| Plan Review Stops For Permit 22041104 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2022-10-18 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-18 |
Time |
08:51 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-18 |
Time |
08:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-07-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-22 |
Time |
09:35 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-22 |
Time |
09:34 |
Sent To |
|
|
| Notes |
| 2022-07-22 09:37:06 | | | | | | | CORRECTIONS NEEDED - | | | | | | 1) AL OF THE DRAWINGS PROVIDED NEED TO BE SIGNED BY THE | | | DESIGNER FBC WPB 107.1 | | | | | | 2) AL OF THE DRAWINGS PROVIDED DO NOT SHOW AS DIGITALLY | | | SIGNED IN ADOBE READER | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-05-05 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-05-05 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-05-05 |
Time |
10:19 |
Sent To |
|
|
| Notes |
| 2022-05-05 10:30:02 | REMODEL | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) BUILDING WAS BUILT UNDER THE FBC FHA REQUIREMENTS | | | AND IS REQUIRED TO MAINTAIN THOSE REQUIREMENTS - | | | KITCHEN LAYOUT DOES NOT APPEAR TO COMPLY WITH FBC FHA | | | REQUIREMENT 7 - USABLE KITCHENS AND BATHROOMS. | | | SECTION 100.205(C)(3)(IV) REQUIRES THAT COVERED | | | MULTIFAMILY DWELLINGS WITH A BUILDING ENTRANCE ON AN | | | ACCESSIBLE ROUTE SHALL BE DESIGNED AND CONSTRUCTED IN | | | SUCH A MANNER THAT ALL PREMISES WITHIN COVERED | | | MULTIFAMILY DWELLING UNITS CONTAIN USABLE KITCHENS AND | | | BATHROOMS SUCH THAT AN INDIVIDUAL IN A WHEELCHAIR CAN | | | MANEUVER ABOUT THE SPACE. (1)USABLE KITCHENS. USABLE | | | KITCHENS WOULD MEET SECTION 100.205(C)(3)(IV) IF: | | | | | | (A)A CLEAR FLOOR SPACE AT LEAST 30 INCHES BY 48 INCHES | | | THAT ALLOWS A PARALLEL APPROACH BY A PERSON IN A | | | WHEELCHAIR IS PROVIDED AT THE RANGE OR COOKTOP AND SINK | | | AND EITHER A PARALLEL OR FORWARD APPROACH IS PROVIDED | | | AT OVEN, DISH WASHER, REFRIGERATOR/FREEZER OR TRASH | | | COMPACTOR. (SEE FIGURE FHAG-6) | | | | | | CITY OF WEST PALM BEACH HAS AN EXCEPTION FORM - PLEASE | | | E MAIL ME IF YOU WOULD LIKE A COPY - [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2022-10-12 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-10-12 |
Time |
07:56 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-10-12 |
Time |
07:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-07-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-07-28 |
Time |
07:13 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-07-28 |
Time |
07:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-05-20 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-05-20 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-05-20 |
Time |
16:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2022-10-04 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-10-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-10-04 |
Time |
14:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2022-07-11 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-07-11 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-07-11 |
Time |
16:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2022-04-27 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-04-27 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-04-27 |
Time |
15:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-10-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-28 |
Time |
11:01 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-28 |
Time |
06:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-10-18 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-18 |
Time |
08:53 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-09-30 |
Time |
10:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-07-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-07-28 |
Time |
07:14 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-07-08 |
Time |
08:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-05-20 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-05-20 |
Time |
16:38 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-04-25 |
Time |
08:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2022-10-03 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-10-03 |
Time |
13:54 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-10-03 |
Time |
13:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2022-05-04 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-05-04 |
Time |
10:14 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-05-03 |
Time |
09:53 |
Sent To |
|
|
| Notes |
| 2022-05-04 10:16:15 | APPROVED BY LUIS BY MARKUP ON PLANS. HE DID NOT "OUT". | | | RESULT ENTERED INTO COMM PLUS BY RWB. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2022-10-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-28 |
Time |
11:01 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-28 |
Time |
11:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-18 08:52:39 | DRAWING E-1 DOES NOT SHOW AS ELECTRONICALLY/DIGITALLY | | | SIGNED | | 2022-10-03 13:56:53 | PLUMBING PAGE IS OK | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2022-07-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-22 |
Time |
09:36 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-22 |
Time |
09:36 |
Sent To |
|
|
| Notes |
| 2022-07-22 09:36:21 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) AL OF THE DRAWINGS PROVIDED NEED TO BE SIGNED BY THE | | | DESIGNER FBC WPB 107.1 | | | | | | 2) AL OF THE DRAWINGS PROVIDED DO NOT SHOW AS DIGITALLY | | | SIGNED IN ADOBE READER | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-05-05 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-05-05 |
Time |
10:32 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-05-05 |
Time |
10:32 |
Sent To |
|
|
| Notes |
| 2022-05-05 10:36:59 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) AL OF THE DRAWINGS PROVIDED NEED TO BE SIGNED BY THE | | | DESIGNER FBC WPB 107.1 | | | | | | 2) AL OF THE DRAWINGS PROVIDED DO NOT SHOW AS DIGITALLY | | | SIGNED IN ADOBE READER | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | |
|
|