Plan Review Details - Permit 22050472
Plan Review Stops For Permit 22050472
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-07-20 Cont ID  
Sent By shill Date 2022-07-20 Time 09:47 Rev Time 0.00
Received By shill Date 2022-07-20 Time 09:47 Sent To  
Notes
2022-07-20 09:47:53PROVISO - UPDATE SHEET 3 OF 3, SPECIFICATIONS, NOTE 1
 TO
 COMPLY WITH FBC R 4501.6.1 (ANSI/APSP/ICC3, 4, 5, 6, 7)
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-06-27 Cont ID  
Sent By ppetty Date 2022-06-27 Time 10:12 Rev Time 0.00
Received By ppetty Date 2022-06-27 Time 09:17 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-08-22 Cont ID  
Sent By jleahy Date 2022-08-22 Time 09:00 Rev Time 0.00
Received By jleahy Date 2022-08-19 Time 08:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-07-29 Cont ID  
Sent By jgomez Date 2022-07-29 Time 14:47 Rev Time 0.00
Received By jgomez Date 2022-07-28 Time 08:13 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-07-20 Cont ID  
Sent By shill Date 2022-07-20 Time 09:49 Rev Time 0.00
Received By shill Date 2022-06-07 Time 05:26 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-06-15 Cont ID  
Sent By ccole Date 2022-06-15 Time 12:30 Rev Time 0.00
Received By ccole Date 2022-06-15 Time 12:13 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-08-22 Cont ID  
Sent By jleahy Date 2022-08-22 Time 09:00 Rev Time 0.00
Received By jleahy Date 2022-08-22 Time 08:58 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-07-29 Cont ID  
Sent By jgomez Date 2022-07-29 Time 14:43 Rev Time 0.00
Received By jgomez Date 2022-07-29 Time 14:32 Sent To  
Notes
2022-07-29 14:37:36SIGNATURE REVIEW
  
 1- CALCULATIONS UPLOADED TO PROJECTDOX HAVE AN
 ENGINEER'S SELF CERTIFIED DIGITAL SIGNATURE. ENGINEER
 CAN NOT SELF CERTIFY THE DIGITAL SIGNATURE. THIRD PARTY
 CERTIFICATION IS REQUIRED BY FAC 61G15-23.004.
 NOTE: POOL DRAWINGS SUBMITTED HAVE THIRD PARTY DIGITAL
 SIGNATURE CERTIFICATION. PLEASE UPLOAD DRAWINGS TO
 PROJECTDOX WITH THE ENGINEER'S DIGITAL SIGNATURE
 WITHOUT SELF CERTIFICATION
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-06-15 Cont ID  
Sent By ccole Date 2022-06-15 Time 12:31 Rev Time 0.00
Received By ccole Date 2022-06-15 Time 12:31 Sent To  
Notes
2022-06-15 12:24:58SIGNATURE REVIEW
 6/16/2022
  
 THE TOTAL DYNAMIC HEAD CALCULATIONS ARE NOT DIGITALLY
 SIGNED AND SEALED BY THE ENGINEER OF RECORD- FL STATUTE
 471.025 AND SECTION 61G15-23.005 FLORIDA ADMINISTRATIVE
 CODE.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2022-06-14 Cont ID  
Sent By vbroglia Date 2022-06-14 Time 09:27 Rev Time 0.00
Received By vbroglia Date 2022-06-14 Time 09:27 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved