| Plan Review Stops For Permit 22061548 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2022-08-16 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-08-16 |
Time |
15:15 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-08-16 |
Time |
14:43 |
Sent To |
|
|
| Notes |
| 2022-08-16 15:16:13 | RECEIVED EMAIL FROM YVETTE SANSUR. PROFLEX LV-200 AND | | | LAMINATED WOOD FLOORING JG. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2022-08-12 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-08-12 |
Time |
17:45 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-08-12 |
Time |
16:10 |
Sent To |
|
|
| Notes |
| 2022-08-12 17:46:38 | RESIDENTIAL (R2) BUILDING REVIEW COMMENTS | | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | | PERMIT #22061548 | | | | | | 1- THE FLAME SPREAD TEST REPORT SUBMITTED IS FOR | | | PROFLEX LV-200 UNDERLAYMENT. THE SOUND TRANSMISSION | | | CLASS (STC) TEST REPORT AND THE IMPACT INSULATION CLASS | | | (IIC) TEST REPORT SUBMITTED IS FOR PROTECT WRAP | | | WHISPERMAT LVT. | | | THE FLAME SPREAD TEST REPORT FOR THE FLOORING | | | UNDERLAYMENT AND THE SOUND TRANSMISSION TEST REPORT | | | SUBMITTED ARE FOR TWO DIFFERENT MANUFACTURERS. THE | | | FLAME SPREAD REPORT AND THE SOUND TEST REPORT NEED TO | | | BE DONE FOR THE SAME UNDERLAYMENT MATERIAL AND | | | MANUFACTURER. PLEASE RESUBMIT. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-08-02 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-08-02 |
Time |
13:29 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-08-02 |
Time |
13:28 |
Sent To |
|
|
| Notes |
| 2022-08-02 13:32:21 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | 1. OK | | | | | | FROM PREVIOUS LIST, F&D NUCORE FLAME SPREAD TEST WAS | | | SUBMITTED (FOR FLOORING), BUT THE FOLLOWING TEST | | | REPORTS ARE REQUIRED FOR THE UNDERLAYMENT. BEFORE | | | RESUBMITTING PLEASE EMAIL [email protected] TO ADVISE OF | | | THE UNDERLAYMENT PROPOSED. | | | | | | 2. ENGINEERED WOOD FLOOR REQUIRES A FLOORING | | | UNDERLAYMENT. PROVIDE THE STC, IIC, FLAME SPREAD TESTS. | | | | | | PLEASE NOTE THAT TEST REPORTS ARE REQUIRED - | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | | OR UL 723. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-07-25 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-25 |
Time |
15:02 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-25 |
Time |
15:01 |
Sent To |
|
|
| Notes |
| 2022-07-25 15:13:38 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | 1. FBC B 2509.1, SPECIFY BACKERBOARD FOR PROPOSED TILE | | | IN THE SHOWER. | | | | | | 2. ENGINEERED WOOD FLOOR REQUIRES A FLOORING | | | UNDERLAYMENT. PROVIDE THE STC, IIC, FLAME SPREAD TESTS. | | | | | | PLEASE NOTE THAT TEST REPORTS ARE REQUIRED - | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | | OR UL 723. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2022-08-15 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-08-15 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-08-15 |
Time |
12:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2022-08-01 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-08-01 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-08-01 |
Time |
15:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2022-06-30 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-06-30 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-06-30 |
Time |
13:12 |
Sent To |
|
|
| Notes |
| 2022-06-30 13:16:52 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THERE IS AN INDICATION OF THE INSTALL OF WOOD | | | FLOORING IN THE MASTER BEDROOM, BUT NO SPEC SHEET NOR A | | | PRODUCT NAME FOR THE ACTUAL PROPOSED FLOORING. | | | | | | WOOD FLOORING IS MANUFACTURED AROUND THE WORLD AND NOT | | | ALL ARE TESTED AND MEETING LISTED AND NFPA STANDARDS. | | | | | | PER NFPA 101, CH 30 | | | | | | 30.3.3.3 INTERIOR FLOOR FINISH. | | | 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN | | | ACCORDANCE WITH | | | SECTION 10.2. | | | | | | 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH | | | 10.2.2.2 | | | ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL | | | HAVE A | | | MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2. | | | | | | FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE WOOD | | | FLOORING NAME AND THE PRODUCT SPEC SHEETS OF THE | | | PROPOSED | | | WOOD FLOORING INDICATING THE FIRE BEHAVIOR RATING. | | | | | | | | | 2) THERE IS AN INDICATION OF WALL TILE WORK IN THE | | | MASTER BATHROOM THAT MY INVOLVE A FIRE RATED WALL. | | | | | | ENSURE FIRE RATED TENANT SEPARATION/CORRIDOR WALLS ARE | | | REPAIRED TO THE EXISTING FIRE RATED SEPARATION. | | | | | | PROVIDE AN APPLICABLE NOTE OF ACKNOWLEDGMENT. | | | | | | | | | | | | | | | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | | | | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-08-16 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-08-16 |
Time |
15:16 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-08-16 |
Time |
14:40 |
Sent To |
I |
|
| Notes |
| 2022-08-16 14:41:44 | RECEIVED EMAIL FROM YVETTE SANSUR. PROFLEX LV-200 AND | | | LAMINATED WOOD FLOORING JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-08-15 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-08-15 |
Time |
12:37 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-08-12 |
Time |
16:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-08-02 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-08-02 |
Time |
13:32 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-29 |
Time |
15:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-25 |
Time |
15:16 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-06-29 |
Time |
13:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2022-08-01 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-08-01 |
Time |
06:14 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-08-01 |
Time |
06:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2022-07-05 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-07-05 |
Time |
11:50 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-07-05 |
Time |
11:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-25 |
Time |
15:15 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-25 |
Time |
15:15 |
Sent To |
|
|
| Notes |
|
|