Plan Review Details - Permit 22040928
Plan Review Stops For Permit 22040928
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-07-05 Cont ID  
Sent By pvalenti Date 2022-07-05 Time 10:59 Rev Time 0.00
Received By pvalenti Date 2022-07-05 Time 10:51 Sent To  
Notes
2022-07-05 12:46:49PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW APPROVED WITH PROVISO:
  
 PRIOR TO DRYWALL INSTALLATION, THE FIELD INSPECTOR WILL
 NEED ACCESS TO OBSERVE CONDITION OF EXISTING FRAMING
 MEMBERS.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-07-05 Cont ID  
Sent By pvalenti Date 2022-07-05 Time 11:00 Rev Time 0.00
Received By pvalenti Date 2022-05-03 Time 09:17 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2022-06-03 Cont ID  
Sent By ccole Date 2022-05-04 Time 14:15 Rev Time 0.00
Received By ccole Date 2022-05-04 Time 12:38 Sent To  
Notes
2022-05-04 14:16:38 
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-06-27 Cont ID  
Sent By rwbrown Date 2022-06-27 Time 11:55 Rev Time 0.00
Received By rwbrown Date 2022-06-27 Time 11:55 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved