Plan Review Stops For Permit 22031603
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-07-05 Cont ID  
Sent By rmcphers Date 2022-07-05 Time 12:53 Rev Time 0.00
Received By rmcphers Date 2022-07-05 Time 12:53 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-05-25 Cont ID  
Sent By rmcphers Date 2022-05-25 Time 13:40 Rev Time 0.00
Received By rmcphers Date 2022-05-25 Time 13:24 Sent To  
Notes
2022-05-25 13:40:01POOL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE SHOW THE REQUIRED LADDER OR STEPS PER FBC
 R4501.18 LADDERS AND STEPS.
 ALL POOLS WHETHER PUBLIC OR PRIVATE SHALL BE PROVIDED
 WITH A LADDER OR STEPS IN THE SHALLOW END WHERE WATER
 DEPTH EXCEEDS 24 INCHES (610 MM).

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-04-26 Cont ID  
Sent By ppetty Date 2022-04-26 Time 08:53 Rev Time 0.00
Received By ppetty Date 2022-04-26 Time 08:42 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2022-04-05 Cont ID  
Sent By lcrespo Date 2022-04-05 Time 10:49 Rev Time 0.00
Received By lcrespo Date 2022-04-05 Time 10:49 Sent To  
Notes
2022-04-05 10:49:31GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT
 BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND
 PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENT TO THE FBC
 SEC. 105.1.
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-04-13 Cont ID  
Sent By amhamilt Date 2022-04-13 Time 16:15 Rev Time 0.00
Received By amhamilt Date 2022-04-13 Time 16:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-07-05 Cont ID  
Sent By rmcphers Date 2022-07-05 Time 12:53 Rev Time 0.00
Received By rmcphers Date 2022-06-25 Time 07:35 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-05-25 Cont ID  
Sent By rmcphers Date 2022-05-25 Time 13:40 Rev Time 0.00
Received By rmcphers Date 2022-04-04 Time 08:29 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-04-05 Cont ID  
Sent By lcrespo Date 2022-04-05 Time 10:48 Rev Time 0.00
Received By lcrespo Date 2022-04-05 Time 10:48 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-07-05 Cont ID  
Sent By rmcphers Date 2022-07-05 Time 12:53 Rev Time 0.00
Received By rmcphers Date 2022-07-05 Time 12:53 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-04-26 Cont ID  
Sent By ppetty Date 2022-04-26 Time 08:54 Rev Time 0.00
Received By ppetty Date 2022-04-26 Time 08:54 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-04-08 Cont ID  
Sent By asangele Date 2022-04-08 Time 12:36 Rev Time 0.00
Received By asangele Date 2022-04-08 Time 12:36 Sent To  
Notes
***NONE***