Plan Review Details - Permit 22030531
Plan Review Stops For Permit 22030531
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-05-11 Cont ID  
Sent By cthroop Date 2022-05-11 Time 17:09 Rev Time 0.00
Received By cthroop Date 2022-05-04 Time 18:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-06-30 Cont ID  
Sent By mpeterso Date 2022-06-30 Time 13:20 Rev Time 0.00
Received By mpeterso Date 2022-06-30 Time 13:20 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-04-26 Cont ID  
Sent By mpeterso Date 2022-04-26 Time 09:01 Rev Time 0.00
Received By mpeterso Date 2022-04-26 Time 09:01 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2022-06-30 Cont ID  
Sent By ccole Date 2022-06-30 Time 08:28 Rev Time 0.00
Received By ccole Date 2022-06-30 Time 07:42 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2022-05-25 Cont ID  
Sent By ccole Date 2022-05-25 Time 08:25 Rev Time 0.00
Received By ccole Date 2022-05-25 Time 07:24 Sent To  
Notes
2022-05-25 08:26:212ND REVIEW FBC-2020 RES. GAS
 PERMIT- 22030531
 5/25/2022
  
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION
 2020
 FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020
 FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION
 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED. THE REQUESTED
 MANUFACTURER?S SPECIFCATIONS FOR THE DRYER IN THE GUEST
 HOUSE WERE NOT SUBMITTED. PLEASE REVIEW 1ST REVIEW
 COMMENT BELOW AND COMPLY
  
 1) FAILED. G.1: PLEASE SUBMIT MANUFACTURERS
 SPECIFICATIONS FOR THE GAS DRYER- SEC. G2439.1 FBC RES.
 MAKE UP AIR SHALL BE PROVIDED IN ACCORDANCE WITH THE
 MANUFACTURER'S SPECIFICATIONS. THE PLAN APPEARS TO SHOW
 THE DRYER WILL BE INSTALLED IN A HALLWAY OPEN TO THE
 BEDROOM WHICH IS PROHIBITED PER SEC. G2406.2 FBC RES.
 GAS. THE DRYER IS ALLOWED TO BE INSTALLED IF MEETING
 EXCEPTION #5- THE DRYER SHALL BE ENCLOSED WITH A SOLID
 WEATHER- STRIPPED DOOR EQUIPPED WITH A SELF CLOSING
 DEVICE. ALL COMBUSTION AIR SHALL BE TAKEN DIRECTLY FROM
 THE OUTDOORS IN ACCORDANCE WITH SEC. G2407.6. AS AN
 ALTERNATIVE TO MEETING THE FUEL GAS CODE REQUIREMENTS
 PROVIDE AN ELECTRIC DRYER.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2022-04-08 Cont ID  
Sent By ccole Date 2022-04-08 Time 16:02 Rev Time 0.00
Received By ccole Date 2022-04-08 Time 15:30 Sent To  
Notes
2022-04-08 16:16:431ST REVIEW FBC-2020 RES. GAS
 PERMIT- 22030531
 4/8/2022
  
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION
 2020
 FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020
 FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION
 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) G.1: PLEASE SUBMIT MANUFACTURERS SPECIFICATIONS FOR
 THE GAS DRYER- SEC. G2439.1 FBC RES. MAKE UP AIR SHALL
 BE PROVIDED IN ACCORDANCE WITH THE MANUFACTURER'S
 SPECIFICATIONS.
  
 2) PLEASE SEE ZONING REVIEW COMMENTS. FINAL GAS
 APPROVAL WILL BE CONTINGENT ON ZONING APPROVAL OF THE
 ADU.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-06-30 Cont ID  
Sent By cthroop Date 2022-06-30 Time 16:55 Rev Time 0.00
Received By cthroop Date 2022-06-29 Time 14:17 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2022-05-25 Time   Rev Time 0.00
Received By lmarchan Date 2022-05-23 Time 10:20 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-05-11 Cont ID  
Sent By cthroop Date 2022-05-11 Time 17:09 Rev Time 0.00
Received By cthroop Date 2022-04-06 Time 07:47 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2022-05-23 Cont ID  
Sent By lmarchan Date 2022-05-23 Time 16:02 Rev Time 0.00
Received By lmarchan Date 2022-05-18 Time 06:26 Sent To  
Notes
2022-05-23 10:27:52RECEIPT MU-2022-023010 - $1945.04 PAID
2022-05-18 06:27:065/18/22 AS PER JG, EMAILED IMPACT FOR REVIEW-AO

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2022-05-11 Cont ID  
Sent By cthroop Date 2022-05-11 Time 17:07 Rev Time 0.00
Received By cthroop Date 2022-05-11 Time 15:30 Sent To  
Notes
2022-05-11 17:08:27IMPACT FEE QUESTIONNAIRE
  
