Plan Review Details - Permit 22060663
Plan Review Stops For Permit 22060663
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-06-15 Cont ID  
Sent By cpuell Date 2022-06-15 Time 11:36 Rev Time 0.00
Received By cpuell Date 2022-06-15 Time 11:36 Sent To  
Notes
2022-06-15 11:36:59ADDRESS WAS NEVER ASSIGNED TO THE GARAGE. ADDRESS
 APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2022-09-27 Cont ID  
Sent By cthroop Date 2022-09-27 Time 10:22 Rev Time 0.00
Received By cthroop Date 2022-09-27 Time 06:45 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-07-19 Cont ID  
Sent By shill Date 2022-07-19 Time 14:22 Rev Time 0.00
Received By shill Date 2022-07-19 Time 14:22 Sent To  
Notes
2022-07-19 14:23:18PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-10-29 Cont ID  
Sent By cthroop Date 2022-10-29 Time 10:57 Rev Time 0.00
Received By cthroop Date 2022-10-29 Time 10:47 Sent To  
Notes
2022-10-29 11:00:23A PLUMBING SUB-PERMIT IS REQUIRED. PLACED A PRINT HOLD
 ON PERMIT. CT

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-09-27 Cont ID  
Sent By cthroop Date 2022-09-27 Time 10:23 Rev Time 0.00
Received By cthroop Date 2022-09-27 Time 06:45 Sent To  
Notes
2022-09-27 10:40:342ND BUILDING DEMO REVIEW
 RESULTS: CORRECTIONS NEEDED
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NFPA 70 2017 EDITION NEC 2017
  
 ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1. (ELECTRIC) AN ELECTRICAL SUB-PERMIT IS REQUIRED TO
 DISCONNECT THE FREE STANDING GARAGE FROM MAIN DWELLING
 UNIT.
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION.
  
 3. (WATER/SANITARY) A PLUMBING SUB-PERMIT IS REQUIRED
 TO DISCONNECT THE WATER SERVICE AND SANITARY LINES FROM
 THE GARAGE.
  
 4. N/A
  
 5. OK
  
 6. COMPLETE THE DEMO DEBRIS FORM: NOTICE: I UPLOADED
 THE DEMO DEBRIS DISPOSAL FORM TO THE SUPPORTING DOC'S
 FOLDER FOR YOUR REVIEW AND USE.
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 7. OK
  
 8.PROVIDE A STORMWATER POLLUTION PREVENTION PLAN.
 YOU MAY USE THE SURVEY. SHOW SILT FENCEING OR OTHER
 APPROVED METHODS
  
 9.OK
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-07-19 Cont ID  
Sent By shill Date 2022-07-19 Time 14:21 Rev Time 0.00
Received By shill Date 2022-07-19 Time 14:21 Sent To  
Notes
2022-07-19 14:22:35****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
  
 PLEASE SEE THE "DEMOLITION PERMIT APPLICATION
 CHECKLIST" WHICH YOU CAN FIND AT THE FOLLOWING WEBSITE
 (IF NOT AVAILABLE, EMAIL [email protected] AND REQUEST):
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM
 "DEMOLITION APPLICATION"
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
  IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
  
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING #703. PLEASE NOTIFY US VIA EMAIL AFTER FINAL
 INSPECTION HAS PASSED).
  
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT DEMOLITION ADDRESS HAS
 BEEN INSPECTED AND/OR TREATED FOR RODENTS.
  
 6. COMPLETE THE DEMO DEBRIS FORM, FEES WILL BE ADDED TO
 YOUR PERMIT "DEMOLITION DEBRIS DISPOSAL FEE":
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 IF THE FORM IS UNAVAILABLE ONLINE, REQUEST AT
 [email protected].

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-10-19 Cont ID  
Sent By mpeterso Date 2022-10-13 Time 08:37 Rev Time 0.00
Received By mpeterso Date 2022-10-04 Time 10:03 Sent To  
Notes
2022-10-04 10:05:4010/19/22 CUSTOMER EMAILED ME AN ELECTRIC APP, I
 UPLOADED IT AND CHANGED THE RESULT TO PASS. MP
  
 10/13/22 CUSTOMER HAS LETTER IN SUPPORTING DOCS FROM
 E.C STATING HE WILL BE DISCONNECTING ELECTRIC TO
 STRUCTURE BUT STILL HAS NO ELECTRICAL APPLICATION ON
 FILE. MP
  
 10/4/22 RECEIVED A CALL FROM CUSTOMER, YAMI. SHE SAYS
 SHE WILL EMAIL ME AN ELECTRICAL AND PLUMBING SUB PERMIT
 APPLICATION. SHE SAYS ALL PLUMBING LINES INCLUDING
 SANITARY COME FROM MAIN HOUSE.

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2022-11-15 Cont ID  
Sent By rrossano Date 2022-11-15 Time   Rev Time 0.00
Received By rrossano Date 2022-11-15 Time   Sent To I
Notes
2022-11-15 14:29:21PASSED WITH PROVISO: CALL FOR LOCATES, DIAL 811 BEFORE
 YOU DIG. FOR MORE INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)

Review Stop ENG ENGINEERING CSD
Rev No 3 Status F Date 2022-10-13 Cont ID  
Sent By rrossano Date 2022-10-13 Time   Rev Time 0.00
Received By rrossano Date 2022-10-13 Time   Sent To  
Notes
2022-10-13 10:45:10PROVIDE ALL REQUIRED ASSOCIATED UTILITY SIGNOFFS AS
 REQUIRED BY BUILDING DEPT. - WATER/SEWER, PEST, FPL,
 FPU, ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON???T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ???WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE???? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES
 DEPT., 561-494-1098, FAX: 561-494-1116 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-09-27 Cont ID  
Sent By rrossano Date 2022-09-27 Time   Rev Time 0.00
Received By rrossano Date 2022-09-27 Time   Sent To I
Notes
2022-09-27 10:27:11PLEASE ADDRESS PREVIOUS COMMENTS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-06-14 Cont ID  
Sent By rrossano Date 2022-06-14 Time   Rev Time  
Received By rrossano Date 2022-06-14 Time   Sent To  
Notes
2022-06-14 11:09:58PLEASE PROVIDE STORMWATER POLLUTION PREVENTION PLAN -
 SILT FENCE AROUND PROPERTY TO PREVENT DEBRIS RUNOFF;
 PROTECT ROADWAY FROM TRACKING OF DIRT FROM TRUCKS
 HAULING DEBRIS; PROTECT ANY STORM DRAIN INLETS IN
 VICINITY USING BEST MANAGEMENT PRACTICES (FILTER
 FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-06-30 Cont ID  
Sent By amhamilt Date 2022-06-30 Time 09:24 Rev Time 0.00
Received By amhamilt Date 2022-06-30 Time 09:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-11-14 Cont ID  
Sent By rmcdouga Date 2022-11-14 Time 15:00 Rev Time 0.00
Received By rmcdouga Date 2022-10-03 Time 06:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-10-02 Cont ID  
Sent By lmarchan Date 2022-10-02 Time 09:30 Rev Time 0.00
Received By lmarchan Date 2022-09-22 Time 09:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-07-19 Cont ID  
Sent By shill Date 2022-07-19 Time 14:23 Rev Time 0.00
Received By shill Date 2022-06-14 Time 05:16 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-10-05 Cont ID  
Sent By rwbrown Date 2022-10-05 Time 09:50 Rev Time 0.00
Received By rwbrown Date 2022-10-05 Time 09:50 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-07-19 Cont ID  
Sent By shill Date 2022-07-19 Time 14:23 Rev Time 0.00
Received By shill Date 2022-07-19 Time 14:23 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-06-30 Cont ID  
Sent By amhamilt Date 2022-06-30 Time 09:24 Rev Time 0.00
Received By amhamilt Date 2022-06-30 Time 09:24 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved