| 2023-04-06 11:54:29 | ** FAILED ** |
| | |
| | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE |
| | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE |
| | APPLICABLE: |
| | |
| | 1.) THERE IS CONFUSION WITH THE INFORMATION PROVIDED IN |
| | THE COMPLETED BUILDING PERMIT APPLICATION FORM. THE |
| | SCOPE OF WORK SPECIFIES "INSTALL MONUMENT SIGN @ |
| | ELECTRICAL CHANGING STATION WITH SOLAR CANOPY," |
| | HOWEVER, THE PLANS AND DESCRIPTION (I.E. INFORMATION |
| | IMPLIES THAT THIS IS A FENCE PERMIT) DO NOT MATCH. |
| | PLEASE REVISE AND ADDRESS FOR CONSISTENCY. |
| | |
| | 2.) CLEARLY SHOW IN THE SITE PLAN THE ACTUAL LOCATION |
| | OF THE PROPOSED FENCE LINE. PLEASE NOTE THAT THE |
| | PROPOSED FENCE MUST MATCH THE APPROVED SITE PLAN. |
| | |
| | 3.) THE HEIGHT OF THE PROPOSED FENCE DOES NOT MATCH |
| | WHAT HAD BEEN APPROVED BY DMP FSPR 21-02. |
| | |
| | 4.) AS SPECIFIED IN AN EMAIL SENT TO JOSHUA BALDRIDGE, |
| | CONSTRUCTION MANGER AT NEXTERA ENERGY RESOURCES, ON |
| | 5/25/2022, INFORMATION REQUIRED FOR THE FENCE PERMIT |
| | WAS SPECIFIED IN THE EMAIL, INCLUDING (BUILDING PERMIT |
| | PLAN PACKET DOES NOT COMPLY): |
| | |
| | 4.1) DETAIL OF THE PROPOSED FENCE MUST BE PROVIDED IN |
| | THE PLANS AND MUST SPECIFY THAT IT WILL BE VINYL COATED |
| | CLF (IN ADDITION TO PROVIDING THE SPECIFICATIONS FOR |
| | FENCE AND MESH IN THE PERMIT). |
| | |
| | 4.2) THE FENCE HEIGHT (AND ALL RELEVANT INFORMATION) |
| | MUST BE PROVIDED IN THE DETAIL AND MUST ALSO MATCH THE |
| | APPROVED PLANS. |
| | |
| | |
| | |
| | NOTES: |
| | |
| | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. |
| | |
| | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE |
| | QUESTIONS. |
| | |
| | * REFERENCE: DMP FSPR 21-02 (FPL EV FAST CHARGING |
| | STATION). |
| | |
| | * MASTER PERMIT #21110989 (CONSTRUCTION FOR EV CHARGING |
| | STATION). |
| | |