 PALM BEACH COUNTY IMPACT FEES - DIGITAL SUBMITTALS
  
 PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECT DOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. OUR PERMIT
 LIBRARIANS WILL SEND THE IMPACT FEE QUESTIONNAIRE TO
 THE PALM BEACH COUNTY IMPACT FEE OFFICE ON YOUR BEHALF.
 THE FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZ
 B/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
 UPON APPROVAL AND PAYMENT OF FEES, PLEASE UPLOAD THE
 RECEIPT TO PROJECT DOX OR EMAIL IT TO
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2022-06-30 Cont ID  
Sent By cthroop Date 2022-06-30 Time 16:54 Rev Time 0.00
Received By cthroop Date 2022-06-30 Time 16:54 Sent To  
Notes
2022-06-30 16:55:17MECHANICAL APPROVED BY MICHAEL EDWARDS ON 4/13/22. CT

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2022-04-13 Cont ID  
Sent By medwards Date 2022-04-13 Time 17:22 Rev Time 0.00
Received By medwards Date 2022-04-13 Time 17:21 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2022-06-30 Cont ID  
Sent By ccole Date 2022-06-30 Time 08:28 Rev Time 0.00
Received By ccole Date 2022-06-30 Time 07:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2022-05-25 Cont ID  
Sent By ccole Date 2022-05-25 Time 08:04 Rev Time 0.00
Received By ccole Date 2022-05-25 Time 07:24 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-04-08 Cont ID  
Sent By ccole Date 2022-04-08 Time 15:30 Rev Time 0.00
Received By ccole Date 2022-04-08 Time 15:30 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2022-05-11 Cont ID  
Sent By cthroop Date 2022-05-11 Time 17:08 Rev Time 0.00
Received By cthroop Date 2022-05-11 Time 15:30 Sent To  
Notes
2022-05-11 17:09:07SEE COMMENTS UNDER PERMIT 21100553.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-06-30 Cont ID  
Sent By mpeterso Date 2022-06-30 Time 13:25 Rev Time 0.00
Received By mpeterso Date 2022-06-30 Time 13:25 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-05-11 Cont ID  
Sent By cthroop Date 2022-05-11 Time 17:09 Rev Time 0.00
Received By cthroop Date 2022-05-11 Time 15:31 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-04-20 Cont ID  
Sent By vbroglia Date 2022-04-20 Time 08:33 Rev Time 0.00
Received By vbroglia Date 2022-04-08 Time 08:33 Sent To  
Notes
2022-04-08 09:12:104/8/2022 *** FAILED***
  
 PER STAFF RESEARCH A PERMIT WAS NEVER ISSUED FOR AN
 ACCESSORY APARTMENT, OUR RECORDS INDICATE THE ACCESSORY
 STRUCTURE IS A GARAGE THAT WAS NEVER LEGALLY
 TRANSFORMED INTO A ADU. THEREFORE, IT MUST BE CONVERTED
 BACK INTO A GARAGE
  
 DUE TO THE SIZE OF THE LOT WIDTH BEING LESS THAN 60
 FEET, PER SECTION 94-303 IN THE EVENT A PROPERTY OWNER
 CAN NOT MEET ANY OF THE ADDITIONAL STANDARDS SHOWN IN
 SUBSECTION (B), SUCH WAIVER SHALL REQUIRE APPROVAL BY
 THE ZONING BOARD OF APPEALS AS A CLASS B SPECIAL USE
 PERMIT.
  
 SEPARATE PERMIT REQUIRED FOR:
 FENCE/WALL, DRIVEWAY, GENERATOR, MECHANICAL/AC/POOL
 EQUIPMENT, IRRIGATION, LANDSCAPE, OTHER ACCESSORY
 STRUCTURES.
  
 THE VALUE OF THE CONSTRUCTION ($150,000) EXCEEDS 50% OF
 THE STRUCTURE'S VALUE ($128,294) ACCORDING TO THE
 P.B.C. PROPERTY APPRAISER'S OFFICE; THEREFORE, PURSUANT
 TO SECTION 94-441(B) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS (ZLDR), THE LANDSCAPE ON THE SITE SHALL BE
 IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS FOUND IN
 ARTICLE XIV OF THE ZLDR. IF THE SITE CONFORMS TO
 ARTICLE XIV, THEN TWO (2) COPIES OF A LANDSCAPE PLAN
 DEMONSTRATING COMPLIANCE SHALL BE INCLUDED WITH THE
 PERMIT RE-SUBMITTAL. IF THE SITE DOES NOT CONFORM TO
 ARTICLE XIV, THEN PRIOR TO THE ZONING APPROVAL OF THIS
 PERMIT A SEPARATE LANDSCAPE PERMIT AND IRRIGATION
 PERMIT SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE
 SITE INTO CONFORMITY.
  
 VALENTINA BROGLIA
 ASSOCIATE PLANNER
 [email protected]
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved