| Plan Review Stops For Permit 22051099 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2022-10-28 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2022-10-28 |
Time |
13:43 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2022-10-28 |
Time |
13:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2022-09-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-09-24 |
Time |
11:38 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-09-24 |
Time |
11:38 |
Sent To |
|
|
| Notes |
| 2022-09-24 11:39:48 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 3RD REVIEW, IT APPEARS THE SAME ENGINEERING WAS | | | SUBMITTED. I CANNOT LOCATE G007209, G007210 ON THE | | | ENGINEERING SUBITTED. PLEASE ADVISE - WHICH PAD IS | | | PROPOSED? | | | | | | 1. THE TWO MODELS ON THE GENERATOR SPECS (G007209, | | | 7210) ARE NOT INCLUDED ON THE PAD ENGINEERING. PLEASE | | | ADVISE WHICH PAD IS PROPOSED SO COMPLIANCE CAN BE | | | VERIFIED. | | | | | | THIS CAN BE DONE WITH A RESPONSE LETTER. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-09-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-09-01 |
Time |
16:33 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-09-01 |
Time |
16:33 |
Sent To |
|
|
| Notes |
| 2022-09-01 16:36:37 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. THE TWO MODELS ON THE GENERATOR SPECS (G007209, | | | 7210) ARE NOT INCLUDED ON THE PAD ENGINEERING. PLEASE | | | ADVISE WHICH PAD IS PROPOSED SO COMPLIANCE CAN BE | | | VERIFIED. | | | | | | THIS CAN BE DONE WITH A RESPONSE LETTER. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-07-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-21 |
Time |
15:27 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-21 |
Time |
15:27 |
Sent To |
|
|
| Notes |
| 2022-07-21 15:27:44 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. FBC R 303.5, REVISE SITE PLAN, TO SHOW COMPLIANCE | | | WITH THE 10' SEPARATION TO INTAKE OPENINGS. | | | | | | 2. FBC R 301, PROVIDE A STRUCTURAL DETAIL FOR THE | | | GENERATOR SLAB AND ANCHORING. THIS IS TO INCLUDE WIND | | | DESIGN CRITERIA (WIND SPEED, EXPOSURE CLASSIFICATION). | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-06-10 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-06-10 |
Time |
16:51 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-06-10 |
Time |
16:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-10-28 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2022-10-28 |
Time |
13:44 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2022-09-27 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-09-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-09-24 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-09-08 |
Time |
15:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-09-06 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2022-09-06 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2022-09-06 |
Time |
14:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-07-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-21 |
Time |
15:27 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-06-07 |
Time |
07:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2022-10-28 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2022-10-28 |
Time |
13:44 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2022-10-28 |
Time |
13:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-09-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-09-24 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-09-24 |
Time |
11:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2022-07-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-21 |
Time |
15:27 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-21 |
Time |
15:27 |
Sent To |
|
|
| Notes |
| 2022-06-10 16:52:05 | ELECTRICAL SIGNATURE APPROVED JLEAHY |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-09-06 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2022-09-06 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2022-09-06 |
Time |
14:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-06-13 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2022-06-13 |
Time |
08:51 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2022-06-13 |
Time |
08:51 |
Sent To |
|
|
| Notes |
|
|