| Plan Review Stops For Permit 22060743 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
P |
Date |
2022-10-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-10-13 |
Time |
15:17 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-10-13 |
Time |
15:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2022-09-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-09-14 |
Time |
10:27 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-09-14 |
Time |
10:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2022-08-16 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-08-16 |
Time |
17:04 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-08-16 |
Time |
17:04 |
Sent To |
|
|
| Notes |
| 2022-08-16 15:34:45 | PLAN REVIEW COMMENTS | | | | | | 3RD REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) RESOLVED. | | | | | | 2) RESOLVED. | | | | | | 3) RESOLVED. | | | | | | 4) PARTIALLY RESOLVED. [THE BOX FOR A8 (D) SHOULD BE | | | MARKED YES FOR ENGINEERED FLOOD OPENINGS. THE BOXES FOR | | | A9(D) SHOULD NOT BE MARKED FOR ENGINEERED FLOOD | | | OPENINGS AT ALL.] THE INFORMATION THAT IS ENTERED IN | | | SECTION A9 OF THE ELEVATION CERTIFICATE SHOULD BE | | | ENTERED IN SECTION A8. THIS IS A DETACHED GARAGE AND | | | SECTION A9 IS FOR GARAGES THAT ARE ATTACHED TO ANOTHER | | | BUILDING. IN SECTION A4 IT SHOULD BE NOTED THAT THIS IS | | | A DETACHED GARAGE. | | | | | | 5) NOT RESOLVED. [SEE ATTACHED FEMA ELEVATION | | | CERTIFICATE INSTRUCTIONS FOR A8 (A) FOR HOW TO MEASURE | | | THE ENCLOSED SPACE. IF YOU PROVIDE ME WITH YOUR EMAIL I | | | WILL SEND YOU THE INSTRUCTIONS.] THE SQUARE FOOTAGE OF | | | THE GARAGE SHOULD BE 2,154 SQUARE FEET BASED ON THE | | | MEASUREMENTS TO THE OUTSIDE WALL AS SHOWN ON THE | | | SURVEY. NFIP ELEVATION CERTIFICATE INSTRUCTIONS ITEM | | | A8.A. | | | | | | 6) RESOLVED. | | | | | | 7) RESOLVED. | | | | | | 8) RESOLVED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-07-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-07-27 |
Time |
10:36 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-07-27 |
Time |
10:30 |
Sent To |
|
|
| Notes |
| 2022-07-27 10:36:36 | PLAN REVIEW COMMENTS | | | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SUBMIT THE COMPLETE PRODUCT APPROVALS AND/OR | | | EVALUATION REPORTS FOR THE FLOOD VENT MODEL 1540-530 | | | AND TRIM AND SLEEVE KIT 1540-531-12. | | | | | | 2) THE BOOK AND PAGE NUMBER IN SECTION A3 OF THE | | | ELEVATION CERTIFICATE DOES NOT MATCH THE ONES ON THE | | | SURVEY DRAWINGS THAT WERE SUBMITTED. OUR RECORDS SHOW | | | THAT THE PLATS ARE RECORDED IN BOOK 130, PAGE 178. | | | PLEASE CORRECT. FBC 107.2.1 | | | | | | 3) THE BUILDING DIAGRAM NUMBER IN SECTION A7 OF THE | | | ELEVATION CERTIFICATE SHOULD BE 1A FOR THE GARAGES. | | | THEY ARE NOT RAISED SLAB ON GRADE PER NFIP ELEVATION | | | CERTIFICATE INSTRUCTIONS PAGE 7 OF 9. | | | | | | 4) THE INFORMATION THAT IS ENTERED IN SECTION A9 OF THE | | | ELEVATION CERTIFICATE SHOULD BE ENTERED IN SECTION A8. | | | THIS IS A DETACHED GARAGE AND SECTION A9 IS FOR GARAGES | | | THAT ARE ATTACHED TO ANOTHER BUILDING. IN SECTION A4 IT | | | SHOULD BE NOTED THAT THIS IS A DETACHED GARAGE. | | | | | | 5) THE SQUARE FOOTAGE OF THE GARAGE SHOULD BE 2,154 | | | SQUARE FEET BASED ON THE MEASUREMENTS TO THE OUTSIDE | | | WALL AS SHOWN ON THE SURVEY. NFIP ELEVATION CERTIFICATE | | | INSTRUCTIONS ITEM A8.A. | | | | | | 6) THE TOP OF BOTTOM FLOOR ENTERED IN SECTION C2. A) IS | | | 15.53 FEET AND THE SURVEY HAS 15.00 FEET. PLEASE VERIFY | | | AND MAKE NECESSARY CORRECTIONS. FBC 107.2.1 | | | | | | 7) SUBMIT A PHOTOGRAPH OF THE RIGHT SIDE OF THE GARAGE | | | THAT PROVIDES A BETTER VIEW OF THE FLOOD VENTS ON THAT | | | SIDE. FBC 107.2.1 | | | | | | 8) PROVIDE A SITE PLAN THAT CLEARLY IDENTIFIES EACH | | | GARAGE BY A NUMBER THAT CORRESPONDS WITH THE ELEVATION | | | CERTIFICATE. FBC 107.2.1 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-06-24 |
Time |
14:35 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-06-24 |
Time |
14:35 |
Sent To |
|
|
| Notes |
| 2022-06-24 14:39:46 | PLAN REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SUBMIT THE PRODUCT APPROVALS AND/OR EVALUATION | | | REPORTS FOR THE FLOOD VENTS. MODEL NUMBERS: 1540-520, | | | 1540-531-12, 1540-530 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2022-10-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-10-13 |
Time |
15:17 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-09-19 |
Time |
06:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-09-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-09-14 |
Time |
15:50 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-08-19 |
Time |
07:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-08-16 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-08-16 |
Time |
17:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-08-15 |
Time |
14:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-07-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-07-28 |
Time |
15:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-07-06 |
Time |
15:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-06-24 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-06-24 |
Time |
05:20 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
4 |
Status |
P |
Date |
2022-10-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-10-13 |
Time |
15:17 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-10-13 |
Time |
15:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
3 |
Status |
F |
Date |
2022-09-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-09-14 |
Time |
10:53 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-09-14 |
Time |
10:22 |
Sent To |
|
|
| Notes |
| 2022-09-14 11:22:35 | THE ALL PHASES S&S DOCUMENT THAT WAS SUBMITTED DOES NOT | | | HAVE A VALID DIGITAL SIGNATURE. PLEASE SUBMIT A SITE | | | PLAN SURVEY WITH A DIGITAL SIGNATURE. |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
2 |
Status |
F |
Date |
2022-08-16 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-08-16 |
Time |
17:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-08-16 |
Time |
17:05 |
Sent To |
|
|
| Notes |
| 2022-08-16 17:05:24 | SEE BUILDING REVIEW COMMENTS. NOT RESULTED PENDING A | | | PEER REVIEW. |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
1 |
Status |
F |
Date |
2022-07-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-07-28 |
Time |
15:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-07-27 |
Time |
10:30 |
Sent To |
|
|
| Notes |
| 2022-07-27 15:15:32 | SEE BUILDING REVIEW COMMENTS. NOT RESULTED PENDING A | | | PEER REVIEW. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2022-10-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-10-13 |
Time |
15:17 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-10-13 |
Time |
15:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2022-09-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-09-14 |
Time |
10:27 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-09-14 |
Time |
10:22 |
Sent To |
|
|
| Notes |
| 2022-09-14 11:25:07 | THE SURVEY/SITE PLAN IS NOT DIGITALLY SIGNED. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2022-08-16 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-08-16 |
Time |
17:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-08-16 |
Time |
17:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-07-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-07-27 |
Time |
10:30 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-07-27 |
Time |
10:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-06-24 |
Time |
14:35 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-06-24 |
Time |
14:35 |
Sent To |
|
|
| Notes |
|
|