Plan Review Details - Permit 22030612
Plan Review Stops For Permit 22030612
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-07-21 Cont ID  
Sent By dbattles Date 2022-07-21 Time 14:46 Rev Time 0.00
Received By dbattles Date 2022-07-21 Time 14:46 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-06-02 Cont ID  
Sent By dbattles Date 2022-06-02 Time 09:17 Rev Time 0.00
Received By dbattles Date 2022-06-02 Time 09:05 Sent To  
Notes
2022-06-02 16:53:17BUILDING REVIEW COMMENTS:
  
 W.P.B. PERMIT: 22030612
 REVIEWED: JUNE 2, 2022
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER PX4191
 [email protected]
 561-805-6718
  
 FLORIDA BUILDING CODE,7TH EDITION (2020)
 FBC[AMENDED] = 2017 CHAPTER 1 WPB AMENDMENTS (SEE LINK
 BELOW)
 HTTPS://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/
 BUILDING-PERMIT-FORMS
 FBC[EXISTING] = FBC EXISTING BUILDING
  
 1. 107.3.4.1 FBC[AMENDED] PROVIDE PRODUCT APPROVALS FOR
 WINDOWS, DOORS, GARAGE DOOR AND ROOFING OR INDICATE
 THAT YOU WOULD LIKE THEM DEFERRED.
  
 2. PLEASE PROVIDE NOTE OR OTHER INDICATION THAT
 MECHANICAL EQUIPMENT WILL BE AT DFE OF 8' ELEVATION.
  
  
 PLEASE FEEL FREE TO CONTACT ME AT 561-805-6718 (M-F
 8-5) TO DISCUSS COMMENTS, OR E-MAIL ANYTIME
 [email protected]
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-04-11 Cont ID  
Sent By mpeterso Date 2022-04-11 Time 13:54 Rev Time 0.00
Received By mpeterso Date 2022-04-11 Time 13:54 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2022-03-23 Cont ID  
Sent By lcrespo Date 2022-03-23 Time 11:01 Rev Time 0.00
Received By lcrespo Date 2022-03-23 Time 11:01 Sent To  
Notes
2022-03-23 11:10:06GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT
 BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND
 PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENT TO THE FBC
 SEC. 105.1.
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-04-06 Cont ID  
Sent By amhamilt Date 2022-04-06 Time 15:52 Rev Time 0.00
Received By amhamilt Date 2022-04-06 Time 15:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-08-24 Cont ID  
Sent By aoliver Date 2022-08-24 Time 08:13 Rev Time 0.00
Received By aoliver Date 2022-07-05 Time 16:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-06-02 Cont ID  
Sent By dbattles Date 2022-06-02 Time 09:20 Rev Time 0.00
Received By dbattles Date 2022-03-16 Time 10:13 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date   Cont ID  
Sent By   Date 2022-07-29 Time   Rev Time 0.00
Received By lmarchan Date 2022-07-21 Time 16:35 Sent To  
Notes
2022-07-29 14:36:43NO FEES DUE - PAID UNDER 21090661
2022-07-21 16:35:567/21/22 EMAILED IMPACT OFFICE TO REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2022-06-02 Cont ID  
Sent By dbattles Date 2022-06-02 Time 13:23 Rev Time 0.00
Received By dbattles Date 2022-06-02 Time 13:23 Sent To  
Notes
2022-06-02 13:26:11109 FBC[AMENDED] PLANS WILL BE REVIEWED BY THE PBC
 IMPACT FEE OFFICE DIGITALLY VIA PROJECTDOX UPON
 NOTIFICATION BY THIS OFFICE. NOTIFICATION MAY OCCUR
 WHEN PLANS ARE NEAREST FINAL FORM. YOU MAY COORDINATE
 WITH THE IMPACT FEE OFFICE AT (561) 233-5025 OR SIMPLY
 UPLOAD THE MUNICIPAL IMPACT FEE QUESTIONNAIRE FORM TO
 YOUR PROJECT AND NAME THE FILE MUNICIPAL IMPACT FEE
 QUESTIONNAIRE. THE FORM CAN BE FOUND AT: HTTP://DISCOVE
 R.PBCGOV.ORG/PZB/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QU
 ESTIONNAIRE.PDF UPON APPROVAL AND FEE PAYMENT, PLEASE
 UPLOAD THE RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2022-07-11 Cont ID  
Sent By medwards Date 2022-07-11 Time 12:04 Rev Time 0.00
Received By medwards Date 2022-07-11 Time 12:04 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2022-04-01 Cont ID  
Sent By medwards Date 2022-04-01 Time 10:43 Rev Time 0.00
Received By medwards Date 2022-04-01 Time 10:43 Sent To  
Notes
2022-04-01 10:44:32PLEASE SHOW THE RETURN AIR PATH BACK TO THE DUCTED
 MINI-SPLIT, THE RETURN AIR SHALL NOT BE TAKEN FROM A
 BATHROOM. FRC M1602.2-4
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status P Date 2022-06-02 Cont ID  
Sent By dbattles Date 2022-06-02 Time 16:54 Rev Time 0.00
Received By dbattles Date 2022-06-02 Time 16:54 Sent To  
Notes
2022-06-02 16:55:13SEE VARIANCE 22010149

Review Stop P PLUMBING
Rev No 2 Status P Date 2022-07-06 Cont ID  
Sent By rwbrown Date 2022-07-06 Time 12:09 Rev Time 0.00
Received By rwbrown Date 2022-07-06 Time 12:09 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2022-03-23 Cont ID  
Sent By lcrespo Date 2022-03-23 Time 11:02 Rev Time 0.00
Received By lcrespo Date 2022-03-23 Time 11:02 Sent To  
Notes
2022-03-23 11:03:4103/23/22 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. ON SHEET MP-1, THE TOILET AND SHOWER IN THE MASTER
 ARE NOT VENTED CORRECTLY ONLY THE FIXTURES WITHIN THE
 BATHROOM GROUPS SHALL CONNECT TO THE WET-VENTED
 HORIZONTAL BRANCH DRAIN. 2020 FBC SEC. R 3108.1
 HORIZONTAL WET VENT PERMITTED.
  
 2. THESE ARE MULTI-FAMILY DWELLINGS, AND WATER USERS
 WILL BE REQUIRED TO INSTALL A BACKFLOW PREVENTION
 ASSEMBLY AT THE POINT OF DELIVERY. THE TYPE OF BACKFLOW
 ASSEMBLY REQUIRED WILL BE DEPENDENT UPON THE DEGREE OF
 HAZARD POSED BY THE WATER USER. A REDUCED PRESSURE ZONE
 BACKFLOW DEVICE WILL BE REQUIRED AT THE WATER METER PER
 THE CITY OF WEST PALM CROSS UTILITIES DEPARTMENT AND
 THEIR CONNECTION CONTROL PROGRAM.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION,
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 WEST PALM BEACH AMENDMENTS 2017 FBC CHAPTER; UPON
 REQUEST.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-07-21 Cont ID  
Sent By dbattles Date 2022-07-21 Time 14:46 Rev Time 0.00
Received By dbattles Date 2022-07-21 Time 14:46 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-06-02 Cont ID  
Sent By dbattles Date 2022-06-02 Time 09:20 Rev Time 0.00
Received By dbattles Date 2022-06-02 Time 09:20 Sent To  
Notes
2022-06-02 09:27:13OK. ANY DRAWING RE-SUBMITTED WILL NEED SIGNATURE
 REVIEW.

Review Stop Z ZONING
Rev No 2 Status P Date 2022-08-23 Cont ID  
Sent By amhamilt Date 2022-08-23 Time 14:15 Rev Time 0.00
Received By amhamilt Date 2022-08-23 Time 14:15 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-04-06 Cont ID  
Sent By amhamilt Date 2022-04-06 Time 15:53 Rev Time 0.00
Received By amhamilt Date 2022-04-06 Time 15:53 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved