| 2022-06-07 11:13:47 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR EMAIL [email protected]. |
| | |
| | 1. FBC B 107.2.1. SUBMITTED MIAMI-DADE COUNTY NOA NO. |
| | 20-0221.02 HAS EXPIRED AND IS NO LONGER VALID. PROVIDE |
| | A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| | APPROVALS/NOA'S FOR THE PROPOSED ROOF UNDERLAYMENT |
| | SYSTEM TO BE USED. ALL APPLICABLE DETAILS AND |
| | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT |
| | APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS NOT |
| | SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED |
| | SITE-SPECIFIC ENGINEERING |
| | 2. FBC B 107.3.4.1. SUBMITTED MIAMI-DADE COUNTY NOA |
| | NO.: 21-0614.04 & MIAMI-DADE COUNTY NOA NO.: 18-0123.07 |
| | ALONG WITH THE 2020 CODE VERSION PRODUCT |
| | APPROVALS/NOA'S FOR THE PROPOSED ROOF UNDERLAYMENT |
| | SYSTEM TO BE USED SHALL BE SUBMITTED TO THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| | REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL |
| | WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. ALL APPLICABLE DETAILS AND |
| | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT |
| | APPROVAL DRAWINGS. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |