Plan Review Details - Permit 22050323
Plan Review Stops For Permit 22050323
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-06-21 Cont ID  
Sent By cpuell Date 2022-06-21 Time 11:47 Rev Time 0.00
Received By cpuell Date 2022-06-21 Time 11:47 Sent To  
Notes
2022-06-21 11:48:28ADDRESS APPROPRIATE FOR PROJECT

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status F Date 2023-03-17 Cont ID  
Sent By cthroop Date 2023-03-17 Time 14:52 Rev Time 0.00
Received By cthroop Date 2023-03-17 Time 14:47 Sent To  
Notes
2023-03-17 14:55:522ND BUILDING REVIEW DEMO ASBESTOS
 RESULTS: CORRECTIONS NEEDED
  
 CHRISTOPHER S. THROOP, CBO, BU, BN, PX, CFM
 PLANS EXAMINER II
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NFPA 70 2017 EDITION NEC 2017
  
 ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT:
  
 1. ASBESTOS LETTER REQUIRES A VALID SIGNATURE.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-07-23 Cont ID  
Sent By shill Date 2022-07-23 Time 10:33 Rev Time 0.00
Received By shill Date 2022-07-23 Time 10:33 Sent To  
Notes
2022-07-23 10:33:50PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-03-17 Cont ID  
Sent By cthroop Date 2023-03-17 Time 14:56 Rev Time 0.00
Received By cthroop Date 2023-03-17 Time 14:47 Sent To  
Notes
2023-03-17 14:59:102ND BUILDING REVIEW DEMO
 RESULTS: CORRECTIONS NEEDED
  
 CHRISTOPHER S. THROOP, CBO, BU, BN, PX, CFM
 PLANS EXAMINER II
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NFPA 70 2017 EDITION NEC 2017
  
 ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT:
  
 1. SEWER LATERAL CAPPING. SCHEDULE AND PASS A 703,
 PLUMBING FINAL, UNDER PERMIT 22050959.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-07-23 Cont ID  
Sent By shill Date 2022-07-23 Time 10:31 Rev Time 0.00
Received By shill Date 2022-07-23 Time 10:28 Sent To  
Notes
2022-07-23 10:33:14****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. FBC B 3303, SEWER LATERAL CAPPING PERMIT IS REQUIRED
 (SUBMIT APPLICATION TO BUILDING DIVISION); SCHEDULE A
 FINAL PLUMBING #703. AFTER FINAL INSPECTION, PLEASE
 UPLOAD EVIDENCE OF COMPLETED INSPECTION AND RESUBMIT
 VIA PROJECTDOX SO THIS APPLICATION WILL BE PUT BACK
 INTO THE QUEUE FOR PLAN REVIEW.
  
 2. FBC 107, SUBMIT A STORMWATER POLLUTION PREVENTION
 PLAN.
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-03-20 Cont ID  
Sent By lquinone Date 2023-03-20 Time 09:58 Rev Time 0.00
Received By lquinone Date 2023-03-20 Time 09:58 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-06-22 Cont ID  
Sent By rrossano Date 2022-06-22 Time   Rev Time  
Received By rrossano Date 2022-06-22 Time   Sent To  
Notes
2022-06-22 11:56:41PLEASE PROVIDE STORMWATER POLLUTION PREVENTION PLAN -
 SILT FENCE AROUND PROPERTY TO PREVENT DEBRIS RUNOFF;
 PROTECT ROADWAY FROM TRACKING OF DIRT FROM TRUCKS
 HAULING DEBRIS; PROTECT ANY STORM DRAIN INLETS IN
 VICINITY USING BEST MANAGEMENT PRACTICES (FILTER
 FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-06-30 Cont ID  
Sent By amhamilt Date 2022-06-30 Time 10:14 Rev Time 0.00
Received By amhamilt Date 2022-06-30 Time 10:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-03-21 Cont ID  
Sent By aoliver Date 2023-03-21 Time 09:25 Rev Time 0.00
Received By aoliver Date 2023-03-13 Time 16:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-07-23 Cont ID  
Sent By shill Date 2022-07-23 Time 10:34 Rev Time 0.00
Received By shill Date 2022-06-21 Time 05:38 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-07-23 Cont ID  
Sent By shill Date 2022-07-23 Time 10:34 Rev Time 0.00
Received By shill Date 2022-07-23 Time 10:33 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-06-30 Cont ID  
Sent By amhamilt Date 2022-06-30 Time 10:14 Rev Time 0.00
Received By amhamilt Date 2022-06-30 Time 10:14 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved