Plan Review Stops For Permit 22050879
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-05-28 Cont ID  
Sent By cpuell Date 2022-05-28 Time 11:16 Rev Time 0.00
Received By cpuell Date 2022-05-28 Time 11:16 Sent To  
Notes
2022-05-28 11:16:56ADDRESS APPROPRIATE FOR PROJECT.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-01-25 Cont ID  
Sent By mpeterso Date 2023-01-25 Time 13:27 Rev Time 0.00
Received By mpeterso Date 2023-01-25 Time 13:26 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-06-10 Cont ID  
Sent By mpeterso Date 2022-06-10 Time 12:58 Rev Time 0.00
Received By mpeterso Date 2022-06-10 Time 12:48 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status N Date 2023-03-28 Cont ID  
Sent By eschneid Date 2023-03-28 Time 17:31 Rev Time 0.00
Received By eschneid Date 2023-03-28 Time   Sent To  
Notes
2023-03-28 17:31:47ENG REVIEW UNDER WCF PERMIT 21120297

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2022-06-16 Cont ID  
Sent By eschneid Date 2022-06-16 Time 14:39 Rev Time 0.00
Received By eschneid Date 2022-06-16 Time   Sent To  
Notes
2022-06-16 14:40:10ENG REVIEW UNDER WCF PERMIT 21120297

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-03-29 Cont ID  
Sent By lmarchan Date 2023-03-29 Time 10:58 Rev Time 0.00
Received By lmarchan Date 2023-01-18 Time 09:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-06-16 Cont ID  
Sent By aoliver Date 2022-06-16 Time 14:59 Rev Time 0.00
Received By aoliver Date 2022-05-23 Time 06:29 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-01-25 Cont ID  
Sent By mpeterso Date 2023-01-25 Time 13:29 Rev Time 0.00
Received By mpeterso Date 2023-01-25 Time 13:27 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-06-10 Cont ID  
Sent By mpeterso Date 2022-06-10 Time 12:59 Rev Time 0.00
Received By mpeterso Date 2022-06-10 Time 12:59 Sent To  
Notes
2022-06-10 13:00:23ALL PLANS PASSED SIGNATURE REVIEW

Review Stop Z ZONING
Rev No 2 Status P Date 2023-03-29 Cont ID  
Sent By eschneid Date 2023-03-29 Time 09:22 Rev Time 0.25
Received By eschneid Date 2023-03-28 Time 17:30 Sent To  
Notes
2023-03-28 17:32:09THE POLE STYLE AND HEIGHT MEET CITY REQUIREMENTS. THE
 POLE COLOR AT THIS LOCATION SHALL BE RAL/RAYCAP 7042
 TRAFFIC GREY A.
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 2022-06-16 Cont ID  
Sent By eschneid Date 2022-06-16 Time 14:39 Rev Time 0.50
Received By eschneid Date 2022-06-16 Time 14:38 Sent To  
Notes
2022-06-16 14:39:27FAILED
  
 1) THE SUBMITTED COMMUNICATION FACILITY PLACEMENT
 PERMIT - CITY RIGHTS-OF-WAY (21120297) MUST BE APPROVED
 PRIOR TO THIS PERMIT BEING APPROVED. THE PLANS ON THIS
 ELECTRIC PERMIT AND THE ONES ULTIMATELY RESUBMITTED
 WITH THE WCF ROW PERMIT NEED TO MATCH.
  
 2) THE SURVEY PROVIDE WITH THIS PERMIT HAS NOT BEEN
 UPDATED AND STILL INCLUDES THE ORIGINAL POLE LOCATION.
 ALL SUBMITTED PLANS AND DOCUMENTS NEED TO SHOW
 ACCURATE, CONSISTENT INFORMATION.
  
 3) THE PLANS SHOW THE BORE PITS BEING DUG WITH AN
 UNDERGROUND ELECTRIC LINE RUNNING THROUGH THEM AND THE
 HANDHOLE INSTALLED ON TOP OF A COMCAST LINE. IN ORDER
 TO VERIFY THAT THE INSTALLATION WILL NOT INTERFERE WITH
 THE EXISTING FACILITIES, PROVIDE A PUBLIC UTILITY
 LETTER OF NO OBJECTION FROM FPL AND COMCAST REGARDING
 THE INSTALLATION.
  
 4) THE POLE STYLE, HEIGHT AND COLOR MEET CITY
 REQUIREMENTS.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved