| 2022-06-23 11:06:30 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR EMAIL [email protected]. |
| | |
| | 1. SUBMITTED PRODUCT APPROVAL FL1654-R28 HAS BEEN |
| | REVISED TO FL1654-R29. PLEASE PROVIDE THE FOLLOWING: |
| | INCLUDE COVER PAGE, EVALUATION REPORT PAGES 1-5 AND |
| | INSTALLATION INSTRUCTIONS FOR SYSTEM USED. ALL |
| | APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| | IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS |
| | AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT |
| | APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. AS PER |
| | RULE 61G20-3. |
| | 2. FBC R 301 FAC9N-3 FLORIDA STATE PRODUCT APPROVAL |
| | FL27499-R4 IS INCOMPLETE, PROVIDE THE FOLLOWING |
| | ADDITIONAL INFORMATION: COVER SHEET |
| | (WWW.FLORIDABUILDING.ORG, THIS WILL INCLUDE THE CODE |
| | VERSION, PRODUCT APPROVAL NUMBER, STATUS, GENERAL |
| | INFORMATION ABOUT THE PRODUCT). |
| | 3. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT |
| | APPROVAL FL27499.1-R4 COVERS MULTIPLE INSTALLATION |
| | OPTIONS TO MEET DESIGN UPLIFT PRESSURES. PLEASE SELECT |
| | CORRECT INSTALLATION OPTION FROM PAGE #2 OF THE |
| | EVALUATION REPORT THAT MEET OR EXCEED THE MINIMUM |
| | DESIGN PRESSURE REQUIREMENT FOR ZONE 3 EXPOSURE |
| | CATEGORY C AREAS. (-108.17). ALL APPLICABLE DETAILS AND |
| | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT |
| | APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS NOT |
| | SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED |
| | SITE-SPECIFIC ENGINEERING. |
| | 4. FBC R 301 FAC9N-3 SUBMITTED MIAMI-DADE COUNTY NOA |
| | 21-0602.14 SELECT INSTALLATION PROCEDURE SYSTEM TYPE |
| | E(1), E(2) OR E(3) IT DO NOT ALLOW FOR DIRECT-TO-DECK |
| | INSTALLATION. THE CITY OF WEST PALM BEACH WILL NOT |
| | ACCEPT THIS METHOD OF INSTALLATION WITHOUT ITS EXPLICIT |
| | MEANS OF INSTALLATION INDICATED IN THE NOA. |
| | 5. FBC B 107.2.1 FOR CLARITY PLEASE REVISE ROOF |
| | DIAGRAM/SKETCH AND INCLUDE ROOF SLOPE(S), MEAN ROOF |
| | HEIGHT(S). |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |