Plan Review Details - Permit 22060518
Plan Review Stops For Permit 22060518
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-06-15 Cont ID  
Sent By cpuell Date 2022-06-15 Time 11:49 Rev Time 0.00
Received By cpuell Date 2022-06-15 Time 11:49 Sent To  
Notes
2022-06-15 11:50:06ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2022-08-31 Cont ID  
Sent By pvalenti Date 2022-08-31 Time 15:42 Rev Time 0.00
Received By pvalenti Date 2022-08-31 Time 15:42 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-07-19 Cont ID  
Sent By shill Date 2022-07-19 Time 07:36 Rev Time 0.00
Received By shill Date 2022-07-19 Time 07:36 Sent To  
Notes
2022-07-19 07:36:54PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2022-09-19 Cont ID  
Sent By pvalenti Date 2022-09-19 Time 07:34 Rev Time 0.00
Received By pvalenti Date 2022-09-19 Time 07:33 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2022-08-31 Cont ID  
Sent By pvalenti Date 2022-08-31 Time 15:56 Rev Time 0.00
Received By pvalenti Date 2022-08-31 Time 15:56 Sent To  
Notes
2022-08-31 15:57:59PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 3. WATER DOWN METHOD:
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
 IF USING A WATER TRUCK, PROVIDE DETAILED INFORMATION
 REGARDING THE WATER TRUCK.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING #703. PLEASE NOTIFY US VIA EMAIL AFTER FINAL
 INSPECTION HAS PASSED FOR PERMIT #22080792).

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-08-15 Cont ID  
Sent By shill Date 2022-08-15 Time 07:43 Rev Time 0.00
Received By shill Date 2022-08-15 Time 07:43 Sent To  
Notes
2022-08-15 07:44:36SEE PREVIOUS LIST. PLEASE DO NOT RESUBMIT WITHOUT ALL
 ITEMS.
  
 UTILITY RELEASES NOT SUBMITTED. SEWER CAP OFF PERMIT
 NOT SUBMITTED/FINALED.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-07-19 Cont ID  
Sent By shill Date 2022-07-19 Time 07:32 Rev Time 0.00
Received By shill Date 2022-07-19 Time 07:32 Sent To  
Notes
2022-07-19 07:36:20****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 PLEASE DO NOT RESUBMIT UNTIL ALL ITEMS ARE COMPLETE.
 SUBMITTING MULTIPLE TIMES WITH PARTIAL DOCUMENTS DELAYS
 PLAN REVIEW.
  
 IF ANY FORMS ARE NOT AVAILABLE ONLINE, EMAIL [email protected]
 AND REQUEST THEM.
  
 PLEASE SEE THE "DEMOLITION PERMIT APPLICATION
 CHECKLIST" WHICH YOU CAN FIND AT THE FOLLOWING WEBSITE:
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM
 "DEMOLITION APPLICATION"
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
  IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
  
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING #703. PLEASE NOTIFY US VIA EMAIL AFTER FINAL
 INSPECTION HAS PASSED).
  
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT DEMOLITION ADDRESS HAS
 BEEN INSPECTED AND/OR TREATED FOR RODENTS.
  
 6. COMPLETE THE DEMO DEBRIS FORM, FEES WILL BE ADDED TO
 YOUR PERMIT "DEMOLITION DEBRIS DISPOSAL FEE":
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 IF THE FORM IS UNAVAILABLE ONLINE, REQUEST AT
 [email protected].
  
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2022-09-19 Cont ID  
Sent By rrossano Date 2022-09-19 Time   Rev Time 0.00
Received By rrossano Date 2022-09-19 Time   Sent To I
Notes
2022-09-19 07:59:53PASSED WITH PROVISOS:
  
 PER PREVIOUS COMMENT, ON STORMWATER POLLUTION
 PREVENTION PLAN PROTECT ALL STORM DRAIN INLETS IN
 VICINITY ON 42ND ST. USING BEST MANAGEMENT PRACTICES
 (FILTER FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-08-12 Cont ID  
Sent By rrossano Date 2022-08-12 Time   Rev Time 0.00
Received By rrossano Date 2022-08-12 Time   Sent To  
Notes
2022-08-12 10:30:59ON STORMWATER POLLUTION PREVENTION PLAN PROTECT ANY
 STORM DRAIN INLETS IN VICINITY ON 42ND ST. USING BEST
 MANAGEMENT PRACTICES (FILTER FABRIC, ETC.)
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. -VARIOUS UTILITY SIGNOFFS - CITY OF
 WPB PUBLIC UTILITIES SIGNOFF FOR WATER/SEWER, PEST,
 FPL, FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-06-14 Cont ID  
Sent By rrossano Date 2022-06-14 Time   Rev Time  
Received By rrossano Date 2022-06-14 Time   Sent To  
Notes
2022-06-14 10:57:51PLEASE PROVIDE STORMWATER POLLUTION PREVENTION PLAN -
 SILT FENCE AROUND PROPERTY TO PREVENT DEBRIS RUNOFF;
 PROTECT ROADWAY FROM TRACKING OF DIRT FROM TRUCKS
 HAULING DEBRIS; PROTECT ANY STORM DRAIN INLETS IN
 VICINITY USING BEST MANAGEMENT PRACTICES (FILTER
 FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-06-30 Cont ID  
Sent By amhamilt Date 2022-06-30 Time 09:15 Rev Time 0.00
Received By amhamilt Date 2022-06-30 Time 09:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-09-19 Cont ID  
Sent By lmarchan Date 2022-09-19 Time 08:59 Rev Time 0.00
Received By lmarchan Date 2022-09-19 Time 07:33 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-08-15 Cont ID  
Sent By shill Date 2022-08-15 Time 07:44 Rev Time 0.00
Received By shill Date 2022-08-11 Time 09:42 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-07-19 Cont ID  
Sent By shill Date 2022-07-19 Time 07:37 Rev Time 0.00
Received By shill Date 2022-06-13 Time 07:53 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-07-19 Cont ID  
Sent By shill Date 2022-07-19 Time 07:37 Rev Time 0.00
Received By shill Date 2022-07-19 Time 07:37 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-06-30 Cont ID  
Sent By amhamilt Date 2022-06-30 Time 09:15 Rev Time 0.00
Received By amhamilt Date 2022-06-30 Time 09:15 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved