Plan Review Details - Permit 22040585
Plan Review Stops For Permit 22040585
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2022-04-20 Cont ID  
Sent By cpuell Date 2022-04-20 Time 15:15 Rev Time 0.00
Received By cpuell Date 2022-04-20 Time 15:15 Sent To  
Notes
2022-04-20 15:16:08SCOPE OF WORK IS FOR THE WHOLE FLOOR WHICH HAS BEEN
 ASSIGNED THE ADDRESS OF 625 N FLAGLER DR # 400, UPDATED
 PERMIT.

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2022-04-20 Cont ID  
Sent By cpuell Date 2022-04-20 Time 13:18 Rev Time 0.00
Received By cpuell Date 2022-04-20 Time 13:18 Sent To  
Notes
2022-04-20 13:19:02SUITE NUMBER NEEDS TO BE ASSIGNED TO THE FOURTH FLOOR,
 WHO MANY SUITES ARE REQUIRED FOR THE FOURTH FLOOR.
 PLEASE RESPOND TO [email protected] OR CALL 561-805-6659

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 3 Status P Date 2022-06-09 Cont ID  
Sent By lmarchan Date 2022-06-09 Time 16:42 Rev Time 0.00
Received By lmarchan Date 2022-06-09 Time 16:42 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status F Date 2022-06-09 Cont ID  
Sent By lmarchan Date 2022-06-09 Time 15:41 Rev Time 0.00
Received By lmarchan Date 2022-06-09 Time 15:41 Sent To  
Notes
2022-06-09 15:41:40TO THE BUILDING CONTRACTOR:
 PALM BEACH COUNTY HEALTH DEPARTMENT NEEDS VERIFICATION
 THE CONTRACTORS ARE AWARE OF THIS FL. STATE STATUTE.
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN
 PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE
 INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT
 LINE.
  
 JAMES A. WITMER BN, PX, SFP, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST. WEST PALM BEACH. FL 33402
 TEL: 561-805-6717
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-05-18 Cont ID  
Sent By jwitmer Date 2022-05-18 Time 13:48 Rev Time  
Received By jwitmer Date   Time   Sent To  
Notes
2022-05-18 13:48:46TO THE BUILDING CONTRACTOR:
 PALM BEACH COUNTY HEALTH DEPARTMENT NEEDS VERIFICATION
 THE CONTRACTORS ARE AWARE OF THIS FL. STATE STATUTE.
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN
 PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE
 INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT
 LINE.
  
 JAMES A. WITMER BN, PX, SFP, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST. WEST PALM BEACH. FL 33402
 TEL: 561-805-6717
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2022-07-05 Cont ID  
Sent By jwitmer Date 2022-07-05 Time 11:55 Rev Time 0.00
Received By jwitmer Date 2022-07-05 Time 11:40 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-06-27 Cont ID  
Sent By jwitmer Date 2022-06-27 Time 15:24 Rev Time 0.00
Received By jwitmer Date 2022-06-27 Time 15:09 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-06-09 Cont ID  
Sent By shill Date 2022-06-09 Time 10:58 Rev Time 0.00
Received By shill Date 2022-06-09 Time 10:58 Sent To  
Notes
2022-06-09 10:58:45REVIEWED NEW PAGES ONLY

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-05-18 Cont ID  
Sent By jwitmer Date 2022-05-18 Time 14:26 Rev Time 0.00
Received By jwitmer Date 2022-05-18 Time 13:48 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2022-07-08 Cont ID  
Sent By mpeterso Date 2022-07-08 Time 15:53 Rev Time 0.00
Received By mpeterso Date 2022-07-08 Time 15:47 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2022-06-28 Cont ID  
Sent By mpeterso Date 2022-06-28 Time 15:05 Rev Time 0.00
Received By mpeterso Date 2022-06-28 Time 15:04 Sent To  
Notes
2022-06-28 15:05:33SEE SIGNATURE REVIEW

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-06-06 Cont ID  
Sent By mpeterso Date 2022-06-06 Time 10:55 Rev Time 0.00
Received By mpeterso Date 2022-06-06 Time 10:55 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-05-25 Cont ID  
Sent By mpeterso Date 2022-05-25 Time 11:35 Rev Time 0.00
Received By mpeterso Date 2022-05-25 Time 11:19 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status   Date   Cont ID  
Sent By parking Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 2022-07-05 Cont ID  
Sent By cwalker Date 2022-07-05 Time   Rev Time 0.00
Received By cwalker Date   Time   Sent To  
Notes
2022-07-05 11:22:07FIRE PROVISO COMMENTS:
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS.
 ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM INCLUDING
 DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP
 DRAWINGS.
 ALL CARD READER/ACCESS CONTROL SHALL BE INSTALLED UNDER
 SEPARATE PERMITS AND SHOP DRAWINGS.
 ACCESS CONTROL SHALL COMPLY WITH NFPA 101, CHAPTER 7,
 MEANS OF EGRESS AND RELATED CODES AS APPLICABLE.
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2022-06-15 Cont ID  
Sent By pleduc Date 2022-06-15 Time   Rev Time 0.00
Received By pleduc Date 2022-06-15 Time 12:02 Sent To  
Notes
2022-06-15 12:03:33FIRE PROVISO:
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING
 DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP
 DRAWINGS.
  
 ALL CARD READER/ACCESS CONTROL SHALL BE INSTALLED UNDER
 SEPARATE PERMIT AND SHOP DRAWINGS.
  
 ACCESS CONTROL SHALL COMPLY WITH NFPA 101, CH 7 MEANS
 OF EGRESS AND RELATED CODES WHERE APPLICABLE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-06-06 Cont ID  
Sent By pleduc Date 2022-06-06 Time   Rev Time 0.00
Received By pleduc Date 2022-06-06 Time 09:58 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-04-21 Cont ID  
Sent By pleduc Date 2022-04-21 Time   Rev Time 0.00
Received By pleduc Date 2022-04-21 Time 11:26 Sent To  
Notes
2022-04-21 13:49:57FIRE PROVISO:
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING
 DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP
 DRAWINGS.
  
 ALL CARD READER/ACCESS CONTROL SHALL BE INSTALLED UNDER
 SEPARATE PERMIT AND SHOP DRAWINGS.
  
 ACCESS CONTROL SHALL COMPLY WITH NFPA 101, CH 7 MEANS
 OF EGRESS AND RELATED CODES WHERE APPLICABLE.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2022-06-09 Cont ID  
Sent By jesmith Date 2022-06-09 Time 14:51 Rev Time 0.00
Received By jesmith Date 2022-06-09 Time 14:50 Sent To  
Notes
2022-06-09 14:51:2522040585 625 N FLAGLER DR # 400
  
 GAS COMMENTS: APPROVED
  
 ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD
 INSPECTOR'S APPROVAL
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 CITY OF WEST PALM BEACH GAS PIPING AFFIDAVIT OR
 MANOMETER TEST DOCUMENT REQUIRED AT JOBSITE FOR FINAL
 GAS INSPECTION. CALL 561-805-6692 FOR FURTHER
 INFORMATION
  
 INSTALLATION MANUALS FOR GENERATOR & SECONDARY
 REGULATOR SHALL BE ONSITE FOR GAS INSPECTION.
  
 PROVISO: PER FBC FG 410.2.7, A UNION SHALL BE INSTALLED
 WITH-IN 1 FOOT OF EITHER SIDE OF THE SECONDARY
 REGULATOR

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2022-05-05 Cont ID  
Sent By jesmith Date 2022-05-05 Time 16:51 Rev Time 0.00
Received By jesmith Date 2022-05-05 Time 13:29 Sent To  
Notes
2022-05-05 16:45:08CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 22040585 625 N FLAGLER DR # 400
 1ST REVIEW
  
 GAS COMMENTS: DENIED
  
  
 1. PER WPB FBC 107.2.1, SHOW ALL REGULATORS AND SHUT
 OFF VALVES (INCLUDING THE METER/REGULATOR) ON THE RISER
 DIAGRAM.
  
  
 2. P3.02: PER WPB FBC 107.2.1, PLEASE TAG PIPE LENGTHS
 ON RISER DIAGRAM AND MATCH WITH PIPE LENGTHS ON LONGEST
 RUN CHART. CHART SHOWS ALL LENGTHS AS G2 PIPING SYSTEM
 (IT IS UNDERSTOOD THAT THE SYSTEM IS G2). I AM BETTER
 SERVED TO REVIEW IF YOU TAG EACH LENGTH IN THE CHART
 SEQUENTIALLY; I.E. G1, G2, G3, ETC. SHOW THE METER; THE
 UNDERGROUND SECTION EXTENDING TO THE METER/REGULATOR
 SHALL BE TAGGED AND INCLUDED IN THE CALCULATIONS.
  
  
 3. PER WPB FBC 102.1, PLEASE PROVIDE DETAIL AND
 MANUFACTURER'S SPECIFICATION/INSTALLATION MANUAL FOR
 EMERGENCY GENERATOR EXHAUST.
  
  
 4. PER WPB FBC 102.1, PLEASE PROVIDE A GROUND FLOOR
 PLAN SHOWING LOCATION OF THE GAS METER/REGULATOR. PER
 WPB FBC 107.2.1, THE SIZING CALCULATIONS SHALL INCLUDE
 EXTENSION OF UNDERGROUND PIPING TO THE METER.
  
  
 5. PER WPB FBC 107.2.1, PLEASE SPECIFY THE FITTINGS AND
 JOINTS TO BE USED IN THE SCHEDULE 40 STEEL PIPING
 SYSTEM NOTED IN SUBMITTED FBC FG TABLE 402.4(2).
  
  
 6. PER FBC FG 616.1, PERMANENTLY INSTALLED EQUIPMENT
 POWERED BY INTERNAL COMBUSTION ENGINES AND TURBINES
 SHALL BE INSTALLED IN ACCORDANCE WITH THE
 MANUFACTURER'S INSTRUCTIONS AND NFPA 37. PER WPB FBC
 107.2.1, PROVIDE MANUFACTURER'S
 SPECIFICATION/INSTALLATION MANUAL FOR THE EMERGENCY
 GENERATOR.
  
  
 7. P4.00/GAS CONNECTION DETAIL:
 ***A) PER FBC FG 616.2, EQUIPMENT POWERED BY INTERNAL
 COMBUSTION ENGINES AND TURBINES SHALL NOT BE RIGIDLY
 CONNECTED TO THE GAS SUPPLY PIPING. PER WPB FBC
 107.2.1, SHOW ON DETAIL AND SPECIFY A FLEXIBLE
 CONNECTOR.
 ***B) PER WPB FBC 107.2.1, DETAIL SHALL REFLECT
 CONDITIONS OF THE RISER DIAGRAM, RISING THROUGH THE
 SLAB AND CONNECTING.
 ***C) PER WPB FBC 107.2.1, PROVIDE SUPPORT STRUCTURE(S)
 FOR THE HORIZONTAL RIDGED PORTION OF THE PIPING IN
 ACCORDANCE WITH FBC FG 407.2.
 ***D) PER FBC FG 410.2.7, THE UNION SHALL BE INSTALLED
 WITHIN 1 FOOT OF EITHER SIDE OF THE REGULATOR.
  
  
 8. SPECIFY THE SECONDARY REGULATOR. SUBMIT
 MANUFACTURER'S SPECIFICATIONS FOR THE PRESSURE
 REGULATOR. REGULATORS INSTALLED ON THE EXTERIOR OF THE
 BUILDING SHALL BE APPROVED FOR OUTDOOR INSTALLATION.
 PER FBC FG 410.1.
  
  
 9. PROVIDE MATERIAL SPECIFICATION FOR UNDERGROUND
 PIPING (NOTED ON P3.02 GAS RISER DIAGRAM).
 ***A) PER FBC FG 404.11, STEEL PIPE OR TUBING EXPOSED
 TO CORROSIVE ACTION, SUCH AS SOIL CONDITION OR
 MOISTURE, SHALL BE PROTECTED IN ACCORDANCE WITH
 SECTIONS 404.11.1 THROUGH 404.11.5.
 *****1) 404.11.: GALVANIZING.
 ZINC COATING SHALL NOT BE DEEMED ADEQUATE PROTECTION
 FOR UNDERGROUND GAS PIPING.
 *****2) 404.11.2: PROTECTION METHODS.
 UNDERGROUND PIPING SHALL COMPLY WITH ONE OR MORE OF THE
 FOLLOWING:
 ***AA.THE PIPING SHALL BE MADE OF CORROSION-RESISTANT
 MATERIAL THAT IS SUITABLE FOR THE ENVIRONMENT IN WHICH
 IT WILL BE INSTALLED.
 ***BB.PIPE SHALL HAVE A FACTORY-APPLIED, ELECTRICALLY
 INSULATING COATING. FITTINGS AND JOINTS BETWEEN
 SECTIONS OF COATED PIPE SHALL BE COATED IN ACCORDANCE
 WITH THE COATING MANUFACTURER'S INSTRUCTIONS.
 ***CC.THE PIPING SHALL HAVE A CATHODIC PROTECTION
 SYSTEM INSTALLED AND THE SYSTEM SHALL BE MONITORED AND
 MAINTAINED IN ACCORDANCE WITH AN APPROVED PROGRAM.
  
 ***B) PLEASE NOTE THAT IF PLASTIC PIPE IS USED IN
 ACCORDANCE WITH FBC FG 404.17, A CORRESPONDING SIZING
 TABLE SHALL BE PROVIDED.
  
  
 10. PER WPB FBC 107.2.1, PROVIDE A DETAIL OF THE
 UNDERGROUND PIPING TRANSITIONS TO ABOVE GROUND.
  
  
 11. PER WPB FBC 107.2.1, PROVIDE A DETAIL OF THE
 METER/REGULATOR AND DOWNSTREAM PIPING
  
  
 12. THE INSTALLATION MANUALS FOR ALL GAS APPLIANCES /
 EQUIPMENT SHALL BE ONSITE AT THE TIME OF INSPECTION PER
 FBC FG 305.1
  
  
 END OF COMMENTS.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER PX928
 PLUMBING INSPECTOR BN2148
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2022-07-08 Cont ID  
Sent By mpeterso Date 2022-07-08 Time 15:53 Rev Time 0.00
Received By mpeterso Date 2022-07-01 Time 07:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-06-30 Cont ID  
Sent By jesmith Date 2022-06-30 Time 09:36 Rev Time 0.00
Received By jesmith Date 2022-06-30 Time 09:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-06-09 Cont ID  
Sent By lmarchan Date 2022-06-09 Time 15:41 Rev Time 0.00
Received By lmarchan Date 2022-06-09 Time 15:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-05-25 Cont ID  
Sent By mpeterso Date 2022-05-25 Time 11:39 Rev Time 0.00
Received By mpeterso Date 2022-04-20 Time 07:55 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status N Date 2022-05-18 Cont ID  
Sent By jwitmer Date 2022-05-18 Time 13:49 Rev Time  
Received By jwitmer Date   Time   Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2022-07-05 Cont ID  
Sent By medwards Date 2022-07-05 Time 15:58 Rev Time 0.00
Received By medwards Date 2022-07-05 Time 15:58 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2022-06-07 Cont ID  
Sent By medwards Date 2022-06-07 Time 10:54 Rev Time 0.00
Received By medwards Date 2022-06-07 Time 10:54 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2022-05-23 Cont ID  
Sent By medwards Date 2022-05-23 Time 07:50 Rev Time 0.00
Received By medwards Date 2022-05-23 Time 07:50 Sent To  
Notes
***NONE***

Review Stop MEDGAS MEDICAL GAS
Rev No 2 Status P Date 2022-06-09 Cont ID  
Sent By jesmith Date 2022-06-09 Time 15:19 Rev Time 0.00
Received By jesmith Date 2022-06-09 Time 15:18 Sent To  
Notes
2022-06-09 15:18:4722040585 625 N FLAGLER DR # 400
  
 MEDGAS COMMENTS: APPROVED
  
 ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD
 INSPECTOR'S APPROVAL
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 MANUFACTURER'S SPECIFICATION/INSTALLATION MANUALS FOR
 CO2 EQUIPMENT SHALL BE ON SITE FOR INSPECTION
  

Review Stop MEDGAS MEDICAL GAS
Rev No 1 Status F Date 2022-05-12 Cont ID  
Sent By jesmith Date 2022-05-12 Time 16:37 Rev Time 0.00
Received By jesmith Date 2022-05-11 Time 14:53 Sent To  
Notes
2022-05-12 16:36:59CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION
 NFPA 99-18 - SEE P0-00/GENERAL PLUMBING NOTE 2-CODES
 AND STANDARDS/NOTE 16 PIPE SPEC
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 22040585 625 N FLAGLER DR # 400
 1ST REVIEW
  
 MEDGAS COMMENTS: DENIED
  
 1.PER WPB FBC 107.2.1, PLEASE NOTE ANY AND ALL
 APPLICABLE STANDARDS FOR THE SYSTEM, INCLUDING THE
 INSTALLATION.
  
 2. PER WPB FBC 107.2.1, PROVIDE MANUFACTURER'S
 SPECIFICATION/INSTALLATION MANUALS FOR THE FOLLOWING:
 ***A) E8-CO2 INCLUDING BUT NOT LIMITED TO CHANGE OVER
 MANIFOLD, ALARM, HEADERS, REGULATORS, BALL VALVES,
 CHECK VALVES, FLEXIBLE CYLINDER CONNECTORS
 ***B) E9-CO2 INCUBATOR
 ***C) POU REGULATOR FOR E9 CO2 INCUBATOR
  
 3. P0-00/GENERAL PLUMBING NOTE 2: CALLS FOR TYPE L
 COPPER TUBING CLEANED AND PURGED FOR OXYGEN SERVICE
 (ASTM B819 ACR/OXY), NITROGEN PURGED AND SILVER BRAZED
 IN ACCORDANCE WITH NFPA 99. PER WPB FBC 107.2.1,
 PROVIDE SPECIFICATION FOR FITTINGS AND VALVES IN THE
 SYSTEM AND INSTALLATION PROCEDURES.
  
 4.PER WPB FBC 107.2.1, REQUIRE DOCUMENTATION ON ALL
 PIPE, VALVES AND FITTINGS PER NFPA 99-18 SECTION
 5.1.10.1.2 AND 5.1.10.1.4. DOCUMENTATION SHALL BE ON
 SITE FOR INSPECTION.
  
 5. PER WPB FBC 107.2.1, REQUIRE BRAZING TECHNICIANS TO
 BE QUALIFIED AND CERTIFIED IN ACCORDANCE WITH NFPA
 99-18 SECTION 5.1.10.11.11.1. DOCUMENTATION SHALL BE ON
 SITE FOR INSPECTION.
  
 6. PER WPB FBC 107.2.1, PROVIDE STANDARD FOR AND
 PROVIDE VALVE ID/SYSTEM IDENTIFICATION/COLOR CODING
 SPECIFICATION.
  
 7.PER WPB FBC 107.2.1, PROVIDE WALL SUPPORT
 STRUCTURE(S) FOR THE VERTICAL PIPING.
  
  
 END OF COMMENTS.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER PX928
 PLUMBING INSPECTOR BN2148
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  

Review Stop P PLUMBING
Rev No 4 Status P Date 2022-07-05 Cont ID  
Sent By rwbrown Date 2022-07-05 Time 11:07 Rev Time 0.00
Received By rwbrown Date 2022-07-05 Time 11:06 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2022-06-30 Cont ID  
Sent By jesmith Date 2022-06-30 Time 08:49 Rev Time 0.00
Received By jesmith Date 2022-06-30 Time 07:56 Sent To  
Notes
2022-06-30 08:42:0622040585 625 N FLAGLER DR # 400
  
 PLUMBING COMMENTS: DENIED
  
 SEE SIGNATURES
  
 PLEASE NOTE THAT THE PLANS AND SUPPORTING DOCUMENTS ARE
 NOW COMPLIANT AND REQUIRE NO FURTHER ATTENTION
  
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER PX928
 PLUMBING INSPECTOR BN2148
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2022-06-09 Cont ID  
Sent By jesmith Date 2022-06-09 Time 13:33 Rev Time 0.00
Received By jesmith Date 2022-06-07 Time 16:13 Sent To  
Notes
2022-06-09 13:31:11CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 22040585 625 N FLAGLER DR # 400
  
 2ND REVIEW
  
 PLUMBING COMMENTS: DENIED
  
 A REVIEW OF MINIMUM PLUMBING FIXTURE REQUIREMENTS AS
 REQUIRED BY FBC ACC IS PART OF THE PLUMBING REVIEW
 PROCESS BUT IS TYPICALLY ADDRESSED ON THE ARCHITECTURAL
 PLANS. ANY COMMENTS CONCERNING THESE REQUIREMENTS MUST
 BE SATISFACTORILY ADDRESSED PRIOR TO A PLUMBING REVIEW
 APPROVAL.
  
 1. PLEASE NOTE, THE LAST CLOSED PERMIT FOR THE ADDRESS
 IS MASTER 17120950 WITH A REVISION PERMIT 18090893.
 THERE ARE TWO THINGS TO NOTE.
  
 ***A) THE FIRST IS THAT THE ACCESSIBLE WATER CLOSETS ON
 THE NEW DRAWINGS ARE REPOSITIONED (90 DEGREES) FROM
 THOSE ON THE CLOSED PERMIT AND ARE LOCATED ADJACENT TO
 THE WET WALL SEPARATING THE TWO BATHROOMS. WE ARE
 REQUIRED TO LOOK AT THE WORK IN THE HANDICAPPED STALLS
 AS NEW WORK.
 PER WPB FBC 107.2.1, PROVIDE PLAN ELEVATION DETAILS OF
 THE STALLS SHOWING THE FOLLOWING:
 ****11A) MIRRORS LOCATED ABOVE LAVATORIES OR
 COUNTERTOPS SHALL BE INSTALLED WITH THE BOTTOM EDGE OF
 THE REFLECTING SURFACE40 INCHES (1015 MM) MAXIMUM ABOVE
 THE FINISH FLOOR OR GROUND. MIRRORS NOT LOCATED ABOVE
 LAVATORIES OR COUNTERTOPS SHALL BE INSTALLED WITH THE
 BOTTOM EDGE OF THE REFLECTING SURFACE 35 INCHES (890
 MM) MAXIMUM ABOVE THE FINISH FLOOR OR GROUND PER FBC
 ACC 603.3.
 SECOND REQUEST-TO BE CLEAR, PLEASE CLARIFY ON PLANS
 THAT DIMENSION IS TO THE REFLECTING SURFACE OF THE
 MIRROR.
  
 ***B) THE SECOND THING TO NOTE IS THE "EXISTING"
 SANITARY PIPING ON THE NEW DRAWINGS IS CONFIGURED
 DIFFERENTLY FROM THE CLOSED PERMIT PLANS TO ACCOMMODATE
 THE ACCESSIBLE WATER CLOSETS. WE ARE REQUIRED TO LOOK
 AT THE SANITARY PIPING FROM THE MOST UPSTREAM WATER
 CLOSET TO THE MOST DOWNSTREAM WATER CLOSET AS NEW.
 PLEASE SEE THE FOLLOWING:
 ****1B) SECOND REQUEST: NO RESPONSE- P3-00 SANITARY
 RISER: PROVIDE A 2 INCH DRY VERTICAL CIRCUIT VENT
 CONNECTED TO THE HORIZONTAL BRANCH BETWEEN THE TWO
 UPSTREAM WATER CLOSETS TO COMPLY WITH FBC PL 914.2
  
  
 2. SECOND REQUEST: NO RESPONSE-PLEASE NOTE WHERE SINKS
 ARE PROVIDED, AT LEAST 5 PERCENT, BUT NO FEWER THAN
 ONE, OF EACH TYPE PROVIDED IN EACH ACCESSIBLE ROOM OR
 SPACE SHALL COMPLY WITH 606 PER FBC ACC 212.3.
 ***A) PER WPB FBC 107.2.1, PROVIDE ELEVATION FOR SINKS
 S-2, S-3 AND S-4 SHOWING COMPLIANCE WITH FBC ACC 606.3,
 306.2 AND 306.3.
 ***B) PER WPB FBC 107.2.1, SHOW CLEAR FLOOR SPACES FOR
 SINKS S-2, S-3 AND S-4 COMPLYING WITH FBC ACC SECTION
 305.
  
  
 3. COMPLIED
  
  
 4. PARTIALLY COMPLIED: PER WPB FBC 107.2.1, PROVIDE
 MANUFACTURER'S SPECIFICATION/INSTALLATION MANUALS FOR
 WATER HEATER, RECIRC PUMP. RESPONSE: PROVIDE DEFERRED
 SUBMITTALS
  
  
 5. PARTIALLY COMPLIED: PER WPB FBC 107.2.1, PROVIDE
 MANUFACTURER'S SPECIFICATION/INSTALLATION MANUALS FOR
 OWNER SUPPLIED EQUIPMENT. RESPONSE: PROVIDE DEFERRED
 SUBMITTALS
  
  
 6. COMPLIED
  
  
 7. PARTIALLY COMPLIED: P0-00/PLUMBING CONSTRUCTION
 NOTES:
 ***D) SECOND REQUEST: RE: SECTION 22000. PER WPB FBC
 107.2.1, PROVIDE SECTION 22000 BY UPLOADING TO PROJECT
 DOCS/SUPPORTING DOCUMENTS ON THE NEXT SUBMITTAL.
 COULD NOT FIND IN PROJECT DOCS. PLEASE RESUBMIT
 ***E) RE: SECOND REQUEST: SECTION 27000. PER WPB FBC
 107.2.1, PROVIDE SECTION 27000 BY UPLOADING TO PROJECT
 DOCS/SUPPORTING DOCUMENTS ON THE NEXT SUBMITTAL.
 COULD NOT FIND IN PROJECT DOCS. PLEASE RESUBMIT
  
  
 COMMENTS 8 THROUGH 15. COMPLIED
  
  
 16. PARTIALLY COMPLIED: P5-00/JS-1/TMV/EYEWASH-DRENCH
 HOSE: PER WPB FBC 107.2.1, PROVIDE THE FOLLOWING;
 ***D) PROVIDE MANUFACTURER'S SPECIFICATION/INSTALLATION
 MANUAL FOR TMV AND EYEWASH/DRENCH HOSE. RESPONSE:
 PROVIDE DEFERRED SUBMITTALS
  
  
 17. PARTIALLY COMPLIED: P5-00/SS-1/TMV/RECESSED
 EYEWASH-DRENCH: PER WPB FBC 107.2.1, PROVIDE THE
 FOLLOWING;
 ***D) PROVIDE MANUFACTURER'S SPECIFICATION/INSTALLATION
 MANUAL FOR TMV AND RECESSED EYEWASH/DRENCH. RESPONSE:
 PROVIDE DEFERRED SUBMITTALS
  
  
 19.PARTIALLY COMPLIED: RATED WALL PENETRATIONS HAVE
 BEEN PROVIDED. PER WPB FBC 107.2.1, PROVIDE APPLICABLE
 RATED FLOOR DETAILS FOR PLUMBING FLOOR PENETRATIONS
 COMPLYING WITH THE REQUIREMENTS OF FBC CHAPTER 7.
  
  
 NEW COMMENT:
 1A. PER WPB FBC 107.2.1 AND WPB FBC 107.3.4.1, PROVIDE
 AS DEFERRED SUBMITTALS, MANUFACTURER?S
 SPECIFICATION/INSTALLATION MANUAL FOR THE PLUMBING
 FIXTURES, KITCHEN EQUIPMENT AND BACKFLOW PREVENTERS AS
 INDICATED ON PLAN SHEET P0.1. SUBMITTAL SHALL BE
 SUBMITTED, APPROVED AND ON SITE PRIOR TO FINAL
 INSPECTION. PROCEED AT YOUR OWN RISK.
 1B. PER WPB FBC 107.2.1 AND WPB FBC 107.3.4.1, PROVIDE
 ON THE PLANS A LIST OF DEFERRED SUBMITTALS TO INCLUDE
 THE FOLLOWING:
 WATER HEATER
 RECIRCULATING PUMP
 OWNER SUPPLIED EQUIPMENT
 THERMAL MIXING VALVES
 EYEWASH/DRENCH HOSE
 RECESSED EYEWASH/DRENCH
 BACKFLOW PREVENTER(S)
  
  
 END OF COMMENTS.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER PX928
 PLUMBING INSPECTOR BN2148
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2022-05-12 Cont ID  
Sent By jesmith Date 2022-05-12 Time 15:37 Rev Time 0.00
Received By jesmith Date 2022-05-05 Time 11:37 Sent To  
Notes
2022-05-12 15:02:39CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 22040585 625 N FLAGLER DR # 400
  
 1ST REVIEW
 PLUMBING COMMENTS: DENIED
  
 A REVIEW OF MINIMUM PLUMBING FIXTURE REQUIREMENTS AS
 REQUIRED BY FBC ACC IS PART OF THE PLUMBING REVIEW
 PROCESS BUT IS TYPICALLY ADDRESSED ON THE ARCHITECTURAL
 PLANS. ANY COMMENTS CONCERNING THESE REQUIREMENTS MUST
 BE SATISFACTORILY ADDRESSED PRIOR TO A PLUMBING REVIEW
 APPROVAL.
  
 1. PLEASE NOTE, THE LAST CLOSED PERMIT FOR THE ADDRESS
 IS MASTER 17120950 WITH A REVISION PERMIT 18090893.
 THERE ARE TWO THINGS TO NOTE.
  
 ***A) THE FIRST IS THAT THE ACCESSIBLE WATER CLOSETS ON
 THE NEW DRAWINGS ARE REPOSITIONED (90 DEGREES) FROM
 THOSE ON THE CLOSED PERMIT AND ARE LOCATED ADJACENT TO
 THE WET WALL SEPARATING THE TWO BATHROOMS. WE ARE
 REQUIRED TO LOOK AT THE WORK IN THE HANDICAPPED STALLS
 AS NEW WORK.
 PER WPB FBC 107.2.1, PROVIDE PLAN ELEVATION DETAILS OF
 THE STALLS SHOWING THE FOLLOWING:
 ****1A) THE WATER CLOSET SHALL BE POSITIONED WITH A
 WALL OR PARTITION TO THE REAR AND TO ONE SIDE. THE
 CENTERLINE OF THE WATER CLOSET SHALL BE 16 INCHES
 MINIMUM TO 18 INCHES MAXIMUM FROM THE SIDE WALL OR
 PARTITION PER FBC ACC 604.2
 ****2A) CLEARANCE AROUND A WATER CLOSET SHALL BE 60
 INCHES MINIMUM MEASURED PERPENDICULAR FROM THE SIDE
 WALL AND 56 INCHES DEEP MINIMUM FOR WALL HUNG WATER
 CLOSETS AND 59 INCHES DEEP MINIMUM FOR FLOOR MOUNTED
 WATER CLOSETS MEASURED PERPENDICULAR TO THE REAR WALL
 PER FBC ACC 604.3.1 AND 604.8.1.1.
 ****3A) THE SIDE WALL GRAB BAR SHALL BE 42 INCHES LONG
 MINIMUM, LOCATED 12 INCHES (305 MM) MAXIMUM FROM THE
 REAR WALL AND EXTENDING 54 INCHES MINIMUM FROM THE REAR
 WALL PER FBC ACC 604.5.1
 ****4A) THE REAR WALL GRAB BAR SHALL BE 36 INCHES LONG
 MINIMUM AND EXTEND FROM THE CENTERLINE OF THE WATER
 CLOSET 12 INCHES MINIMUM ON ONE SIDE AND 24 INCHES
 MINIMUM ON THE OTHER SIDE PER FBC ACC 604.5.2
 ****5A) FLUSH CONTROLS SHALL BE HAND OPERATED OR
 AUTOMATIC. HAND OPERATED FLUSH CONTROLS SHALL COMPLY
 WITH 309. FLUSH CONTROLS SHALL BE LOCATED ON THE OPEN
 SIDE OF THE WATER CLOSET PER FBC ACC 604.6
 ****6A) PER FBC ACC 604.8, TOILET PAPER DISPENSERS
 SHALL COMPLY WITH 309.4 AND SHALL BE 7 INCHES MINIMUM
 AND 9 INCHES MAXIMUM IN FRONT OF THE WATER CLOSET
 MEASURED TO THE CENTERLINE OF THE DISPENSER. THE OUTLET
 OF THE DISPENSER SHALL BE 15 INCHES MINIMUM AND 48
 INCHES MAXIMUM ABOVE THE FINISH FLOOR AND SHALL NOT BE
 LOCATED BEHIND GRAB BARS.
 ****7A) THE SEAT HEIGHT OF A WATER CLOSET ABOVE THE
 FINISH FLOOR SHALL BE 17 INCHES (430 MM) MINIMUM AND 19
 INCHES (485 MM) MAXIMUM MEASURED TO THE TOP OF THE
 SEAT. SEATS SHALL NOT BE SPRUNG TO RETURN TO A LIFTED
 POSITION PER FBC ACC 604.4.
 ****8A) PER FBC ACC 609.4, GRAB BARS SHALL BE INSTALLED
 IN A HORIZONTAL POSITION, 33 INCHES MINIMUM AND 36
 INCHES MAXIMUM ABOVE THE FINISH FLOOR MEASURED TO THE
 TOP (NOT THE CENTER) OF THE GRIPPING SURFACE.
 ****9A) LAVATORIES AND SINKS SHALL BE INSTALLED WITH
 THE FRONT OF THE HIGHER OF THE RIM OR COUNTER SURFACE
 34 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND PER
 FBC ACC 606.3, ADDITIONALLY SHOW TOE AND KNEE CLEARANCE
 AS REQUIRED BY FBC ACC 306.2 AND 306.3
 ****10A) PER FBC 606.5 EXPOSED PIPES AND SURFACES.
 WATER SUPPLY & DRAINPIPES UNDER LAVATORIES AND SINKS
 SHALL BE INSULATED OR OTHERWISE CONFIGURED TO PROTECT
 AGAINST CONTACT.
 ****11A) MIRRORS LOCATED ABOVE LAVATORIES OR
 COUNTERTOPS SHALL BE INSTALLED WITH THE BOTTOM EDGE OF
 THE REFLECTING SURFACE40 INCHES (1015 MM) MAXIMUM ABOVE
 THE FINISH FLOOR OR GROUND. MIRRORS NOT LOCATED ABOVE
 LAVATORIES OR COUNTERTOPS SHALL BE INSTALLED WITH THE
 BOTTOM EDGE OF THE REFLECTING SURFACE 35 INCHES (890
 MM) MAXIMUM ABOVE THE FINISH FLOOR OR GROUND PER FBC
 ACC 603.3.
 TO BE CLEAR, PLEASE CLARIFY ON PLANS THAT DIMENSION IS
 TO THE REFLECTING SURFACE OF THE MIRROR.
 ****12A) SHOW TURNING SPACE COMPLYING WITH FBC ACC
 304.3.1 OR 304.3.2.
 ****13A) SHOW CLEAR FLOOR SPACES FOR LAVATORIES. THE
 CLEAR FLOOR OR GROUND SPACE SHALL BE 30 INCHES (760 MM)
 MINIMUM BY 48 INCHES (1220 MM) MINIMUM AND COMPLY WITH
 FBC ACC SECTION 305.
  
 ***B) THE SECOND THING TO NOTE IS THE "EXISTING"
 SANITARY PIPING ON THE NEW DRAWINGS IS CONFIGURED
 DIFFERENTLY FROM THE CLOSED PERMIT PLANS TO ACCOMMODATE
 THE ACCESSIBLE WATER CLOSETS. WE ARE REQUIRED TO LOOK
 AT THE SANITARY PIPING FROM THE MOST UPSTREAM WATER
 CLOSET TO THE MOST DOWNSTREAM WATER CLOSET AS NEW.
 PLEASE SEE THE FOLLOWING:
 ****1B) P3-00 SANITARY RISER: PROVIDE A 2 INCH DRY
 VERTICAL CIRCUIT VENT CONNECTED TO THE HORIZONTAL
 BRANCH BETWEEN THE TWO UPSTREAM WATER CLOSETS TO COMPLY
 WITH FBC PL 914.2
  
  
 2. PLEASE NOTE WHERE SINKS ARE PROVIDED, AT LEAST 5
 PERCENT, BUT NO FEWER THAN ONE, OF EACH TYPE PROVIDED
 IN EACH ACCESSIBLE ROOM OR SPACE SHALL COMPLY WITH 606
 PER FBC ACC 212.3.
 ***A) PER WPB FBC 107.2.1, PROVIDE ELEVATION FOR SINKS
 S-2, S-3 AND S-4 SHOWING COMPLIANCE WITH FBC ACC 606.3,
 306.2 AND 306.3.
 ***B) PER WPB FBC 107.2.1, SHOW CLEAR FLOOR SPACES FOR
 SINKS S-2, S-3 AND S-4 COMPLYING WITH FBC ACC SECTION
 305.
  
  
 3. PER WPB FBC 107.2.1, PLEASE PROVIDE NOTE STATING THE
 URINALS, DRINKING FOUNTAIN AND COUNTERTOP LAVATORIES
 ARE EXISTING AND ARE NOT INCLUDED IN THE SCOPE OF WORK.
  
  
 4. PER WPB FBC 107.2.1, PROVIDE MANUFACTURER'S
 SPECIFICATION/INSTALLATION MANUALS FOR WATER HEATER,
 RECIRC PUMP.
  
  
 5. PER WPB FBC 107.2.1, PROVIDE MANUFACTURER'S
 SPECIFICATION/INSTALLATION MANUALS FOR OWNER SUPPLIED
 EQUIPMENT.
  
  
 6. PER 107.2.1, SPECIFY AND PROVIDE DETAIL LEAD FREE
 RPZ, AIR GAP FITTING AND LEAD FREE STRAINER FOR MAKEUP
 WATER FOR THE CHILLED WATER PIPING. PLEASE NOTE
 MANUFACTURER'S RECOMMENDATIONS (I.E. WATTS DOCUMENT
 RP/IS-009 RECOMMENDING A STRAINER BE INSTALLED AHEAD OF
 THE DEVICE) AND FBC PL 301.7; CONFLICTS: IN INSTANCES
 WHERE CONFLICTS OCCUR BETWEEN THIS CODE AND THE
 MANUFACTURER'S INSTALLATION INSTRUCTIONS, THE MORE
 RESTRICTIVE PROVISIONS SHALL APPLY.
  
  
 7. P0-00/PLUMBING CONSTRUCTION NOTES:
 ***A) PER WPB FBC 107.2.1, NOTE 3 SHALL BE REVISED TO
 REFLECT THE FLORIDA PLUMBING CODE 2020.
 ***B) PER WPB FBC 107.2.1, NOTE 11 SHALL BE REVISED TO
 REQUIRE A STRAINER (FBC PL 604.8) AHEAD OF THE PRESSURE
 REGULATOR.
 ***C) PER WPB FBC 107.2.1, ADD TO NOTE 15; WATER-HAMMER
 ARRESTORS SHALL CONFORM TO ASSE 1010 PER 604.9 OF THE
 FLORIDA PLUMBING CODE 2020.
 ***D) RE: SECTION 22000. PER WPB FBC 107.2.1, PROVIDE
 SECTION 22000 BY UPLOADING TO PROJECT DOCS/SUPPORTING
 DOCUMENTS ON THE NEXT SUBMITTAL.
 ***E) RE: SECTION 27000. PER WPB FBC 107.2.1, PROVIDE
 SECTION 27000 BY UPLOADING TO PROJECT DOCS/SUPPORTING
 DOCUMENTS ON THE NEXT SUBMITTAL.
 ***F) NOTE 40 SHALL BE REVISED TO REFLECT THE FLORIDA
 PLUMBING CODE 2020.
  
  
 8.PER WPB FBC 107.2.1, PROVIDE PIPING MATERIAL SPEC FOR
 A/C CONDENSATE PIPING.
  
  
 9.ALL COMPONENTS IN THE DOMESTIC WATER SYSTEM SHALL BE
 LEAD FREE IN ACCORDANCE WITH FBC PL 605.2 AND 605.2.1.
 PER WPB FBC 107.2.1, PROVIDE NOTE ON PLANS STATING THE
 SAME.
  
  
 10.PER WPB FBC 107.2.1, PROVIDE NOTE AT PIPE HANGER
 DETAIL STATING 'PER FBC PL 301.7 CONFLICTS: IN
 INSTANCES WHERE CONFLICTS OCCUR BETWEEN FBC PL TABLE
 308.5 AND THIS DETAIL, THE MORE RESTRICTIVE PROVISIONS
 SHALL APPLY.'
  
  
 11.P4-02/DISHWASHER CONNECTION: PER FBC PL 606.2, A
 SHUT-OFF VALVE SHALL BE INSTALLED ON THE SUPPLY LINE TO
 EACH FIXTURE AND APPLIANCE. PER WPB FBC 107.2.1,
 PROVIDE INDIVIDUAL SHUT OFF ON THE HOT WATER SUPPLY TO
 THE SINK AND TO THE DISHWASHER.
  
  
 12.SPECIFY, PROVIDE DETAIL AND LOCATION FOR A BACKWATER
 VALVE IN THE 3 INCH CONDENSATE DRAIN DISCHARGING FROM
 FS-1 TO THE RAINWATER LEADER. SEE FBC PL 714 AND
 1101.9.
  
  
 13. THE SCHEDULED FS-1 IS FURNISHED TO RECEIVE
 CONDENSATE AND CONVEY IT TO A RAINWATER LEADER. YOU
 HAVE SPECIFIED A TRAP PRIMER CONNECTION WHICH INDICATES
 A TRAP WHICH IS NOT REQUIRED AS IT IS NOT SUBJECT TO
 SEWER GAS AND THERE IS NO DIRECT CONNECTION TO AIR
 HANDLING EQUIPMENT. IT IS QUESTIONABLE THAT THERE IS
 ADEQUATE VENT TO ALLOW A TRAP TO FUNCTION PROPERLY. PER
 WPB FBC 107.2.1, PROVIDE A DETAIL FOR FS-1 ELIMINATING
 A TRAP AND TRAP PRIMER; DELETE TRAP PRIMER CONNECTION
 FROM THE SCHEDULE.
  
  
 14.P5-00/WATER HAMMER ARRESTOR SCHEDULE: PER WPB FBC
 107.2.1, ADD NOTE STATING "WATER-HAMMER ARRESTORS SHALL
 CONFORM TO ASSE 1010 PER 604.9 OF THE FLORIDA PLUMBING
 CODE 2020."
  
  
 15.P4-01/WATER HEATER DETAIL:
 ***A) PER WPB FBC 107.2.1, PLEASE SPECIFY THE
 TEMPERATURE OF THE HOT WATER OUT OF THE TANK. PLEASE
 NOTE THAT THIS TEMPERATURE IS SPECIFIC TO THE DESIRED
 TEPID WATER TEMPERATURE FOR THE TMVS AT THE
 EYEWASH/DRENCH UNITS. SEE GUARDIAN TMV
 SPEC/INSTALLATION SHEETS.
  
  
 16.P5-00/JS-1/TMV/EYEWASH-DRENCH HOSE: PER WPB FBC
 107.2.1, PROVIDE THE FOLLOWING;
 ***A) PER FBC PL 411.3, THE TEMPERATURE OF THE WATER
 SUPPLY SHALL ONLY BE CONTROLLED BY A TEMPERATURE
 ACTUATED MIXING VALVE COMPLYING WITH ASSE 1071.
 SCHEDULE NOTES ANSI 1071. PLEASE CLARIFY.
 ***B) SPECIFY THE MAXIMUM TEMPERATURE SETTING OF THE
 TMV.
 ***C) PLEASE PROVIDE A SCHEMATIC DETAIL OF
 EYEWASH/DRENCH HOSE PIPING. TMV SHALL BE ACCESSIBLE IN
 PER FBC PL SECTION 606.
 ***D) PROVIDE MANUFACTURER'S SPECIFICATION/INSTALLATION
 MANUAL FOR TMV AND EYEWASH/DRENCH HOSE.
 ***E) PROVIDE NOTE REQUIRING DOCUMENTATION OF WATER
 TEMPERATURE AT THE DEVICE TO BE ON SITE FOE FINAL
 INSPECTION
  
  
 17. P5-00/SS-1/TMV/RECESSED EYEWASH-DRENCH: PER WPB FBC
 107.2.1, PROVIDE THE FOLLOWING;
 ***A) PER FBC PL 411.3, THE TEMPERATURE OF THE WATER
 SUPPLY SHALL ONLY BE CONTROLLED BY A TEMPERATURE
 ACTUATED MIXING VALVE COMPLYING WITH ASSE 1071.
 SCHEDULE NOTES ANSI 1071. PLEASE CLARIFY.
 ***B) SPECIFY THE MAXIMUM TEMPERATURE SETTING OF THE
 TMV.
 ***C) PLEASE PROVIDE A SCHEMATIC DETAIL OF TMV AND
 RECESSED EYEWASH/DRENCH PIPING. TMV SHALL BE ACCESSIBLE
 IN PER FBC PL SECTION 606.
 ***D) PROVIDE MANUFACTURER'S SPECIFICATION/INSTALLATION
 MANUAL FOR TMV AND RECESSED EYEWASH/DRENCH.
 ***E) PROVIDE NOTE REQUIRING DOCUMENTATION OF WATER
 TEMPERATURE AT THE DEVICE TO BE ON SITE FOR FINAL
 INSPECTION
  
  
 18. P4-02/STANDARD MOP SINK DETAIL: PER WPB FBC
 107.2.1, PROVIDE THE FOLLOWING;
 ***A) PLEASE SPECIFY AND PROVIDE MANUFACTURER'S
 SPECIFICATION/INSTALLATION MANUAL FOR THE HOSE AND
 BRACKET.
 ***B) PLEASE PROVIDE A SCHEMATIC DETAIL OF THE PIPING
 SHOWING CONTROL (SHUT-OFF) VALVE(S) AND BACKFLOW
 PREVENTION DEVICE.
 ***C) SPECIFY THE BACKFLOW PREVENTER DEVICE. NOTE THE
 VACUUM BREAKER ON THE EXISTING DETAIL. ATMOSPHERIC
 VACUUM BREAKERS ARE ONLY PERMITTED DOWNSTREAM OF THE
 CONTROL VALVE.
 ***D) SHOW PIPING TO THE HOSE ON THE WATER DISTRIBUTION
 PLAN VIEW AND RISER DIAGRAM.
 ***E) ADD TO P5-00/JS-1 SCHEDULE
  
  
 19.PER WPB FBC 107.2.1, PROVIDE APPLICABLE RATED
 WALL/FLOOR DETAILS FOR PLUMBING PENETRATIONS COMPLYING
 WITH THE REQUIREMENTS OF FBC CHAPTER 7.
  
  
 END OF COMMENTS.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER PX928
 PLUMBING INSPECTOR BN2148
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2022-07-05 Cont ID  
Sent By rwbrown Date 2022-07-05 Time 11:06 Rev Time 0.00
Received By rwbrown Date 2022-07-05 Time 11:06 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2022-06-28 Cont ID  
Sent By mpeterso Date 2022-06-28 Time 15:05 Rev Time 0.00
Received By mpeterso Date 2022-06-28 Time 15:05 Sent To  
Notes
2022-06-30 09:32:38SIGNATURE REVIEW FOR PLUMBING PLANS: FAILED
 SECOND REQUEST: PLUMBING SHEETS P2-02, P2-03, P2-06 AND
 P2-07 ARE MISSING DIGITAL SIGNATURE. CORRECTIONS ARE
 REQUIRED. JS
  
  
2022-06-28 15:07:29SIGNATURE REVIEW FAILED
 3RD REVIEW
 IT APPEARS THERE HAS BEEN NO RESUBMITTALS TO CORRECT
 THE SIGNATURE ISSUES STATED BELOW
 SIGNATURE REVIEW FAILED
 1) SHEETS NUMBERED 2,23-26,31,32,35,36,45,48-50,
 53,54,57-60 DO NOT HAVE THE REQUIRED DIGITAL
 SIGNATURES. PLEASE CORRECT THESE ISSUES AS DESCRIBED
 BELOW.
  
 FS471/FS481 DOCUMENTS PREPARED BY ARCHITECT/ENGINEER OF
 RECORD AND SUBMITTED FOR PUBLIC RECORD ARE TO BE
 DIGITALLY SEALED AND SIGNED.
 PLEASE SUBMIT DIGITALLY SEALED AND SIGNED PLANS
 FOLLOWING PROJECTDOX INSTRUCTIONS
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-06-06 Cont ID  
Sent By mpeterso Date 2022-06-06 Time 11:50 Rev Time 0.00
Received By mpeterso Date 2022-06-06 Time 11:50 Sent To  
Notes
2022-06-09 15:36:18PLUMBING SHEETS P2-02, P2-03, P2-06 AND P2-07 ARE
 MISSING DIGITAL SIGNATURE. CORRECTIONS ARE REQUIRED. JS
2022-06-06 11:55:48SIGNATURE REVIEW FAILED
 1) SHEETS NUMBERED 2,23-26,31,32,35,36,45,48-50,
 53,54,57-60 DO NOT HAVE THE REQUIRED DIGITAL
 SIGNATURES. PLEASE CORRECT THESE ISSUES AS DESCRIBED
 BELOW.
  
  
 FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR
 ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE
 SIGNED, SEALED, DATED ORIGINALS OR DIGITALLY SEALED AND
 SIGNED.
  
 UPLOAD A DIGITALLY OR ELECTRONICALLY SIGNED PLAN TO THE
 SIGNATURE FOLDER WITH YOUR RESUBMITTAL (IF APPLICABLE)
 AND COMPLETE THE UPLOAD TASK IN PROJECTDOX. SIGNATURE
 DOCUMENTS ARE TYPICALLY REVIEWED WITHIN TWO BUSINESS
 DAYS AFTER SUBMITTAL; DIGITALLY SIGNED DOCUMENTS ARE
 PREFERRED.
  
 PLEASE EMAIL [email protected] AND CC TO
 [email protected]
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-05-25 Cont ID  
Sent By mpeterso Date 2022-05-25 Time 11:38 Rev Time 0.00
Received By mpeterso Date 2022-05-25 Time 11:38 Sent To  
Notes
2022-05-25 11:39:43ALL DRAWINGS PASSED SIGNATURE REVIEW. MP
2022-05-18 14:28:08ARCHITECTURAL SHEETS SIGNATURE OK. JW 5/18/22
2022-05-05 13:34:08SIGNATURES FOR PLUMBING/GAS ARE VALID. JS