Plan Review Details - Permit 22021369
Plan Review Stops For Permit 22021369
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-03-07 Cont ID  
Sent By ldeloren Date 2022-03-07 Time   Rev Time  
Received By ldeloren Date 2022-03-07 Time   Sent To  
Notes
2022-03-07 08:43:18 
 CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
  
 THANKS,
 LYNN DELORENZO, PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1085, FAX: (561) 494-1116,
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-03-08 Cont ID  
Sent By aoliver Date 2022-03-08 Time 09:49 Rev Time 0.00
Received By aoliver Date 2022-02-28 Time 13:16 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-03-04 Cont ID  
Sent By asangele Date 2022-03-04 Time 12:18 Rev Time 0.00
Received By asangele Date 2022-03-04 Time 12:18 Sent To  
Notes
2022-03-04 12:18:303/4/2022
 FAIL
 PLEASE SHOW THE DRIVEWAY WIDTH ON SURVEY AND PROVIDE A
 MORE CLEAR DRAWING ON WHERE YOU ARE LOCATING THE
 PROPOSED DRIVEWAY EXTENSION.
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved