| Plan Review Stops For Permit 22030459 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
P |
Date |
2022-04-12 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-04-12 |
Time |
12:59 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-04-12 |
Time |
12:59 |
Sent To |
|
|
| Notes |
| 2022-04-12 13:00:09 | PCN ESTABLISHED |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2022-03-09 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-03-09 |
Time |
16:56 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-03-09 |
Time |
16:56 |
Sent To |
|
|
| Notes |
| 2022-03-09 16:56:34 | TOWN HOME WAS ISSUED THE ADDRESS OF 1947 DOCK ST AS | | | PREVIOUSLY AGREED UPON. APPLICATION FORM NEEDS TO | | | REFLECT THE CORRECT ADDRESS. A PARCEL CONTROL NUMBER | | | NEEDS TO BE ESTABLISHED FOR THIS LOT, PLEASE SEE BELOW | | | FOR INSTRUCTIONS: | | | REQUEST A PALM BEACH COUNTY?S PARCEL SPLIT REQUEST FORM | | | WHICH CAN BE FOUND AT THIS LINK | | | HTTPS://WWW.PBCGOV.ORG/PAPA/DEPARTMENTS/GIS.HTM, THEY | | | WILL ISSUE YOU WITH A UNIQUE PARCEL CONTROL NUMBER | | | (PCN). WHEN YOU CONTACT THE PROPERTY APPRAISERS YOU | | | NEED TO REQUEST PRELIMINARY LETTER OF THE PCN. ONCE YOU | | | HAVE RECEIVED THE PRELIMINARY LETTER PLEASE CONTACT | | | [email protected] OR CALL 561-805-6659 SO THAT I CAN | | | ACTIVATE THE PARCEL. | | | ALSO PLEASE NOTE THAT THE OVERALL PARCEL ADDRESS IS | | | 1919 DOCK ST WHICH WE WILL USE FOR THE COMMON AREAS AND | | | THE NORTH BUILDING, THE SOUTH BUILDING WILL HAVE AN | | | ADDRESS OF 1969 DOCK ST. | | | CAROLINE PUELL | | | ADDRESSING COORDINATOR | | | [email protected] | | | 561-805-6659 | | | |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
2 |
Status |
P |
Date |
2022-08-05 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
2022-06-06 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
scwelter |
Date |
2022-08-05 |
Time |
11:46 |
Sent To |
|
|
| Notes |
| 2022-06-06 09:58:36 | CONTACT [email protected] | | | | | | ART ASSESSMENT APPLICATION SEE PREVIOUS NOTES ON PUBLIC | | | ART REQUIREMENT. |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
F |
Date |
2022-05-18 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
2022-05-18 |
Time |
13:32 |
Rev Time |
0.00 |
| Received By |
scwelter |
Date |
2022-06-06 |
Time |
09:57 |
Sent To |
|
|
| Notes |
| 2022-05-18 13:37:06 | | | | CONTACT [email protected] | | | DEVELOPMENT SUBJECT TO PUBLIC ART REQUIREMENT. THIS | | | PERMIT IS TIED TO PERMIT 22030459 AND INCLUDES | | | 22030466, 22030465, 22030463, | | | 22030461,22030460,22030459, 22030457,22030456,22030455, | | | 22030454,22030452,22030451,22030450 | | | CONTACT [email protected] FOR ART ASSESSMENT APPLICATION | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2022-08-11 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-11 |
Time |
09:38 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-11 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2022-07-26 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-26 |
Time |
11:31 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-26 |
Time |
11:31 |
Sent To |
|
|
| Notes |
| 2022-07-26 11:34:54 | NEW TOWNHOUSE | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | | APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED | | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR | | | ROOF WIND ZONES 2 AND 3 WHICH REQUIRE A HIGHER PRESSURE | | | (PER DRAWING S-7) THAN THE MAXIMUM SHOWN ON THE PRODUCT | | | APPROVAL (-52.5) - SEE NOTE NUMBER 9 ON THE PRODUCT | | | APPROVAL. | | | | | | 2) ROOFING SYSTEM PRODUCT APPROVALS MAY BE DEFERRED | | | SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON THE | | | CONSTRUCTION DOCUMENTS - FBC WPB 107.3.4.1 DEFERRED | | | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED | | | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN | | | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL | | | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING | | | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS | | | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE | | | BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL | | | ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A | | | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL | | | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL | | | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED | | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE | | | BUILDING OFFICIAL. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-06-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-06-08 |
Time |
13:22 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-06-08 |
Time |
13:21 |
Sent To |
|
|
| Notes |
| 2022-06-08 13:22:14 | NEW TOWNHOUSE | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) REVISED DRAWING A001 HAS BEEN UPLOADED TO PROJECTDOX | | | ON TOP OF DRAWING A000 - PLEASE FIX | | | | | | 2) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | | APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED | | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR | | | ROOF WIND ZONES 2 AND 3 WHICH REQUIRE A HIGHER PRESSURE | | | (PER DRAWING S-7) THAN THE MAXIMUM SHOWN ON THE PRODUCT | | | APPROVAL (-52.5) - SEE NOTE NUMBER 9 ON THE PRODUCT | | | APPROVAL. | | | | | | 3) PLEASE PROVIDE THE SMART FLOOD VENT PRODUCT APPROVAL | | | OR ICC EVALUATION CERTIFICATE. | | | | | | 4) ELEVATION CERTIFICATES NEED CORRECTIONS - | | | | | | A) A9(A) INCORRECT SQUARE FOOTAGE OF THE GARAGE SHOWN. | | | B) A9(B) INCORRECT NUMBER OF FLOOD VENTS SHOWN. | | | C) A9(C) PLEASE SHOW THE TOTAL SQUARE INCHES OF FLOOD | | | OPENINGS. | | | D) A9(D) SMART VENTS ARE ENGINEERED VENTS - SHOULD BE | | | MARKED "YES". | | | | | | 5) SITE PLAN SHOULD SHOW THE SITE DRAINAGE - OR PROVIDE | | | THE CIVIL STORM WATER DRAINAGE PLAN - | | | FBC WPB 107.2.5 SITE PLAN. THE CONSTRUCTION DOCUMENTS | | | SUBMITTED WITH THE APPLICATION FOR PERMIT SHALL BE | | | ACCOMPANIED BY A SITE PLAN SHOWING TO SCALE THE SIZE | | | AND LOCATION OF NEW CONSTRUCTION AND EXISTING | | | STRUCTURES ON THE SITE, DISTANCES FROM LOT LINES, THE | | | ESTABLISHED STREET GRADES AND THE PROPOSED FINISHED | | | GRADES, DEPICTING THE PROPOSED LOT DRAINAGE AND, AS | | | APPLICABLE, FLOOD HAZARD AREAS, FLOODWAYS, AND DESIGN | | | FLOOD ELEVATIONS; AND IT SHALL BE DRAWN IN ACCORDANCE | | | WITH AN ACCURATE AND INCLUDED ON A BOUNDARY LINE | | | SURVEY. (PLEASE PROVIDE CUT SECTIONS FOR ANY PROPOSED | | | WATER RETAINING SWALES) | | | | | | 6) "PLUNGE POOL" - BARRIER SHOULD SURROUND THE POOL - | | | THE GATE ON THE SIDE UNITS NEEDS TO BE SELF-CLOSING AND | | | LATCHING PER FBC R4501.17.1.8 | | | ACCESS GATES, WHEN PROVIDED, SHALL BE SELF-CLOSING AND | | | SHALL COMPLY WITH THE REQUIREMENTS OF SECTIONS | | | R4501.17.1.1 THROUGH R4501.17.1.7 AND SHALL BE EQUIPPED | | | WITH A SELF-LATCHING LOCKING DEVICE LOCATED ON THE POOL | | | SIDE OF THE GATE. WHERE THE DEVICE RELEASE IS LOCATED | | | NO LESS THAN 54 INCHES (1372 MM) FROM THE BOTTOM OF THE | | | GATE, THE DEVICE RELEASE MECHANISM MAY BE LOCATED ON | | | EITHER SIDE OF THE GATE AND SO PLACED THAT IT CANNOT BE | | | REACHED BY A YOUNG CHILD OVER THE TOP OR THROUGH ANY | | | OPENING OR GAP FROM THE OUTSIDE. GATES THAT PROVIDE | | | ACCESS TO THE SWIMMING POOL MUST OPEN OUTWARD AWAY FROM | | | THE POOL. THE GATES AND BARRIER SHALL HAVE NO OPENING | | | GREATER THAN 1/2 INCH (12.7 MM) WITHIN 18 INCHES (457 | | | MM) OF THE RELEASE MECHANISM. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-04-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-04-12 |
Time |
08:03 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-04-11 |
Time |
14:51 |
Sent To |
|
|
| Notes |
| 2022-04-12 08:03:07 | NEW TOWNHOUSE | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) PLEASE SHOW THE EMERGENCY EGRESS FROM THE 2ND FLOOR | | | BEDROOMS THAT LEAD DIRECTLY TO A PUBLIC WAY - FBC | | | R310.1 EMERGENCY ESCAPE AND RESCUE OPENING REQUIRED. | | | BASEMENTS, HABITABLE ATTICS AND EVERY SLEEPING ROOM | | | SHALL HAVE NOT LESS THAN ONE OPERABLE EMERGENCY ESCAPE | | | AND RESCUE OPENING. WHERE BASEMENTS CONTAIN ONE OR MORE | | | SLEEPING ROOMS, AN EMERGENCY ESCAPE AND RESCUE OPENING | | | SHALL BE REQUIRED IN EACH SLEEPING ROOM. EMERGENCY | | | ESCAPE AND RESCUE OPENINGS SHALL OPEN DIRECTLY INTO A | | | PUBLIC WAY, OR TO A YARD OR COURT THAT OPENS TO A | | | PUBLIC WAY. | | | | | | 2) PLEASE PROVIDE THE PRODUCT APPROVAL FOR THE OVERHEAD | | | GARAGE DOOR - THE GARAGE DOOR PRODUCT APPROVAL SHOWN ON | | | THE DRAWINGS ALLOWS FOR BOTTOM VENTS OF 120 SQUARE | | | INCHES MAX. - CUTTING HOLES IN THE GARAGE DOOR FOR | | | FLOOD VENTS WILL VOID THE PRODUCT APPROVAL - PLEASE | | | PROVIDE DETAILS FROM A DESIGN PROFESSIONAL TO INSTALL | | | FLOOD VENTS IN THE OVERHEAD GARAGE DOOR BEYOND THE 120 | | | SQUARE INCHES ALLOWED BY THE PRODUCT APPROVAL. | | | | | | 3) FLOOD VENTS SHOULD BE PLACED IN OPPOSITE SIDES OF | | | THE BUILDING - PLEASE SHOW FLOOD VENTS IN THE SIDE OF | | | THE BUILDING WHERE POSSIBLE FBC R322.2.2.1 | | | | | | 4) PLEASE SHOW THE REQUIRED WIND DESIGN PRESSURE FOR | | | THE WINDOW AND DOOR OPENINGS FBC R301.2.1 | | | | | | 5) PLEASE PROVIDE THE ADDITIONAL ROOF SYSTEM ATTACHMENT | | | DETAILS FROM A DESIGN PROFESSIONAL FOR WIND ZONES 2 AND | | | 3 AS NOTED ON THE ROOF SYSTEM PRODUCT APPROVAL. | | | | | | 6) PLEASE SHOW THE "PLUNGE POOL" BARRIER FROM THE | | | RESIDENCE PER FBC R4502.17.1 | | | | | | 7) PLEASE PROVIDE AN ELEVATION CERTIFICATE MARKED | | | "CONSTRUCTION DRAWINGS" FBC WPB 107.3.5.3 | | | | | | 8) PLEASE SHOW EQUIPMENT ELEVATION IN THE GARAGE OR | | | OUTSIDE THE BUILDING FBC R322.1.6 PROTECTION OF | | | MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS. | | | ELECTRICAL SYSTEMS, EQUIPMENT AND COMPONENTS; HEATING, | | | VENTILATING, AIR CONDITIONING; PLUMBING APPLIANCES AND | | | PLUMBING FIXTURES; DUCT SYSTEMS; AND OTHER SERVICE | | | EQUIPMENT SHALL BE LOCATED AT OR ABOVE THE ELEVATION | | | REQUIRED IN SECTION R322.2 OR R322.3. | | | | | | 9) THE WALLS SEPARATING THE TOWNHOUSES CANNOT HAVE | | | OPENINGS BELOW THE 2ND FLOOR IN THE COURT YARD AREA - | | | FBC R302.2.1 CONTINUITY. | | | THE FIRE-RESISTANCE-RATED WALL OR ASSEMBLY SEPARATING | | | TOWNHOUSES SHALL BE CONTINUOUS FROM THE FOUNDATION TO | | | THE UNDERSIDE OF THE ROOF SHEATHING, DECK OR SLAB. THE | | | FIRE-RESISTANCE RATING SHALL EXTEND THE FULL LENGTH OF | | | THE WALL OR ASSEMBLY, INCLUDING WALL EXTENSIONS THROUGH | | | AND SEPARATING ATTACHED ENCLOSED ACCESSORY STRUCTURES. | | | | | | 10) DRAWING S2 SHOWS A CUT SECTION (9/S6) AND (10/S6) | | | WHICH SHOWS THE FLOOR SHEATHING RUNNING CONTINOUS | | | THROUGH THE COMMON 2 HR RATED WALL FBC R302.2.1 | | | CONTINUITY. | | | THE FIRE-RESISTANCE-RATED WALL OR ASSEMBLY SEPARATING | | | TOWNHOUSES SHALL BE CONTINUOUS FROM THE FOUNDATION TO | | | THE UNDERSIDE OF THE ROOF SHEATHING, DECK OR SLAB. THE | | | FIRE-RESISTANCE RATING SHALL EXTEND THE FULL LENGTH OF | | | THE WALL OR ASSEMBLY, INCLUDING WALL EXTENSIONS THROUGH | | | AND SEPARATING ATTACHED ENCLOSED ACCESSORY STRUCTURES. | | | | | | 11) A SEPARATE PERMIT IS REQUIRED FOR - SITE LIGHTING, | | | FENCING, POOL. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-03-25 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-03-25 |
Time |
14:16 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-03-25 |
Time |
12:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E-LOWVOLT |
ELECTRICAL LOW VOLTAGE |
| Rev No |
1 |
Status |
P |
Date |
2022-03-25 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-03-25 |
Time |
14:17 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-03-25 |
Time |
14:17 |
Sent To |
|
|
| Notes |
| 2022-03-25 14:18:01 | TV AND TELEPHONE/DATA JLEAHY |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2022-06-14 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2022-06-14 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2022-06-14 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-06-14 14:42:50 | PASSED WITH PROVISO: UPLOAD APPROVED CIVIL PLANS FROM | | | FORMAL ENGINEERING REVIEW E21100031. | | | | | | THANKS, | | | RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB | | | ENGINEERING SERVICES DEPARTMENT | | | (561) 494-1098, FAX: (561) 494-1116 EMAIL: | | | [email protected] | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2022-03-23 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2022-03-23 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2022-03-23 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-03-23 13:24:11 | UNDER FORMAL ENGINEERING SUBMITTAL REVIEW E21100031. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2022-07-22 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-07-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-07-22 |
Time |
11:42 |
Sent To |
|
|
| Notes |
| 2022-07-22 11:49:29 | FIRE PROVISO: | | | | | | ALL FIRE LINE UNDERGROUND & FIRE SPRINKLER WORK SHALL | | | BE SUBMITTED UNDER SEPARATE PERMITS & SHOP DRAWINGS. | | | | | | THE FIRE SPRINKLER SYSTEM IS REQUIRED TO BE MONITORED | | | WITH THE FIRE ALARM WORK BEING SUBMITTED UNDER SEPARATE | | | PERMITS & SHOP DRAWINGS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2022-06-07 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-06-07 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-06-07 |
Time |
13:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2022-03-25 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-03-25 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-03-25 10:48:49 | 03/25/22 1ST GAS REVIEW**DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. A SUB GAS PERMIT IS REQUIRED BY A LICENSED | | | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS | | | TO THE FBC SEC. 105.1. PLEASE PLACE A NOT ON PLANS. | | | | | | 2. WOULD YOU PLEASE SUBMIT EACH LENGTH OF ALL CUT | | | SECTIONS OF PIPE ON THE ISOMETRIC DRAWING PER 2020 FBC | | | RES. SECS. G2413.4.1, G2413.4.2. | | | | | | 3. IS THE POOL HEATER IN A GARAGE? WOULD YOU PLEASE | | | SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE FBC RES. | | | SEC. G2407.1 AND G2439.4. IF THE LOUVER IS USED, SHOW | | | THE LOUVERS' LOCATIONS THAT ARE BEING INSTALLED FOR THE | | | COMBUSTION AIR. THE LOUVERS CANNOT BE LOCATED ON AN | | | EXTERIOR WALL THAT IS FIRE RATED AS THE FIRE RATING OF | | | THE WALL MUST BE MAINTAINED PER THE WPB AMENDMENTS TO | | | FBC SEC.107.2.1. PLEASE PROVIDE VENTING DIAGRAMS | | | SHOWING THE TYPE AND SIZE OF GAS VENTS, GAS VENT RUNS, | | | AND TERMINATION LOCATIONS FOR POOL HEATER PER THE 2020 | | | FBC FG SEC. 503. | | | | | | 4. SHOW THE DISTANCE FROM THE POINT OF THE DELIVERY GAS | | | METER TO THE MOST REMOTE OUTLET IN THE BUILDING AND/OR | | | SYSTEM PER THE 2020 FBC RES. SEC. G2413.4.1. | | | | | | 5. LIST THE BTU LOAD OF EACH APPLIANCE WITH THE TOTAL | | | BTU LOAD ON THE SYSTEM. REFER TO THE 2020 FBC RES. SEC. | | | G2413. | | | | | | 6. WOULD YOU PLEASE PROVIDE WHAT TYPE OF GAS (LP OR | | | NATURAL) IS BEING USED PER THE WPB AMENDMENTS TO THE | | | FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | | | | | 7. INDICATE THE SYSTEM'S DELIVERY PRESSURE (PSI) ON THE | | | PLAN PER THE 2020 FBC RES. SEC. G2413.2. | | | | | | 8. WOULD YOU PLEASE PROVIDE MANUFACTURES SPECIFICATIONS | | | FOR ALL EQUIPMENT TO VERIFY COMPLIANCE WITH 2020 FBC | | | RES. SEC. G2408.1. GAS APPLIANCES SHALL BE LISTED AND | | | LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | | APPLIANCES/EQUIPMENT SHALL BE ONSITE AT THE TIME OF | | | INSPECTION PER THE 2020 FBC RES. SEC. G2413.2 AND | | | G2404.3. | | | | | | 9. A GAS GRILL IS LABELED FOR OUTDOOR USE, AND IT SEEMS | | | TO BE IN A COVERED PATIO; IF SO, PLEASE PROVIDE | | | MANUFACTURERS RECOMMENDATION FOR A VENTILATION HOOD PER | | | THE 2020 FG 305.1 OR 2020 FBC RES. SEC. G2408.1. A | | | SEPARATE PERMIT MAY BE REQUIRED FOR HOOD PER THE WPB | | | AMENDMENTS TO THE FBC SEC. 105.1. | | | | | | 10. WOULD YOU PLEASE LABEL THE SHUTOFF VALVES AND DRIP | | | LEGS ON GAS ISOMERIC PER THE 2020 FBC RES. SEC. G2420.5 | | | AND SHOW SHUT OFF ON THE MAIN METER, PLEASE. | | | | | | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. | | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA | | | | | | WEST PALM BEACH AMENDMENTS 2017 FBC CHAPTER; UPON | | | REQUEST. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-08-15 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-08-15 |
Time |
12:55 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-08-03 |
Time |
13:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-07-27 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-07-27 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-07-21 |
Time |
15:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-07-06 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-06 |
Time |
08:50 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-06-06 |
Time |
07:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-04-13 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-04-13 |
Time |
09:04 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-03-21 |
Time |
09:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2022-08-26 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-08-26 |
Time |
11:24 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-08-15 |
Time |
12:55 |
Sent To |
|
|
| Notes |
| 2022-08-26 10:27:25 | RECEIPT MU-2022-039292-0000 $52,506.16 PAID AO | | 2022-08-15 12:55:29 | 8/15/22 EMAILED IMPACT OFFICE FOR REVIEW. LEM |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2022-04-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-04-12 |
Time |
08:03 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-04-12 |
Time |
08:03 |
Sent To |
|
|
| Notes |
| 2022-04-12 08:05:09 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE | | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | | [email protected] . | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2022-06-13 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-06-13 |
Time |
11:14 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-06-13 |
Time |
11:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2022-03-25 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-03-25 |
Time |
08:53 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-03-25 |
Time |
08:30 |
Sent To |
|
|
| Notes |
| 2022-03-25 08:56:29 | 1ST REVIEW FBC-2020 MECHANICAL | | | PERMIT-22030459 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE | | | FBC M- FLORIDA MECHANICAL CODE | | | FBC EC- FLORIDA ENERGY CONSERVATION | | | FBC FG- FLORIDA FUEL GAS | | | FBC EX- FLORIDA EXISTING BUILDING CODE | | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) AN ENERGY CALCULATION MUST BE SUBMITTED FOR EACH | | | TOWN HOUSE, THIS SUBMITTAL MUST INCLUDE THE ADDRESS FOR | | | EACH TOWNHOME. FBC EC R402 | | | | | | 2) A MECHANICAL EQUIPMENT SIZING CALCULATION MUST BE | | | SUBMITTED FOR EACH TOWN HOUSE. FBC EC R403.7 | | | | | | 3) THE PERMIT APPLICATION MUST HAVE THE CORRECT ADDRESS | | | FOR EACH TOWN HOUSE. FBC 107.2.1 | | | | | | 4) EACH TOWN HOUSE MUST HAVE A SEPARATE PERMIT | | | APPLICATION. THE PERMIT APPLICATIONS ?WORK DESCRIPTION? | | | STATES NEW CONSTRUCTION OF 7 TOWNHOUSES ON EACH | | | APPLICATION SUBMITTED. PLEASE SHOW THAT EACH | | | APPLICATION IS FOR A SPECIFIC ADDRESS AND PROJECT FOR | | | THAT ADDRESS. FBC 107.2.1 | | | | | | 5) UNIT SHEETS: KEYNOTE 3 SPECS OUT A RE-CIRCULATING | | | TYPE RANGE HOOD BUT IN THE SUPPORTING DOCUMENTS THERE | | | IS A 600 CFM HOOD EXHAUST FAN. PLEASE EITHER SHOW THE | | | DUCTWORK FOR THE HOOD AND THE TERMINATION LOCATION OR | | | REMOVE THE 600 CFM HOOD MOTOR IN THE SUPPORTING | | | DOCUMENTS FOR THIS SUBMITTAL. FBC 107.2.1 | | | | | | 6) PLEASE PROVIDE VENTILATION REQUIREMENTS FROM THE | | | MANUFACTURER FOR THE POOL MOTOR AND POOL PUMPS THAT ARE | | | LOCATED IN THE GARAGES. FBC 107.2.1 | | | | | | | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
2 |
Status |
P |
Date |
2022-06-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-06-08 |
Time |
13:22 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-06-08 |
Time |
13:22 |
Sent To |
|
|
| Notes |
| 2022-06-08 13:23:11 | FIRM = AE 12.1 | | | | | | PROPOSED LOWEST FLOOR = 14.2 NAVD | | | | | | GARAGE FLOOR AT = 11.0 - WITH FLOOD VENTS |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
1 |
Status |
P |
Date |
2022-04-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-04-12 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-04-12 |
Time |
08:36 |
Sent To |
|
|
| Notes |
| 2022-04-12 08:42:44 | FIRM = AE 12.1 | | | | | | PROPOSED LOWEST FLOOR = 14.2 | | | | | | GARAGE FLOOR AT = 11.0 - WITH FLOOD VENTS |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2022-06-07 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-06-07 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-06-07 |
Time |
13:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2022-03-25 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-03-25 |
Time |
10:44 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2022-03-25 |
Time |
09:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
4 |
Status |
N |
Date |
2022-08-11 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-11 |
Time |
09:38 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-11 |
Time |
09:38 |
Sent To |
|
|
| Notes |
| 2022-08-11 09:38:50 | ROOFING SYSTEM TO BE DEFERRED |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
3 |
Status |
F |
Date |
2022-07-26 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-26 |
Time |
11:35 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-26 |
Time |
11:35 |
Sent To |
|
|
| Notes |
| 2022-07-26 11:35:37 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2022-06-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-06-08 |
Time |
13:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-06-08 |
Time |
13:30 |
Sent To |
|
|
| Notes |
| 2022-06-08 13:30:29 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2022-04-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-04-12 |
Time |
08:05 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-04-12 |
Time |
08:05 |
Sent To |
|
|
| Notes |
| 2022-04-12 08:05:57 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2022-08-26 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2022-08-26 |
Time |
15:17 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2022-08-26 |
Time |
15:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2022-08-11 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-11 |
Time |
09:50 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-11 |
Time |
09:50 |
Sent To |
|
|
| Notes |
| 2022-08-11 09:50:55 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) DRAWINGS A203 DOES NOT SHOW AS DIGITALLY SIGNED IN | | | ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | | SPECIFIC TYPE OF E-SIGNATURE). | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2022-07-26 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-26 |
Time |
13:12 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-26 |
Time |
13:09 |
Sent To |
|
|
| Notes |
| 2022-07-26 13:11:58 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) DRAWINGS A101, A102, A103, A201, A203, A302, A303, | | | A401 DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | | SPECIFIC TYPE OF E-SIGNATURE). | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2022-06-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-06-08 |
Time |
13:34 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-06-08 |
Time |
13:34 |
Sent To |
|
|
| Notes |
| 2022-06-08 13:35:30 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) DRAWING SP-1 DOES NOT SHOW AS DIGITALLY SIGNED IN | | | ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-04-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-04-12 |
Time |
08:32 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-04-12 |
Time |
08:32 |
Sent To |
|
|
| Notes |
| 2022-04-12 08:35:07 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) THE PROVIDED SURVEY AND SOIL REPORT DO NOT SHOW AS | | | DIGITALLY SIGNED IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | | | 2022-03-25 09:00:14 | MECHANICAL DIGITAL SIGNATURES APPROVED. ME |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2022-08-15 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2022-08-15 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2022-08-15 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-08-15 09:56:59 | ZONING APPROVED WITH THE FOLLOWING PROVISOS: | | | | | | 1.) A MINOR PLANNED DEVELOPMENT (PD) AMENDMENT FOR THE | | | AS-BUILT SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF THE | | | FIRST CERTIFICATE OF OCCUPANCY (C.O.). | | | | | | 2.) ALL CONDITIONS IN ORDINANCE NO. 4967-21 SHALL BE | | | ADDRESSED PER THE TIMELINES SPECIFIED. | | | | | | 3.) BASE BUILDING HEIGHT MEASUREMENT SHALL BE AT FEMA | | | APPROVED ELEVATION. MAXIMUM BUILDING HEIGHT SHALL NOT | | | EXCEED 30 FT. WITH EXCEPTION TO THE 10% ALLOWANCE FOR | | | ARCHITECTURAL FEATURES. | | | | | | * SEE STAMPED SHEETS FOR ZONING APPROVAL AND NOTES. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2022-07-27 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2022-07-27 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2022-07-27 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-07-27 11:32:37 | ZONING APPROVED WITH THE FOLLOWING PROVISOS: | | | | | | 1.) A MINOR PLANNED DEVELOPMENT (PD)) AMENDMENT FOR THE | | | AS-BUILT SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF THE | | | FIRST CERTIFICATE OF OCCUPANCY (C.O.). | | | | | | 2.) ALL CONDITIONS IN ORDINANCE NO. 4967-21 SHALL BE | | | ADDRESSED PER THE TIMELINES SPECIFIED. | | | | | | 3.) BASE BUILDING HEIGHT MEASUREMENT SHALL BE AT FEMA | | | APPROVED ELEVATION. MAXIMUM BUILDING HEIGHT SHALL NOT | | | EXCEED 30 FT. WITH EXCEPTION TO THE 10% ALLOWANCE FOR | | | ARCHITECTURAL FEATURES. | | | | | | * SEE STAMPED SHEETS FOR ZONING APPROVAL AND NOTES. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2022-06-21 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2022-06-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2022-06-21 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-06-21 11:10:17 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) MINOR CHANGES HAVE BEEN DETECTED THAT DO NOT MATCH | | | THE APPROVED PLANS (I.E. ARCHITECTURAL, MINOR SITE | | | DEVIATIONS, FLOOR PLANS, ETC.). A MINOR PD AMENDMENT IS | | | REQUIRED PRIOR TO ZONING SIGN-OFF OF THIS PERMIT. | | | PLEASE CONTACT ZONING STAFF FOR ADDITIONAL INFORMATION | | | ON THE PROCESS (IF NECESSARY). | | | | | | 2.) CONDITIONS OF APPROVAL PER ORDINANCE NO. 4967-21 | | | HAVE NOT BEEN MET. A TREE ALTERNATION PERMIT HAS YET TO | | | BE SUBMITTED. THIS PERMIT SHOULD HAVE BEEN APPLIED FOR | | | PRIOR TO SITE CLEARING, WHICH HAS ALREADY BEEN | | | COMPLETED. | | | | | | | | | NOTES: | | | | | | * CONDITIONS OF APPROVAL, PER ORDINANCE NO. MUST BE | | | SATISFIED PRIOR TO THE ISSUANCE OF A PERMIT AND/OR | | | CERTIFICATE OF OCCUPANCY (C.O.) FOR THIS PROJECT. | | | PLEASE ENSURE ALL CONDITIONS ARE MET IN A TIMELY | | | MANNER. SUPPORTING DOCUMENTATION WILL BE REQUIRED TO | | | ENSURE ALL CONDITIONS HAVE BEEN MET. | | | | | | * SEPARATE PERMITS REQUIRED: SITE LIGHTING (INCLUDE | | | PHOTOMETRICS), LIGHTING, PLUNGE POOL FOR LOT 14. | | | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | * ZONE: RPD (PARK CENTRAL)/ORDINANCE NO. 4967-21. | | | | | | * PLAT REFERENCE: RESOLUTION NO. 231-21 (PLAT BOOK/PAGE | | | #: 133/100). | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-03-28 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2022-03-28 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
2022-03-28 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-03-28 13:42:57 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) ALL PERMIT PLANS SHALL EXACTLY MATCH THE PLANS | | | APPROVED BY ORDINANCE NO. 4967-21/CONDITIONAL SITE PLAN | | | APPROVAL LETTER ISSUED BY PLANNING STAFF ON 11/19/2021. | | | ANY DEVIATION TO THE PLANS (I.E. SITE PLAN, LANDSCAPE | | | PLAN, ARCHITECTURAL DRAWINGS (FLOOR PLANS AND | | | ELEVATIONS), UNIT SIZE, ETC.) WILL REQUIRE AN AMENDMENT | | | TO THE PARK CENTRAL RESIDENTIAL PLANNED DEVELOPMENT | | | (RPD). MINOR DEVIATIONS (I.E. UNIT SIZE, FLOOR PLANS, | | | PROPOSED FENCING LOCATION, HOW DOES THE PROPOSED | | | SMALLER BUILDING FOOTPRINT IMPACT BUILDING SETBACKS, | | | ETC.) HAVE BEEN DETECTED IN THE PERMIT PLANS THAT DO | | | NOT MATCH THE APPROVED SITE PLAN. PLEASE ADDRESS. | | | | | | 2.) COMPLETE OVERALL SITE PLAN AND ASSOCIATED PLAN | | | NOTES SHALL BE PROVIDED IN THE SITE PLAN. PLAN NOTES | | | HAVE BEEN CUT OFF FROM THE SITE PLAN PROVIDED IN THE | | | BUILDING PERMIT SET. | | | | | | 3.) PLANS SHOW THE MECHANICAL EQUIPMENT LOCATED WITHIN | | | THE GARAGE. PLEASE CLARIFY/CORRECT. ALSO THERE SEEMS TO | | | BE A/C CONDENSER UNITS ON THE ROOFTOP FOR EACH UNIT; | | | WHAT TYPE OF MECHANICAL EQUIPMENT IS PROVIDED ON THE | | | FIRST LEVEL? | | | | | | 4.) SINCE EACH UNIT IS BEING PROVIDED AS A SEPARATE | | | PERMIT, A SURVEY OF EACH LOT IS REQUIRED AS PART OF THE | | | PERMIT SUBMISSION. | | | | | | 5.) ARCHITECTURAL ELEVATIONS HAVE NOT BEEN PROVIDED | | | WITH THE PERMIT SUBMITTAL. ARCHITECTURAL ELEVATIONS ARE | | | REQUIRED AS PART OF THE PERMIT PACKET. | | | | | | NOTES: | | | | | | * CONDITIONS OF APPROVAL, PER ORDINANCE NO. MUST BE | | | SATISFIED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF | | | OCCUPANCY (C.O.) FOR THIS PROJECT. PLEASE ENSURE ALL | | | CONDITIONS ARE MET IN A TIMELY MANNER. SUPPORTING | | | DOCUMENTATION WILL BE REQUIRED TO ENSURE ALL CONDITIONS | | | HAVE BEEN MET. | | | | | | * SEPARATE PERMITS REQUIRED: SITE LIGHTING (INCLUDE | | | PHOTOMETRICS), PLUNGE POOL (UNIT 14), LANDSCAPING, ETC. | | | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | * ZONE: RPD (PARK CENTRAL)/ORDINANCE NO. 4967-21. | | | | | | * PLAT REFERENCE: RESOLUTION NO. 231-21 (PLAT BOOK/PAGE | | | #: 133/100) | | | |
|
|