Plan Review Details - Permit 22061584
Plan Review Stops For Permit 22061584
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-06-30 Cont ID  
Sent By cpuell Date 2022-06-30 Time 10:32 Rev Time 0.00
Received By cpuell Date 2022-06-30 Time 10:32 Sent To  
Notes
2022-06-30 10:32:35ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2023-06-06 Cont ID  
Sent By sberglun Date 2023-06-06 Time 13:54 Rev Time 0.00
Received By sberglun Date 2023-06-06 Time 13:54 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status F Date 2023-01-24 Cont ID  
Sent By sberglun Date 2023-01-24 Time 13:29 Rev Time 0.00
Received By sberglun Date 2023-01-24 Time 13:29 Sent To  
Notes
2023-01-24 13:29:521) PLEASE ADDRESS ZONING'S REPEATED COMMENT.
 SUZANNE BERGLUND
 [email protected]

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-12-30 Cont ID  
Sent By sberglun Date 2022-12-30 Time 07:43 Rev Time 0.00
Received By sberglun Date 2022-12-30 Time 07:42 Sent To  
Notes
2022-12-30 07:43:011) PLEASE ADDRESS ZONING COMMENTS REGARDING POWER.
 SUZANNE BERGLUND
 [email protected]

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-08-15 Cont ID  
Sent By sberglun Date 2022-08-15 Time 11:50 Rev Time 0.00
Received By sberglun Date 2022-08-18 Time 07:43 Sent To  
Notes
2022-08-18 07:43:551) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS.
 INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE
 MATERIAL, AND DESCRIPTION ON BOTH PLAN VIEW AND PROFILE
 VIEW. CONTACT JANICE TARBILL, [email protected] FOR
 AS-BUILT INFORMATION. INCLUDE AS-BUILT INFORMATION IN
 YOUR RESUBMITTAL.
 2) ALL ROADWAY, SIDEWALK, AND SWALE RESTORATIONS ARE
 REQUIRED PER CITY STANDARD, PARTIAL SIDEWALK FLAG
 REPLACEMNTS ARE NOT ACCEPTABLE. PLEASE USE CITY OF WEST
 PALM BEACH STANDARD DETAILS.
  
 SUZANNE BERGLUND
 [email protected]
 561-494-1075
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2023-06-07 Cont ID  
Sent By lmarchan Date 2023-06-07 Time 10:41 Rev Time 0.00
Received By lmarchan Date 2023-04-10 Time 16:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-01-24 Cont ID  
Sent By lmarchan Date 2023-01-24 Time 13:46 Rev Time 0.00
Received By lmarchan Date 2023-01-03 Time 13:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-30 Cont ID  
Sent By aoliver Date 2022-12-30 Time 12:06 Rev Time 0.00
Received By aoliver Date 2022-09-01 Time 08:39 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-08-24 Cont ID  
Sent By aoliver Date 2022-08-24 Time 07:34 Rev Time 0.00
Received By aoliver Date 2022-06-29 Time 15:35 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-08-24 Cont ID  
Sent By aoliver Date 2022-08-24 Time 07:34 Rev Time 0.00
Received By aoliver Date 2022-08-24 Time 07:34 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 4 Status P Date 2023-06-06 Cont ID  
Sent By ckimmerl Date 2023-06-06 Time 11:53 Rev Time 0.00
Received By ckimmerl Date 2023-06-06 Time 14:55 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date 2023-01-20 Cont ID  
Sent By ckimmerl Date 2023-01-20 Time 15:42 Rev Time 0.00
Received By ckimmerl Date 2023-01-20 Time 15:35 Sent To  
Notes
2023-01-20 15:42:211.REPEAT COMMENT: THE SUBMITTED PLANS SHOW THE
 UNDERGROUND ELECTRIC BEING SUPPLIED FROM AN FPL
 POLE/TRANSFORMER THAT IS LOCATED ON PRIVATE PROPERTY ON
 THE EAST SIDE OF S. DIXIE HIGHWAY. THE SURVEY NEEDS TO
 SHOW THAT THE AREA WHERE YOU PLAN TO PULL POWER FROM
 ACROSS PRIVATE PROPERTY IS LOCATED WITHIN A UTILITY
 EASEMENT. IF NO EASEMENT IS PRESENT POWER WILL HAVE TO
 BE DRAWN FROM AN ALTERNATIVE LOCATION.
  
 ***PLEASE NOTE, ZONING WILL NOT PASS THIS REVIEW
 WITHOUT FURTHER CLARIFYING THIS CONDITION AND
 IDENTIFYING CONNECTION IS MADE WITHIN AN EASEMENT OR
 FROM A POLE THAT IS WITHIN THE ROW.***
  
 2. ON PAGE 003 WHERE THE PROPOSED POLE IS LOCATED,
 PLEASE PROVIDE AT LEAST A 5 FT. CLEARANCE FROM THE
 PROPOSED EXCAVATION WORK TO THE TREE PIT. (8 FT. FROM
 TRUNK OF TREE TO PROPOSED EXCAVATION OR
 TRENCH/HANDHOLE). WORK RISKS IMPACT TO ROOT SYSTEMS OF
 TREE.
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 822.1426 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status F Date 2022-12-15 Cont ID  
Sent By ckimmerl Date 2022-12-15 Time 15:46 Rev Time 0.00
Received By ckimmerl Date 2022-12-15 Time 15:46 Sent To  
Notes
2022-12-15 15:46:511.REPEAT COMMENT: THE SUBMITTED PLANS SHOW THE
 UNDERGROUND ELECTRIC BEING SUPPLIED FROM AN FPL
 POLE/TRANSFORMER THAT IS LOCATED ON PRIVATE PROPERTY ON
 THE EAST SIDE OF S. DIXIE HIGHWAY. THE SURVEY NEEDS TO
 SHOW THAT THE AREA WHERE YOU PLAN TO PULL POWER FROM
 ACROSS PRIVATE PROPERTY IS LOCATED WITHIN A UTILITY
 EASEMENT. IF NO EASEMENT IS PRESENT POWER WILL HAVE TO
 BE DRAWN FROM AN ALTERNATIVE LOCATION.
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 822.1426 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2022-08-23 Cont ID  
Sent By ckimmerl Date 2022-08-23 Time 14:19 Rev Time 0.00
Received By ckimmerl Date 2022-08-23 Time 14:18 Sent To  
Notes
2022-08-23 14:19:221. THE SUBMITTED PLANS SHOW THE UNDERGROUND ELECTRIC
 BEING SUPPLIED FROM AN FPL POLE/TRANSFORMER THAT IS
 LOCATED ON PRIVATE PROPERTY ON THE EAST SIDE OF S.
 DIXIE HIGHWAY. THE SURVEY NEEDS TO SHOW THAT THE AREA
 WHERE YOU PLAN TO PULL POWER FROM ACROSS PRIVATE
 PROPERTY IS LOCATED WITHIN A UTILITY EASEMENT. IF NO
 EASEMENT IS PRESENT, YOU WILL NEED TO PROVIDE OWNERS
 CONSENT, OR GET THE POWER FROM AN ALTERNATIVE LOCATION.
  
 2. PLEASE PROVIDE AN 8FT. BUFFER BETWEEN THE TRUNK OF
 ANY TREES AND PALMS FROM ANY HANDHOLES, BOREPITS, AND
 EXCAVATION WORK. RISKS IMPACT TO ROOT SYSTEM OF TREES.
  
 3. POLE STEALTH DESIGN, HEIGHT, AND PROPOSED COLOR
 MATCHES CITY STANDARDS.
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 822.1426 [email protected]
  