Plan Review Details - Permit 22060962
Plan Review Stops For Permit 22060962
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-01-20 Cont ID  
Sent By jleahy Date 2023-01-20 Time 13:27 Rev Time 0.00
Received By jleahy Date 2023-01-20 Time 13:23 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-07-14 Cont ID  
Sent By jleahy Date 2022-07-14 Time 11:09 Rev Time 0.00
Received By jleahy Date 2022-07-14 Time 11:09 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2022-07-28 Cont ID  
Sent By eschneid Date 2022-07-28 Time 15:44 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
2022-07-28 15:45:04ENGINEERING REVIEW COMPLETED UNDER WCF ROW PERMIT
 21120285

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-04-21 Cont ID  
Sent By aoliver Date 2023-04-21 Time 07:42 Rev Time 0.00
Received By aoliver Date 2023-01-11 Time 07:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-11-07 Cont ID  
Sent By jleahy Date 2022-11-07 Time 07:20 Rev Time 0.00
Received By aoliver Date 2022-06-23 Time 05:40 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-01-20 Cont ID  
Sent By jleahy Date 2023-01-20 Time 13:27 Rev Time 0.00
Received By jleahy Date 2023-01-20 Time 13:27 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-07-14 Cont ID  
Sent By jleahy Date 2022-07-14 Time 11:10 Rev Time 0.00
Received By jleahy Date 2022-07-14 Time 11:10 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2023-04-20 Cont ID  
Sent By ckimmerl Date 2023-04-20 Time 09:58 Rev Time 0.00
Received By ckimmerl Date 2023-04-20 Time 09:58 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-11-03 Cont ID  
Sent By ckimmerl Date 2022-11-03 Time 14:37 Rev Time 0.00
Received By ckimmerl Date 2022-11-03 Time 14:36 Sent To  
Notes
2022-11-03 14:37:111. THE SUBMITTED COMMUNICATION FACILITY PLACEMENT
 PERMIT - CITY RIGHTS-OF-WAY MUST BE APPROVED PRIOR TO
 THIS PERMIT BEING APPROVED. THE PLANS INCLUDED WITH
 THIS ELECTRICAL PERMIT MUST MATCH THE PLANS APPROVED
 WITH THE AFOREMENTIONED PERMIT. SOME OF THE COMMENTS
 BELOW ARE INCLUDED ON THE PLACEMENT PERMIT REVIEW AS
 WELL AS WITH THIS PERMIT.
 WCF 21120285 FAILED ZONING REVIEW ??? 1/3/22
 - PROPOSED POWER ROUTE, BORE PIT, AND UNDERGROUND
 ELECTRICAL CONNECTION IS SHOWN TO POTENTIALLY CONFLICT
 WITH EXISTING GAS LINE, SEWER, AND WATER, PLEASE
 PROVIDE THE NECESSARY PUBLIC UTILITY LETTERS GRANTING
 APPROVAL OF THE ELECTRICAL CONNECTIONS/POLE LOCATION
 AND DEPTH.
  
 - PLEASE PROVIDE A TYPICAL CROSS-SECTION SHOWING THE
 DEPTH OF THE UNDERGROUND ELECTRICAL COMPONENTS.
  
 - THE POLE STEALTH DESIGN MEETS CITY STANDARDS.
  
 2. POLE COLOR TO BE RAYCAP RAL 7022 (UMBRA GREY)
  
 3. PROPOSED POWER ROUTE AND BORE ON THE NORTHERN SIDE
 OF 11TH ST. APPEARS TO COME IN CLOSE PROXIMITY TO THE
 TREE, PLEASE PROVIDE AT LEAST AN 8 FT. BUFFER TO
 PROTECT THE ROOT ZONE OF ANY STREET TREES FROM
 EXCAVATION WORK.
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 [email protected] 822-1426
  
2022-07-28 15:43:59 
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved