| 2022-06-16 09:18:01 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR EMAIL [email protected]. |
| | |
| | 1. FBC B 107.2.1. SUBMITTED FLORIDA DBPR PRODUCT |
| | APPROVAL FL14317-R13 HAS NOT BEEN APPROVED YET AND IS |
| | NOT VALID FOR USE. PLEASE PROVIDE A COMPLETE SET OF |
| | APPROVED 2020 CODE VERSION PRODUCT APPROVALS/NOA?S FOR |
| | THE PROPOSED ROOF UNDERLAYMENT SYSTEM TO BE USED |
| | (FL14317-R12), IT COVERS MULTIPLE PRODUCT TYPES; ROOF |
| | COVER OPTIONS; ALLOWABLE UNDERLAYMENT/TILE-ADHESIVE |
| | COMBINATIONS, ALLOWABLE SUBSTRATES & ATTACHMENT |
| | LIMITATIONS. SELECT OPTIONS FROM EACH CATEGORY TO BE |
| | USED. ALL APPLICABLE DETAILS AND ATTACHMENTS MUST BE |
| | CLEARLY IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. |
| | DETAILS AND ATTACHMENTS NOT SPECIFICALLY COVERED IN |
| | PRODUCT APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. |
| | 2. FBC R 301 FAC9N-3 FLORIDA STATE PRODUCT APPROVAL |
| | FL17330-R4 IS INCOMPLETE, PROVIDE THE FOLLOWING |
| | ADDITIONAL INFORMATION: EVALUATION REPORT PAGES 1-8; |
| | MIAMI-DADE COUNTY NOA NO. 19-1003.03. THE EVALUATION |
| | REPORTS CAN BE PRINTED FROM THE SUMMARY OF PRODUCTS |
| | LOCATED AT THE BOTTOM OF THE COVER PAGE. PRINT PAGES |
| | 1-8. |
| | 3. FBC EB 706.8. SHOW THAT THE VALUE OF THE STRUCTURE |
| | IS LESS THAN $300,000.00 OR SPECIFY HOW THE ROOF TO |
| | WALL CONNECTIONS WILL BE IMPROVED. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |