| Plan Review Stops For Permit 22041031 |
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2022-05-22 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2022-05-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2022-05-22 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-05-22 21:27:42 | PASSED WITH PROVISOS: | | | | | | CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB | | | CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE | | | BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER), | | | OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR | | | EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD | | | DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG | | | /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS | | | | | | CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF | | | CONSTRUCTION. | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2022-05-09 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2022-05-09 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2022-05-09 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-05-09 08:44:20 | CITY TRANSPORTATION ENGINEER ADVISED THAT PER FDOT | | | DESIGN MANUAL, THE PROPOSED NEW DRIVEWAY WOULD NOT BE | | | FEASIBLE AS A 3 FEET CLEAR ZONE FROM THE DRIVEWAY FLARE | | | COULD NOT BE ESTABLISHED DUE TO THE PRESENCE OF FIXED | | | OBSTRUCTIONS (I.E. TREE AND UTILITY POLE) IN ITS | | | VICINITY. CITY TRANSPORTATION ENGINEER VALERIO ORICCHIO | | | CAN BE CONTACTED AT 561-494-1092. | | | | | | THANKS, | | | RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB | | | ENGINEERING SERVICES DEPARTMENT | | | DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: | | | (561) 246-9525 | | | EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/ | | | ENGINEERING/ENGINEERING-STANDARDS-DETAILS | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2022-04-28 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2022-04-28 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2022-04-28 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-04-28 09:35:32 | PER CITY CODE, THE PROPOSED NEW DRIVEWAY WOULD NOT MEET | | | THE DRIVEWAY SEPARATION CRITERIA | | | | | | PER FDOT DESIGN MANUAL, THE PROPOSED NEW DRIVEWAY WOULD | | | NOT BE FEASIBLE AS A 3 FEET CLEAR ZONE FROM THE | | | DRIVEWAY FLARE COULD NOT BE ESTABLISHED DUE TO THE | | | PRESENCE OF FIXED OBSTRUCTIONS (I.E. TREE AND UTILITY | | | POLE) IN ITS VICINITY | | | | | | THANKS, | | | RICK ROSSANO, SENIOR PROJECT COORDINATOR, | | | CITY OF WPB ENGINEERING SERVICES DEPARTMENT | | | DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: | | | (561) 246-9525 | | | EMAIL: [email protected] | | | | | | |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
3 |
Status |
P |
Date |
2022-06-01 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2022-06-01 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2022-06-01 |
Time |
15:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-05-12 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2022-05-12 |
Time |
11:45 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2022-05-12 |
Time |
11:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-04-28 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2022-04-28 |
Time |
10:38 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2022-04-28 |
Time |
10:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-06-01 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-06-01 |
Time |
16:53 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-05-23 |
Time |
08:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-05-13 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-05-13 |
Time |
09:47 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-05-02 |
Time |
11:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-04-29 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-04-29 |
Time |
09:18 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-04-20 |
Time |
11:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2022-05-26 |
|
|
Cont ID |
|
| Sent By |
afowlkes |
Date |
2022-05-26 |
Time |
14:12 |
Rev Time |
0.00 |
| Received By |
afowlkes |
Date |
2022-05-26 |
Time |
14:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2022-05-09 |
|
|
Cont ID |
|
| Sent By |
afowlkes |
Date |
2022-05-09 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
afowlkes |
Date |
2022-05-09 |
Time |
10:19 |
Sent To |
|
|
| Notes |
| 2022-05-09 10:20:54 | 05/09/22 FAILED - NEED TO KNOW HOW WIDE THE PROPOSED | | | DRIVEWAY WILL BE | | | | | | ALEXANDER FOWLKES | | | 5618221431 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-04-26 |
|
|
Cont ID |
|
| Sent By |
afowlkes |
Date |
2022-04-26 |
Time |
13:45 |
Rev Time |
0.00 |
| Received By |
afowlkes |
Date |
2022-04-26 |
Time |
13:43 |
Sent To |
|
|
| Notes |
| 2022-04-26 13:45:28 | 04/26/22 FAILED - PER CITY CODE, CORNER LOTS ARE | | | PERMITTED TWO DRIVEWAYS EACH WITH A WIDTH OF NO GREATER | | | THAN TEN FEET AT THE PROPERTY LINE OR WHERE THE | | | DRIVEWAY ADJOINS THE APRON IF THE APRON IS NOT LOCATED | | | WHOLLY WITHIN THE RIGHT-OF-WAY, PROVIDED THAT THE | | | DRIVEWAYS SHALL BE ON TWO DIFFERENT STREET FRONTAGES OR | | | ON ONE STREET FRONTAGE AND THE ALLEY. BECAUSE THE | | | PROPOSED DRIVEWAYS ARE LOCATED ON THE SAME STREET | | | FRONTAGE, THE PROPOSED SECONDARY DRIVEWAY IS NOT | | | PERMITTED | | | | | | ALEXANDER FOWLKES | | | 5618221431 | | | [email protected] |
|
|