Plan Review Details - Permit 22031011
Plan Review Stops For Permit 22031011
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2022-04-04 Cont ID  
Sent By pvalenti Date 2022-04-04 Time 16:15 Rev Time 0.00
Received By pvalenti Date 2022-03-31 Time 07:55 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-04-19 Cont ID  
Sent By pvalenti Date 2022-04-19 Time 16:47 Rev Time 0.00
Received By pvalenti Date 2022-04-19 Time 16:47 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-04-04 Cont ID  
Sent By pvalenti Date 2022-04-04 Time 16:18 Rev Time 0.00
Received By pvalenti Date 2022-03-31 Time 07:55 Sent To  
Notes
2022-04-04 16:24:18PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 3. WATERDOWN METHOD:
  
 IF A WATER TRUCK IS DESIRED (MAY BE BEST OPTION),
 PROVIDE DETAILED INFPRMATION OF THE WATER TRUCK SUCH
 AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
  
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY?S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
 4. SEWER LATERAL CAPPING PERMIT# 22030982 FINAL
 PLUMBING INSPECTION #703 IS REQUIRED.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-04-04 Cont ID  
Sent By RROSSANO Date 2022-04-04 Time   Rev Time  
Received By rrossano Date 2022-04-04 Time   Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-04-12 Cont ID  
Sent By amhamilt Date 2022-04-12 Time 15:29 Rev Time 0.00
Received By amhamilt Date 2022-04-12 Time 15:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status P Date 2022-04-19 Cont ID  
Sent By pvalenti Date 2022-04-19 Time 16:48 Rev Time 0.00
Received By pvalenti Date 2022-04-14 Time 08:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-04-13 Cont ID  
Sent By aoliver Date 2022-04-13 Time 08:10 Rev Time 0.00
Received By aoliver Date 2022-03-30 Time 12:58 Sent To  
Notes
***NONE***

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 2 Status N Date 2022-04-15 Cont ID  
Sent By shill Date 2022-04-15 Time 07:09 Rev Time 0.00
Received By shill Date 2022-04-15 Time 07:09 Sent To  
Notes
2022-04-15 07:10:23NEW NOTICE TO BUILDING OFFICIAL RECEIVED CLARIFYING
 THAT DEMO PERMIT IS NOT IN PRIVATE PROVIDER'S SCOPE
  

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 1 Status F Date 2022-04-11 Cont ID  
Sent By shill Date 2022-04-11 Time 08:53 Rev Time 0.00
Received By shill Date 2022-04-11 Time 08:53 Sent To  
Notes
2022-04-11 08:56:42FS553.791, NOTICE TO BUILDING OFFICIAL OF USE OF
 PRIVATE PROVIDER WAS RECEIVED
  
 SINCE THE PROJECT NAME STATES ONLY ?BANYAN VIEW? (SEE
 BELOW), WE ASSUME THAT THE PRIVATE PROVIDER WILL
 INSPECT EVERYTHING THAT HAS FBC COMPLIANCE
 REQUIREMENTS. IF ANY ITEMS ARE NOT WITHIN THE SCOPE OF
 THE PRIVATE PROVIDER, PROVIDE A NEW NOTICE TO BUILDING
 OFFICIAL CLARIFYING ITEMS NOT WITHIN THEIR SCOPE.
  
 CURRENTLY IN APPLICATION - DEMO 22031011, TEMP
 CONSTRUCTION FENCE/BARRIER 22021151
  
 WHEN RESUBMITTING, IF THIS IS WITHIN THE SCOPE OF THE
 PRIVATE PROVIDER INSPECTIONS, INDICATE WITH A RESPONSE
 LETTER.
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-04-04 Cont ID  
Sent By pvalenti Date 2022-04-04 Time 16:15 Rev Time 0.00
Received By pvalenti Date 2022-04-04 Time 16:15 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-04-12 Cont ID  
Sent By amhamilt Date 2022-04-12 Time 15:30 Rev Time 0.00
Received By amhamilt Date 2022-04-12 Time 15:30 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved