Plan Review Details - Permit 22060336
Plan Review Stops For Permit 22060336
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-07-07 Cont ID  
Sent By cpuell Date 2022-07-07 Time 11:17 Rev Time 0.00
Received By cpuell Date 2022-07-07 Time 11:16 Sent To  
Notes
2022-07-07 11:21:17ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2022-07-23 Cont ID  
Sent By shill Date 2022-07-23 Time 18:56 Rev Time 0.00
Received By shill Date 2022-07-23 Time 18:56 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-07-23 Cont ID  
Sent By shill Date 2022-07-23 Time 18:57 Rev Time 0.00
Received By shill Date 2022-07-23 Time 18:57 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-07-05 Cont ID  
Sent By rrossano Date 2022-07-05 Time   Rev Time  
Received By rrossano Date 2022-07-05 Time   Sent To  
Notes
2022-07-05 08:55:54PASSED WITH PROVISO: ADD NOTE TO POLLUTION PLAN TO
 PROTECT NEARBY STORM INLET ON OLIVE AVE. WITH FILTER
 FABRIC OR OTHER BMP.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-07-19 Cont ID  
Sent By amhamilt Date 2022-07-19 Time 16:32 Rev Time 0.00
Received By amhamilt Date 2022-07-19 Time 16:32 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-07-26 Cont ID  
Sent By shill Date 2022-07-26 Time 10:00 Rev Time 0.00
Received By shill Date 2022-07-05 Time 05:02 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-07-23 Cont ID  
Sent By shill Date 2022-07-23 Time 18:56 Rev Time 0.00
Received By shill Date 2022-07-23 Time 18:56 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-07-25 Cont ID  
Sent By ckimmerl Date 2022-07-25 Time 13:37 Rev Time 0.00
Received By ckimmerl Date 2022-07-25 Time 13:24 Sent To  
Notes
2022-07-25 13:31:55PER SEC. 94-107. - DEMOLITION REQUIREMENTS. (B.)(2.) -
 EXISTING BUILDINGS MAY NOT BE DESTROYED OR REMOVED
 UNLESS THEY ARE TO BE REPLACED ACCORDING TO THESE URBAN
 REGULATIONS AND ONLY AFTER A BUILDING PERMIT WHICH
 AFFECTS THE VERTICAL CONSTRUCTION FOR THE NEW BUILDING
 HAS BEEN OBTAINED BY THE PROPERTY OWNER OR DEVELOPER.
 PERMITS WHICH AFFECT VERTICAL CONSTRUCTION INCLUDE THE
 FOUNDATION, VIBRO-FLOTATION, SOIL MIXING, PRESSURE
 GROUTING AND FULL BUILDING PERMITS.
  
 1. PLEASE OBTAIN OR PROVIDE BUILDING PERMIT RELATED TO
 THE VERTICAL CONSTRUCTION OF THE NEW STRUCTURE ON SITE.
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 822-1426 [email protected]