| Plan Review Stops For Permit 22061160 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2022-08-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-08-15 |
Time |
07:50 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-08-15 |
Time |
07:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2022-07-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-24 |
Time |
08:16 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-24 |
Time |
08:16 |
Sent To |
|
|
| Notes |
| 2022-07-24 08:16:59 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
P |
Date |
2022-10-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-10-03 |
Time |
12:03 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-10-03 |
Time |
12:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2022-09-27 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-09-27 |
Time |
06:36 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-09-27 |
Time |
05:26 |
Sent To |
|
|
| Notes |
| 2022-09-27 06:39:23 | 4TH BUILDING REVIEW | | | RESULTS: CORRECTIONS NEEDED | | | | | | CHRISTOPHER S. THROOP, C.B.O., CFM | | | PLANS EXAMINER II | | | CITY OF WEST PALM BEACH | | | (561) 805-6726 | | | [email protected] | | | | | | CODES IN EFFECT: | | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | | CHAPTER 1 ADMINISTRATION | | | NFPA 70 2017 EDITION NEC 2017 | | | | | | ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT: | | | | | | NOTICE: COMMENTS FROM 3RD REVIEW HAVE NOT BEEN | | | ADDRESSED, SEE BELOW: | | | | | | COMMENTS NOT ADDRESSED. THE ONLY NEW DOCUMENT SUBMITTED | | | WAS A SPEC SHEET FOR ADURA MAX. PLEASE SEE ITEM 3 | | | BELOW. | | | | | | 1. SIGNATURE REVIEW APPROVED ON 9/29/2022 BY S HILL. | | | | | | 2. MANNINGTON ADURA MAX LVT FLOORING IS PROPOSED. SPEC | | | SHEET INDICATES THAT THE SOUNDPROOFING IS ATTACHED, SO | | | FLAME SPREAD IS NOT REQUIRED. THE STC AND IIC TESTS ARE | | | REQUIRED. | | | | | | 3. PROVIDE THE TEST REPORTS FOR THE FLOORING PROPOSED: | | | | | | PLEASE NOTE THAT TEST REPORTS ARE REQUIRED - | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2022-09-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-09-01 |
Time |
07:43 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-09-01 |
Time |
07:43 |
Sent To |
|
|
| Notes |
| 2022-09-01 07:43:06 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | COMMENTS NOT ADDRESSED. THE ONLY NEW DOCUMENT SUBMITTED | | | WAS A SPEC SHEET FOR ADURA MAX. PLEASE SEE ITEM 3 | | | BELOW. | | | | | | 1. PLANS WERE PREPARED BY AN ENGINEER BUT ARE NOT | | | DIGITALLY SIGNED. UPLOAD DIGITALLY SIGNED PLANS. IF YOU | | | WOULD LIKE FOR US TO CONFIRM BEFORE YOU UPLOAD THAT | | | DOCUMENTS ARE DIGITALLY SIGNED, EMAIL TO [email protected] | | | AND [email protected] FOR VERIFICATION. | | | | | | 2ND REVIEW, RESPONSE LETTER STATES THAT THE ENGINEER | | | WILL DEAL WITH THE BUILDING DEPARTMENT. THIS ENGINEER | | | HAS A DIGITAL SIGNATURE. SOMEONE ON THE APPLICANT'S | | | TEAM IS TO UPLOAD DIGITALLY SIGNED PAGES. THE NEW PAGES | | | SHOULD BE NAMED SO THEY SUPERSEDE THE PAGES PREVIOUSLY | | | UPLOADED. | | | | | | 2. MANNINGTON ADURA MAX LVT FLOORING IS PROPOSED. SPEC | | | SHEET INDICATES THAT THE SOUNDPROOFING IS ATTACHED, SO | | | FLAME SPREAD IS NOT REQUIRED. THE STC AND IIC TESTS ARE | | | REQUIRED. | | | | | | 3. PROVIDE THE TEST REPORTS FOR THE FLOORING PROPOSED: | | | | | | PLEASE NOTE THAT TEST REPORTS ARE REQUIRED - | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-08-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-08-15 |
Time |
07:51 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-08-15 |
Time |
07:51 |
Sent To |
|
|
| Notes |
| 2022-08-15 07:57:05 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | COMMENTS NOT ADDRESSED: | | | | | | 1. PLANS WERE PREPARED BY AN ENGINEER BUT ARE NOT | | | DIGITALLY SIGNED. UPLOAD DIGITALLY SIGNED PLANS. IF YOU | | | WOULD LIKE FOR US TO CONFIRM BEFORE YOU UPLOAD THAT | | | DOCUMENTS ARE DIGITALLY SIGNED, EMAIL TO [email protected] | | | AND [email protected] FOR VERIFICATION. | | | | | | 2ND REVIEW, RESPONSE LETTER STATES THAT THE ENGINEER | | | WILL DEAL WITH THE BUILDING DEPARTMENT. THIS ENGINEER | | | HAS A DIGITAL SIGNATURE. SOMEONE ON THE APPLICANT'S | | | TEAM IS TO UPLOAD DIGITALLY SIGNED PAGES. THE NEW PAGES | | | SHOULD BE NAMED SO THEY SUPERSEDE THE PAGES PREVIOUSLY | | | UPLOADED. | | | | | | 2. MANNINGTON ADURA MAX LVT FLOORING IS PROPOSED. SPEC | | | SHEET INDICATES THAT THE SOUNDPROOFING IS ATTACHED, SO | | | FLAME SPREAD IS NOT REQUIRED. THE STC AND IIC TESTS ARE | | | REQUIRED. | | | | | | 3. PROVIDE THE TEST REPORTS FOR THE FLOORING PROPOSED: | | | | | | PLEASE NOTE THAT TEST REPORTS ARE REQUIRED - | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-07-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-24 |
Time |
08:17 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-24 |
Time |
08:17 |
Sent To |
|
|
| Notes |
| 2022-07-24 08:20:34 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | 1. PLANS WERE PREPARED BY AN ENGINEER BUT ARE NOT | | | DIGITALLY SIGNED. UPLOAD DIGITALLY SIGNED PLANS. IF YOU | | | WOULD LIKE FOR US TO CONFIRM BEFORE YOU UPLOAD THAT | | | DOCUMENTS ARE DIGITALLY SIGNED, EMAIL TO [email protected] | | | AND [email protected] FOR VERIFICATION. | | | | | | 2. NEW FLOORING IS PROPOSED. REVISE THE PLAN TO CLARIFY | | | FLOORING TYPE - FOR INSTANCE TILE, LVT, WOOD, ETC. IF | | | THE FLOORING ALONE DOES NOT HAVE TEST REPORTS TO SHOW | | | COMPLIANCE WITH STC AND IIC REQUIREMENTS, UNDERLAYMENT | | | IS REQUIRED. IF UNDERLAYMENT IS NOT REQUIRED, PROVIDE | | | STC AND IIC TEST REPORTS FOR THE PROPOSED FLOORING. SEE | | | BELOW FOR ADDITIONAL INFO. | | | | | | 3. IF UNDERLAYMENT IS REQUIRED, PROVIDE THE FOLLOWING | | | TEST REPORTS FOR THE PROPOSED UNDERLAYMENT STC, IIC, | | | FLAME SPREAD: | | | | | | PLEASE NOTE THAT TEST REPORTS ARE REQUIRED - | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | | OR UL 723. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-07-15 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-07-15 |
Time |
23:54 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-07-14 |
Time |
19:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2022-09-19 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-09-19 |
Time |
|
Rev Time |
0.00 |
| Received By |
bdolan |
Date |
2022-09-19 |
Time |
11:33 |
Sent To |
|
|
| Notes |
| 2022-09-19 11:35:21 | REVIEW COMMENTS ADDRESSED. | | | | | | PER CITY CODES, ALL WORK IS SUBJECT TO FIELD | | | INSPECTIONS AND APPROVAL. | | | | | | LT. BRIAN DOLAN | | | DIVISION OF FIRE PREVENTION | | | 561-804-4752 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2022-08-09 |
|
|
Cont ID |
|
| Sent By |
cwalker |
Date |
2022-08-09 |
Time |
|
Rev Time |
0.00 |
| Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2022-06-29 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-06-29 |
Time |
|
Rev Time |
0.00 |
| Received By |
bdolan |
Date |
2022-06-29 |
Time |
10:03 |
Sent To |
|
|
| Notes |
| 2022-06-27 09:14:07 | FIRE REVIEW COMMENTS: | | | THE PLAN INDICATES NEW VINYL FLOORING TO BE INSTALLED. | | | PROVIDE THE MANUFACTURERS DOCUMENTATION OF THE TESTING | | | OF THE MATERIAL FOR FIRE PERFORMANCE TO INCLUDE THE | | | CRITICAL RADIANT FLUX. NFPA 101 10.2.7 | | | C. WALKER | | | 561-804-4762 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2022-10-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-10-03 |
Time |
12:06 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-10-02 |
Time |
09:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-09-27 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-09-27 |
Time |
06:40 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-09-14 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-09-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-09-01 |
Time |
07:44 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-08-23 |
Time |
16:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-08-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-08-15 |
Time |
07:57 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-08-06 |
Time |
07:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-07-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-24 |
Time |
08:23 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-06-24 |
Time |
05:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2022-09-16 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-09-16 |
Time |
06:09 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-09-16 |
Time |
06:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2022-06-30 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-06-30 |
Time |
06:10 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-06-30 |
Time |
06:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2022-09-16 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2022-09-16 |
Time |
14:27 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2022-09-16 |
Time |
14:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2022-06-28 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2022-06-28 |
Time |
12:15 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2022-06-28 |
Time |
11:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2022-09-29 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-09-29 |
Time |
07:09 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-09-29 |
Time |
07:09 |
Sent To |
|
|
| Notes |
| 2022-09-29 07:10:29 | RECEIVED FROM ENGINEER. PLANS ARE IN THE WRONG | | | ORIENTATION. THIS MAY BE WHY DIGITAL SIGNATURE HAS BEEN | | | AN ISSUE. UPLOADED TO PROJECTDOX SIGNATURE FOLDER AND | | | PASSED SIGNATURE. | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2022-09-27 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-09-27 |
Time |
06:39 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-09-27 |
Time |
05:26 |
Sent To |
|
|
| Notes |
| 2022-09-27 06:40:39 | SEE COMMENTS UNDER 4TH BLDG. REVIEW. CT |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2022-09-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-09-01 |
Time |
07:43 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-09-01 |
Time |
07:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2022-08-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-08-15 |
Time |
07:57 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-08-15 |
Time |
07:57 |
Sent To |
|
|
| Notes |
| 2022-08-15 07:57:26 | SEE BUILDING |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-07-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-24 |
Time |
08:21 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-24 |
Time |
08:21 |
Sent To |
|
|
| Notes |
| 2022-07-24 08:21:59 | SEE BUILDING REVIEW | | | |
|
|