIFICATIONS.
  
 THE FIRE ALARM SYSTEMS SHALL BE MAINTAINED THROUGHOUT
 DEMO & CONSTRUCTION PERIODS
  
 ANY WORK ON THE FIRE ALARM, INCLUDING DEMO, SHALL BE
 DONE UNDER SEPARATE PERMITS & SHOP DRAWINGS.
  
 PLEASE PROVIDE A NOTE OF ACKNOWLEDGMENT ON THE DEMO &
 FLOOR PLAN SHEETS AND ENSURE COMPLIANCE.
  
  
  
 2) THERE ARE INDICATIONS OF CARPET REMOVAL AND
 REINSTALLATION; HOWEVER THERE ARE NO PRODUCT NAMES NOR
 SPECIFICATION SHEETS, INCLUDING THE CARPER, FOR THE
 REPLACEMENT.
  
 PER NFPA 101, CH 30
  
 30.3.3.3 INTERIOR FLOOR FINISH.
 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN
 ACCORDANCE WITH
 SECTION 10.2.
  
 10.2.7* INTERIOR FLOOR FINISH TESTING AND
 CLASSIFICATION.
 10.2.7.1* CARPET AND CARPET LIKE INTERIOR FLOOR
 FINISHES SHALL
 COMPLY WITH ASTM D 2859, STANDARD TEST METHOD FOR
 IGNITION
 CHARACTERISTICS OF FINISHED TEXTILE FLOOR COVERING
 MATERIALS.
 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH
 10.2.2.2
 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL
 HAVE A
 MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2.
  
 10.2.7.4 INTERIOR FLOOR FINISHES SHALL BE GROUPED IN
 THE CLASSES SPECIFIED
 IN 10.2.7.4.1 AND 10.2.7.4.2 IN ACCORDANCE WITH THE
 CRITICAL RADIANT FLUX
 REQUIREMENTS.
 10.2.7.4.1 CLASS I INTERIOR FLOOR FINISH. CLASS I
 INTERIOR FLOOR FINISH
 SHALL HAVE A CRITICAL RADIANT FLUX OF NOT LESS THAN
 0.45 W/CM2, AS DETERMINED
 BY THE TEST DESCRIBED IN 10.2.7.3.
 10.2.7.4.2 CLASS II INTERIOR FLOOR FINISH. CLASS II
 INTERIOR FLOOR FINISH
 SHALL HAVE A CRITICAL RADIANT FLUX OF NOT LESS THAN
 0.22 W/CM2, BUT LESS
 THAN 0.45 W/CM2, AS DETERMINED BY THE TEST DESCRIBED IN
 10.2.7.3.
  
  
 IF THE PROPOSED FLOORING IS PORCELAIN / CERAMIC TILE,
 NATURAL STONE TILE, CONCRETE TILES, SPEC SHEETS WOULD
 NOT BE REQUIRED.
  
 PLEASE REVIEW, PROVIDE SPEC SHEETS OR INDICATE THE TILE
 TYPE.
  
 LAMINATE/VINYL FLOORING IS NOT TILE AND A SPEC SHEET
 WOULD BE REQUIRED.
  
  
 3) THERE ARE INDICATIONS OF CEILING WORK AND
 REPAINTING.
  
 PROTECT FIRE SPRINKLERS AND FIRE ALARM DEVICES AND
 EQUIPMENT.
  
 DO NOT PAINT OVER SPRINKLER HEADS AND/OR FIRE ALARM
 DEVICES/EQUIPMENT.
  
 THE FS AND FA SYSTEMS SHALL BE MAINTAINED THROUGHOUT
 DEMO AND CONSTRUCTION.
  
 PLEASE PROVIDE A NOTE OF ACKNOWLEDGMENT ON THE DEMO &
 FLOOR PLAN SHEETS AND ENSURE COMPLIANCE.
  
  
  
 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-08-16 Cont ID  
Sent By jgomez Date 2022-08-16 Time 16:11 Rev Time 0.00
Received By jgomez Date 2022-08-16 Time 16:00 Sent To I
Notes
2022-08-16 16:01:57RECEIVED EMAIL FROM
 JEFFREY R.SMITH, PRESIDENT
 PARADIGM ONE CONTRACTORS, LLC
 PARADIGM KITCHEN & BATH, LLC
 DBA PARADIGM
 1224 US HWY 1, SUITE F
 NORTH PALM BEACH, FL 33408
 OFFICE: 561.589.8575
 CELL: 561.373.7690
 [email protected]
 WWW.PARADIGMLLC.ME
 FLORIDA LICENSES - CGC1532446~CBC1257812
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-08-16 Cont ID  
Sent By jgomez Date 2022-08-16 Time 11:08 Rev Time 0.00
Received By jgomez Date 2022-07-27 Time 06:33 Sent To I
Notes
***NONE***

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status N Date 2022-08-16 Cont ID  
Sent By jgomez Date 2022-08-16 Time 08:25 Rev Time 0.00
Received By jgomez Date 2022-08-16 Time 08:23 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-08-16 Cont ID  
Sent By jgomez Date 2022-08-16 Time 16:10 Rev Time 0.00
Received By jgomez Date 2022-08-16 Time 16:01 Sent To  
Notes
2022-08-16 16:11:27DRAWING A1.0 WITH DIGITAL SIGNATURE SENT TO SIGNATURE
 FOLDER. JG.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-08-16 Cont ID  
Sent By jgomez Date 2022-08-16 Time 11:01 Rev Time 0.00
Received By jgomez Date 2022-08-16 Time 10:01 Sent To  
Notes
2022-08-16 11:08:46SIGNATURE REVIEW
  
 1- DRAWING A1.0 HAS ENGINEER'S DIGITAL SIGNATURE THAT
 IS CORRUPTED AND CAN NOT BE VERIFIED. ALL
 DRAWINGS/DOCUMENTS NEED TO HAVE VERIFIABLE ORIGINAL
 DIGITAL SEAL/SIGNATURE AS REQUIRED BY CHAPTER 471 F.S.
 WHEN SUBMITTING DRAWINGS/DOCUMENTS FOR PUBLIC RECORDS.
 NEED TO SUBMIT DRAWING ELECTRONICALLY WITH VERIFIABLE
 ORIGINAL DIGITAL SIGNATURE.
 NOTE: THIS PERMIT IS FOR INTERIOR DEMOLITION. ONLY
 DRAWING A1.0 WILL BE ISSUED. THE REST OF UPLOADED
 DRAWINGS WILL NOT BE ISSUED FOR THIS PERMIT. THEY WILL
 BE REVIEWED UNDER A SEPARATE PERMIT.
  
 ENGINEERS
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
2022-08-01 15:20:38ELECTRICAL SIGNATURE STATES THAT IT IS CORRUPT.??
 JLEAHY


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved