| 2022-07-18 11:38:13 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) THERE IS NO FLOOR PLAN SUBMITTED THAT INDICATES THE |
| | LOCATION OF FLOORING REPLACEMENT WITHIN THE UNIT. |
| | |
| | PER NFPA 1 |
| | |
| | 1.7.12 PLANS AND SPECIFICATIONS. |
| | |
| | 1.7.12.7 PLANS SHALL BE SUBMITTED TO THE AHJ FOR OTHER |
| | CONDITIONS AS DEEMED NECESSARY BY THE AHJ TO DETERMINE |
| | COMPLIANCE WITH THE APPLICABLE CODES AND STANDARDS. |
| | |
| | FOR THE OFFICIAL RECORD, PLEASE PROVIDE A FLOOR PLAN |
| | INDICATING THE LOCATION OF WHERE THE EXISTING TILE WILL |
| | BE REMOVED AND FLOORING REPLACED. |
| | |
| | |
| | |
| | 1A) THE VINYL PLANK FLOORING SPEC SHEET DO NOT INDICATE |
| | THE FLAME RATING IN COMPLIANCE WITH NFPA. |
| | |
| | THE RADIANT HEAT NOTED ON THE SPEC SHEET IS FOR |
| | IN-FLOOR ELECTICAL FLOOR HEATING SYSTEMS, NOT FINISHED |
| | FLOOR EXPOSURE TO HEAT AND FLAME. |
| | |
| | VINYL FLOORING IS MANUFACTURED AROUND THE WORLD AND NOT |
| | ALL ARE TESTED AND MEETING LISTED AND NFPA STANDARDS. |
| | |
| | PER NFPA 101, CH 30 |
| | |
| | 30.3.3.3 INTERIOR FLOOR FINISH. |
| | 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN |
| | ACCORDANCE WITH |
| | SECTION 10.2. |
| | |
| | 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH |
| | 10.2.2.2 |
| | ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL |
| | HAVE A |
| | MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2. |
| | |
| | FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE VINYL |
| | FLOORING NAME AND THE PRODUCT SPEC SHEETS OF THE |
| | PROPOSED FINISHED |
| | VINYL FLOORING INDICATING THE FIRE BEHAVIOR RATING. |
| | |
| | |
| | 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |