| Plan Review Stops For Permit 22030581 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2022-07-25 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-07-25 |
Time |
12:13 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-07-25 |
Time |
12:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-06-25 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-06-25 |
Time |
11:06 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-06-25 |
Time |
10:53 |
Sent To |
|
|
| Notes |
| 2022-06-25 11:10:29 | PLAN REVIEW BUILDING | | | | | | CHRISTOPHER S. THROOP, C.B.O., CFM | | | PLANS EXAMINER II PX3169/SFP306 | | | BU1635 BN4338 | | | ASFPM CFM US-21-11935 | | | CITY OF WEST PALM BEACH | | | (561) 805-6726 | | | [email protected] | | | | | | CODES IN EFFECT: | | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | | CHAPTER 1 ADMINISTRATION | | | NFPA 70 2017 EDITION NEC 2017 | | | | | | 2ND REVIEW | | | | | | RESULTS: DENIED | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | | | NOTICE: | | | PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED | | | SATISFACTORILY ARE MARKED AS CORRECTED OR REMOVED. | | | PREVIOUS COMMENTS THAT HAVE NOT BEEN ADDRESSED | | | SATISFACTORILY MAY HAVE ADDITIONAL COMMENTS IN | | | PARENTHESES. ANY NEW COMMENT WILL BE LISTED AFTER | | | PREVIOUS COMMENTS. | | | | | | 1. | | | | | | 2. | | | | | | 3. PROVIDE A ROOF FRAMING PLAN. | | | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS | | | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH | | | 107.2.5. | | | | | | 3A) PROVIDE THE DESIGN PRESSURES FOR NEW ROOFING PER | | | FIGURE R301.2(7) COMPONENT AND CLADDING PRESSURE ZONES | | | R301.2.1.1WIND DESIGN REQUIRED. | | | | | | 3B) PROVIDE A ROOF SHEATHING FASTENER SCHEDULE PER | | | CALCULATED DESIGN PRESSURES. | | | TABLE R301.2.1.2 WINDBORNE DEBRIS PROTECTION FASTENING | | | SCHEDULE FOR WOOD STRUCTURAL PANELS. | | | | | | NEW COMMENT: | | | | | | PLAN REVIEW RESPONSE LETTER STATES COMMENTS 3, 3A AND | | | 3B HAVE BEEN ADDRESSED ON PLAN PAGE S2-O, THERE IS NO | | | PLAN PAGE S2-0 SUBMITTED FOR REVIEW. | | | PLEASE PROVIDE PLAN PAGE S2-0 FOR REVIEW. | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | | | | WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-05-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-05-14 |
Time |
07:33 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-05-14 |
Time |
06:31 |
Sent To |
|
|
| Notes |
| 2022-05-14 07:41:06 | PLAN REVIEW BUILDING | | | | | | CHRISTOPHER S. THROOP, C.B.O., CFM | | | PLANS EXAMINER II PX3169/SFP306 | | | BU1635 BN4338 | | | ASFPM CFM US-21-11935 | | | CITY OF WEST PALM BEACH | | | (561) 805-6726 | | | [email protected] | | | | | | CODES IN EFFECT: | | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | | CHAPTER 1 ADMINISTRATION | | | NFPA 70 2017 EDITION NEC 2017 | | | | | | 1ST REVIEW | | | | | | RESULTS: DENIED | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | | | 1.PROVIDE A COPY OF THE MOST RECENT BOUNDY LINE SURVEY. | | | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS | | | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH | | | 107.2.5. | | | | | | 2. FL17838-R5 IS MISSING PAGES 2 THRU 8 OF THE | | | INSTALLATION INSTRUCTIONS. | | | PROVIDE A COPY OF THE CURRENT FLORIDA PRODUCT APPROVAL, | | | APPROVED UNDER THE 2020 FBC, FOR THE PROPOSED DEVICES | | | TO BE INSTALLED. | | | FL PRODUCT APPROVALS SHALL INCLUDE THE COVER SHEETS, | | | EVALUATION REPORT AND INSTALLATIONS INSTRUCTIONS. | | | FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE | | | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED | | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | | | | | 3. PROVIDE A ROOF FRAMING PLAN. | | | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS | | | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH | | | 107.2.5. | | | | | | 3A) PROVIDE THE DESIGN PRESSURES FOR NEW ROOFING PER | | | FIGURE R301.2(7) COMPONENT AND CLADDING PRESSURE ZONES | | | R301.2.1.1WIND DESIGN REQUIRED. | | | | | | 3B) PROVIDE A ROOF SHEATHING FASTENER SCHEDULE PER | | | CALCULATED DESIGN PRESSURES. | | | TABLE R301.2.1.2 WINDBORNE DEBRIS PROTECTION FASTENING | | | SCHEDULE FOR WOOD STRUCTURAL PANELS. | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | | | | WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
N |
Date |
2022-04-08 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-04-08 |
Time |
14:20 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-04-08 |
Time |
14:20 |
Sent To |
|
|
| Notes |
| 2022-04-08 14:21:34 | NO ELECTRIC WORK SHOWN, REVIEWED OR APPROVED.MP |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-07-25 |
Time |
12:13 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-06-27 |
Time |
13:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-06-25 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-06-25 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-06-02 |
Time |
09:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-05-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-05-14 |
Time |
07:41 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-03-14 |
Time |
07:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2022-07-27 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-07-27 |
Time |
10:30 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-07-25 |
Time |
15:05 |
Sent To |
|
|
| Notes |
| 2022-07-27 10:30:51 | NO IMPACT FEES DUE FOR PERMIT. LEM | | 2022-07-25 15:06:12 | 7/25/22 EMAILED IMPACT OFFICE TO REVIEW. LEM |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2022-05-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-05-14 |
Time |
07:31 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-05-14 |
Time |
06:31 |
Sent To |
|
|
| Notes |
| 2022-05-14 07:32:14 | IMPACT FEE QUESTIONNAIRE | | | | | | PALM BEACH COUNTY IMPACT FEES - DIGITAL SUBMITTALS | | | | | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECT DOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. OUR PERMIT | | | LIBRARIANS WILL SEND THE IMPACT FEE QUESTIONNAIRE TO | | | THE PALM BEACH COUNTY IMPACT FEE OFFICE ON YOUR BEHALF. | | | THE FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZ | | | B/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | UPON APPROVAL AND PAYMENT OF FEES, PLEASE UPLOAD THE | | | RECEIPT TO PROJECT DOX OR EMAIL IT TO | | | [email protected] | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-07-25 |
Time |
12:12 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-07-25 |
Time |
12:08 |
Sent To |
|
|
| Notes |
| 2022-07-25 12:12:36 | PROVISO ON PLAN PAGE A-002: A SEPERATE ROOFING PERMIT | | | IS REQUIRED. CT |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2022-05-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-05-14 |
Time |
07:32 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-05-14 |
Time |
06:31 |
Sent To |
|
|
| Notes |
| 2022-05-14 07:32:56 | PROVISO ON PLAN PAGE A-002: A SEPERATE ROOFING PERMIT | | | IS REQUIRED. CT |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-07-25 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-07-25 |
Time |
12:12 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-07-25 |
Time |
12:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-05-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-05-14 |
Time |
07:31 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-05-14 |
Time |
06:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-06-10 |
|
|
Cont ID |
|
| Sent By |
afowlkes |
Date |
2022-06-10 |
Time |
10:43 |
Rev Time |
0.00 |
| Received By |
afowlkes |
Date |
2022-06-10 |
Time |
10:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-03-21 |
|
|
Cont ID |
|
| Sent By |
afowlkes |
Date |
2022-03-21 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
afowlkes |
Date |
2022-03-21 |
Time |
10:00 |
Sent To |
|
|
| Notes |
|
|