| Plan Review Stops For Permit 22021406 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
3 |
Status |
F |
Date |
2023-07-18 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-07-18 |
Time |
13:56 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-07-18 |
Time |
13:56 |
Sent To |
|
|
| Notes |
| 2023-07-18 13:56:26 | AN @ ADDRESS NEEDS TO BE ASSIGNED TO THIS PROJECT. | | | PLEASE EMAIL A SITE PLAN SHOWING THE EXACT LOCATION OF | | | THE WHERE THE WORK IS TO BE DONE. IN THE FUTURE PLEASE | | | MAKE SURE THAT YOU COORDINATE WITH | | | [email protected] OR CALL 561-805-6659 BEFORE | | | APPLYING FOR A PERMIT TO BE ISSUED AN @ ADDRESS. |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
F |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-06-14 |
Time |
09:47 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-06-14 |
Time |
09:47 |
Sent To |
|
|
| Notes |
| 2023-06-14 09:47:17 | AN @ ADDRESS NEEDS TO BE ASSIGNED TO THIS PROJECT. | | | PLEASE EMAIL A SITE PLAN SHOWING THE EXACT LOCATION OF | | | THE WHERE THE WORK IS TO BE DONE. IN THE FUTURE PLEASE | | | MAKE SURE THAT YOU COORDINATE WITH | | | [email protected] OR CALL 561-805-6659 BEFORE | | | APPLYING FOR A PERMIT TO BE ISSUED AN @ ADDRESS. |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2022-08-03 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-08-03 |
Time |
13:09 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-08-03 |
Time |
13:09 |
Sent To |
|
|
| Notes |
| 2022-08-03 13:09:37 | PLEASE CONTACT [email protected], TO BE ASSIGNED A | | | GENERIC PROPERTY CONTROL NUMBER FOR MCI METRO, ALSO | | | PLEASE EMAIL A SITE PLAN SHOWING THE EXACT LOCATION OF | | | THE WHERE THE WORK IS TO BE DONE. IN THE FUTURE PLEASE | | | MAKE SURE THAT YOU COORDINATE WITH | | | [email protected] OR CALL 561-805-6659 BEFORE | | | APPLYING FOR A PERMIT TO BE ISSUED AN @ ADDRESS. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2023-06-28 |
|
|
Cont ID |
|
| Sent By |
cseifer |
Date |
2023-06-28 |
Time |
10:50 |
Rev Time |
0.00 |
| Received By |
cseifer |
Date |
2023-06-28 |
Time |
10:49 |
Sent To |
|
|
| Notes |
| 2023-06-28 10:50:18 | 1) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS. | | | INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE | | | MATERIAL, AND DESCRIPTION ON BOTH PLAN VIEW AND PROFILE | | | VIEW. CONTACT JANICE TARBILL, [email protected] FOR | | | AS-BUILT INFORMATION. INCLUDE AS-BUILT INFORMATION IN | | | YOUR RESUBMITTAL. | | | 2) ALL ROADWAY, SIDEWALK, AND SWALE RESTORATIONS ARE | | | REQUIRED PER CITY STANDARD, PARTIAL SIDEWALK FLAG | | | REPLACEMNTS ARE NOT ACCEPTABLE. PLEASE USE CITY OF WEST | | | PALM BEACH STANDARD DETAILS. | | | 3) PLANS NEED TO S&S BY LICENSED SURVEYOR OR ENGINEER | | | PER CITY STANDARDS. | | | | | | CHLOE SEIFER | | | [email protected] |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2022-08-17 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2022-08-17 |
Time |
08:33 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2022-08-17 |
Time |
08:32 |
Sent To |
|
|
| Notes |
| 2022-08-17 08:33:03 | 1) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS. | | | INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE | | | MATERIAL, AND DESCRIPTION ON BOTH PLAN VIEW AND PROFILE | | | VIEW. CONTACT JANICE TARBILL, [email protected] FOR | | | AS-BUILT INFORMATION. INCLUDE AS-BUILT INFORMATION IN | | | YOUR RESUBMITTAL. | | | 2) ALL ROADWAY, SIDEWALK, AND SWALE RESTORATIONS ARE | | | REQUIRED PER CITY STANDARD, PARTIAL SIDEWALK FLAG | | | REPLACEMNTS ARE NOT ACCEPTABLE. PLEASE USE CITY OF WEST | | | PALM BEACH STANDARD DETAILS. | | | | | | SUZANNE BERGLUND | | | [email protected] | | | 561-494-1075 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
amcgrego |
Date |
2023-07-14 |
Time |
14:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-06-30 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-06-30 |
Time |
11:30 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-06-02 |
Time |
08:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-08-26 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-08-26 |
Time |
07:51 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-07-18 |
Time |
17:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2022-08-26 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-08-26 |
Time |
07:51 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-08-26 |
Time |
07:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2023-06-29 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2023-06-29 |
Time |
14:59 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2023-06-29 |
Time |
15:18 |
Sent To |
|
|
| Notes |
| 2023-06-29 14:59:33 | INSUFFICIENT | | | | | | 1. PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED | | | SURVEYOR, THAT SHOWS THE RIGHT-OF-WAY LINE, THE | | | SIDEWALK, AND ANY TREES WITHIN THE RIGHT-OF-WAY ALONG | | | THE FIBER CONDUIT PATH SO THAT STAFF CAN VERIFY THAT | | | THE BORE AND ANY REQUIRED BORE PITS AND HANDHOLES ARE | | | WITHIN THE PUBLIC RIGHT-OF-WAY. THE SURVEY NEEDS TO | | | INCLUDE THE LOCATION OF PROPOSED HANDHOLES AND THE BORE | | | SECTIONS. | | | | | | IN ORDER TO INSTALL HANDHOLES AND BORE UNDER PRIVATE | | | PROPERTY THE SCOPE OF WORK MUST BE WITHIN A GENERAL | | | UTILITY EASEMENT. THIS GENERAL UTILITY EASEMENT MUST BE | | | CLEARLY SHOWN ON THE SURVEY. | | | | | | [UPDATE 6.29.23] THANK YOU FOR PROVIDING SURVEY | | | SECTIONS, PLEASE OVERLAY THE FIBER CONDUIT PATH ON THE | | | SURVEY AND INDICATE THE LOCATION OF ANY HANDHOLES OR | | | BOREPITS. | | | | | | 2. ANY BOREPITS, HANDHOLES, OR EXCAVATION WORK SHALL | | | PROVIDE AN 8FT. BUFFER FROM THE TRUNK OF THE TREE TO | | | REDUCE THE RISK TO ROOT SYSTEMS. PLEASE PROVIDE | | | DIMENSIONS FROM ANY TREES ADJACENT TO EXCAVATIONS. | | | | | | CHRIS KIMMERLY, AICP | | | URBAN DESIGN PLANNER | | | 822.1426 [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-08-25 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2022-08-25 |
Time |
11:12 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2022-08-25 |
Time |
11:08 |
Sent To |
|
|
| Notes |
| 2022-08-25 11:12:09 | INSUFFICIENT | | | | | | 1. PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED | | | SURVEYOR, THAT SHOWS THE RIGHT-OF-WAY LINE, THE | | | SIDEWALK, AND ANY TREES WITHIN THE RIGHT-OF-WAY ALONG | | | THE FIBER CONDUIT PATH SO THAT STAFF CAN VERIFY THAT | | | THE BORE AND ANY REQUIRED BORE PITS AND HANDHOLES ARE | | | WITHIN THE PUBLIC RIGHT-OF-WAY. THE SURVEY NEEDS TO | | | INCLUDE THE LOCATION OF PROPOSED HANDHOLES AND THE BORE | | | SECTIONS. | | | | | | IN ORDER TO INSTALL HANDHOLES AND BORE UNDER PRIVATE | | | PROPERTY THE SCOPE OF WORK MUST BE WITHIN A GENERAL | | | UTILITY EASEMENT. THIS GENERAL UTILITY EASEMENT MUST BE | | | CLEARLY SHOWN ON THE SURVEY. | | | | | | 2. ANY BOREPITS, HANDHOLES, OR EXCAVATION WORK SHALL | | | PROVIDE AN 8FT. BUFFER FROM THE TRUNK OF THE TREE TO | | | REDUCE THE RISK TO ROOT SYSTEMS. PLEASE PROVIDE | | | DIMENSIONS FROM ANY TREES ADJACENT TO EXCAVATIONS. | | | | | | CHRIS KIMMERLY, AICP | | | URBAN DESIGN PLANNER | | | 822.1426 [email protected] | | | |
|
|