Plan Review Details - Permit 22041506
Plan Review Stops For Permit 22041506
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2022-05-04 Cont ID  
Sent By cpuell Date 2022-05-04 Time 16:11 Rev Time 0.00
Received By cpuell Date 2022-05-04 Time 16:11 Sent To  
Notes
2022-05-04 16:12:20NORTH BUILDING READDRESSED AND GIVEN THE ADDRESS OF
 4561 LAKE AVE.

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2022-04-30 Cont ID  
Sent By cpuell Date 2022-04-30 Time 09:34 Rev Time 0.00
Received By cpuell Date 2022-04-30 Time 09:34 Sent To  
Notes
2022-04-30 09:59:02PLEASE HAVE OWNER CONTACT [email protected] OR CALL
 561-805-6659 TO DISCUSS READDRESSING THE NORTH
 BUILDING.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-07-20 Cont ID  
Sent By shill Date 2022-07-20 Time 17:31 Rev Time 0.00
Received By shill Date 2022-07-20 Time 17:31 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-06-09 Cont ID  
Sent By shill Date 2022-06-09 Time 12:33 Rev Time 0.00
Received By shill Date 2022-06-09 Time 12:33 Sent To  
Notes
2022-06-09 12:35:17REVISE PLAN TO SHOW HOW WATER WILL NOT DRAIN ONTO THE
 ADJACENT PROPERTIES. THE PAVED AREA IS SHOWN AS GOING
 TO THE PROPERTY LINES. STORMWATER CANNOT NEGATIVELY
 IMPACT OTHER PROPERTIES AS A RESULT OF THIS
 IMPROVEMENT. SINCE THE CONCRETE AREA TAKES UP SO MUCH
 SPACE, IT APPEARS THAT DRAINS WILL BE REQUIRED. FBC107
  
 [email protected]
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status N Date 2022-06-22 Cont ID  
Sent By rrossano Date 2022-06-22 Time   Rev Time 0.00
Received By rrossano Date 2022-06-22 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-05-04 Cont ID  
Sent By rrossano Date 2022-05-04 Time   Rev Time  
Received By rrossano Date 2022-05-04 Time   Sent To  
Notes
2022-05-04 10:02:59PASSED WITH PROVISO ; ADDRESS ANY OTHER OUTSTANDING
 REVIEWS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-07-20 Cont ID  
Sent By shill Date 2022-07-20 Time 17:31 Rev Time 0.00
Received By shill Date 2022-06-14 Time 12:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-06-09 Cont ID  
Sent By shill Date 2022-06-09 Time 12:35 Rev Time 0.00
Received By shill Date 2022-04-28 Time 14:10 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-06-09 Cont ID  
Sent By shill Date 2022-06-09 Time 12:35 Rev Time 0.00
Received By shill Date 2022-06-09 Time 12:35 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-06-21 Cont ID  
Sent By asangele Date 2022-06-21 Time 10:30 Rev Time 0.00
Received By asangele Date 2022-06-21 Time 10:30 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-05-10 Cont ID  
Sent By asangele Date 2022-05-10 Time 11:19 Rev Time 0.00
Received By asangele Date 2022-05-10 Time 11:19 Sent To  
Notes
2022-05-10 11:28:095/10/2022
 FAIL
 * THE IS A 3FT MIN. SETBACK FROM THE PROPERTY LINE TO
 WHERE A DRIVEWAY/PAVEMENT CAN BEGIN.
 * DRIVEWAY WIDTH CANNOT EXCEED 20FT
  
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]