Plan Review Details - Permit 22051220
Plan Review Stops For Permit 22051220
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-06-14 Cont ID  
Sent By rrossano Date 2022-06-14 Time   Rev Time 0.00
Received By rrossano Date 2022-06-14 Time   Sent To  
Notes
2022-06-14 11:59:56PASSED WITH PROVISOS:
  
 DO NOT CONSTRUCT DRIVEWAY ON TOP OF WATER METERS,
 SANITARY CLEANOUTS, STORMWATER INLETS ETC.
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) NOTE THAT
 SIDEWALK SECTION GOING THROUGH DRIVEWAY SHALL BE 6
 INCHES THICK, NOT 4 INCHES AS SJHOWN ON SUBMITTED
 DRAWING. CITY STANDARD DETAIL IS REQUIRED, SEE LINK
 BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 CONSTRUCTION.
  
 UPDATE SURVEY WITH REQUESTED INFORMATION AND RESUBMIT
 WITH A COPY OF THE APPLICABLE STANDARD DETAIL FOR
 DRIVEWAYS.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-05-31 Cont ID  
Sent By rrossano Date 2022-05-31 Time   Rev Time  
Received By rrossano Date 2022-05-31 Time   Sent To I
Notes
2022-05-31 08:44:19PLEASE ADDRESS ZONING COMMENTS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-06-14 Cont ID  
Sent By asangele Date 2022-06-14 Time 13:39 Rev Time 0.00
Received By asangele Date 2022-06-14 Time 13:39 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-06-01 Cont ID  
Sent By aoliver Date 2022-06-01 Time 09:22 Rev Time 0.00
Received By aoliver Date 2022-05-25 Time 10:38 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-06-14 Cont ID  
Sent By asangele Date 2022-06-14 Time 13:33 Rev Time 0.00
Received By asangele Date 2022-06-14 Time 13:39 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-05-27 Cont ID  
Sent By asangele Date 2022-05-27 Time 12:45 Rev Time 0.00
Received By asangele Date 2022-05-27 Time 12:45 Sent To  
Notes
2022-05-27 12:47:275/27/2022
 PLEASE PROVIDE A SURVEY WITH APPLICATION.
  
  
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved