Plan Review Details - Permit 22021225
Plan Review Stops For Permit 22021225
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2022-04-06 Cont ID  
Sent By jwitmer Date 2022-04-06 Time 13:31 Rev Time 0.00
Received By jwitmer Date 2022-04-06 Time 13:30 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-06-28 Cont ID  
Sent By jwitmer Date 2022-06-28 Time 09:53 Rev Time 0.00
Received By jwitmer Date 2022-06-28 Time 09:45 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-05-24 Cont ID  
Sent By jwitmer Date 2022-05-24 Time 08:56 Rev Time 0.00
Received By jwitmer Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-04-06 Cont ID  
Sent By jwitmer Date 2022-04-06 Time 13:53 Rev Time 0.00
Received By jwitmer Date 2022-04-06 Time 13:30 Sent To  
Notes
2022-04-06 13:53:15WEST PALM BEACH DEVELOPMENT SERVICES-CONSTRUCTION
 SERVICES/ BUILDING DIVISION
 2020 FBC- BUILDING PLAN REVIEW
 W. P. B. PERMIT: 22021225
 ADD: 2600 N FLAGLER DR # 707
 CONT: RHODES CONSTRUCTION
 TEL: 561-798-1382
 E-MAIL: [email protected]
  
 2020 FLORIDA BUILDING CODE W 2020 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2020 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW
 CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES
 SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA
 BUILDING CODE, BUILDING.
  
 1ST REVIEW
 DATE: WED. APRIL 06TH/ 2022
 ACTION: DENIED
  
 1) THE PERMIT APPLICATION HAS STATED THE VALUE OF THIS
 PROJECT AT $120,000.00 DOLLARS. CONTRACTORS (CGC & CBC)
 CAN ONLY CREATE THEIR OWN FLOOR PLANS AND DETAILS ON
 COMMERCIAL WORK TO A DOLLAR AMOUNT LESS THAN $25,000.00
 DOLLARS. $25,000.00 DOLLARS OR MORE REQUIRES A DESIGN
 PROFESSIONAL. 481.229 EXCEPTIONS; EXEMPTIONS FROM
 LICENSURE (1) (C) ANY OTHER TYPE OF BUILDING COSTING
 LESS THAN $25,000.00, EXCEPT A SCHOOL, AUDITORIUM, OR
 OTHER BUILDING INTENDED FOR PUBLIC USE, PROVIDED THAT
 THE SERVICES OF A REGISTERED ARCHITECT SHALL NOT BE
 REQUIRED FOR MINOR SCHOOL PROJECTS PURSUANT TO 1013.45.
 2) THE INTERIOR DEMO PLAN SHOWS VARIOUS WALLS BEING
 REMOVED, THERE IS NOTHING STATED IF FLOORING THROUGHOUT
 THE UNIT IS TO BE REMOVED AND TYPE OF NEW FLOORING
 UNDERLAYMENT NOR FINISH FLOOR MATERIAL. THE INTERIOR
 DEMO PLAN IS SILENT AS TO WHETHER DROPPED CEILINGS OR
 SOFFITS ARE GOING TO BE REMOVED AND REBUILT. THE DEMO
 PLAN DOES NOT INDICATE IF THERE IS GOING TO HAVE ANY
 DEMOLITION IN EITHER OF THE BATHROOMS, FIXTURES,
 CABINETS, TILE FLOOR WALLS AND OR REMOVAL OF TUB AND
 CONVERSION TO SHOWER.
 3) 2020 FBC-B 1210.2.2. WALLS & PARTITIONS. THIS
 COMMENT IS A RESULT OF THE BUILDING OFFICIAL
 INTERPRETATION ON 06/2020. IN BATHROOMS, RESTROOMS &
 SERVICE SINK AREAS EPOXY PAINT IS NO LONGER CONSIDERED
 A SMOOTH HARD, NON-ABSORBENT SURFACE.
  
 3A) 1210.2.2 WALLS & PARTITIONS WITHIN 2 FEET OF
 SERVICE SINKS, URINALS, AND WATER CLOSETS SHALL HAVE A
 SMOOTH, HARD, NON-ABSORBENT SURFACE TO A HEIGHT OF NOT
 LESS THAN 4 FEET ABOVE THE FLOOR, EXCEPT FOR STRUCTURAL
 ELEMENTS, THE MATERIAL USED IN SUCH WALLS SHALL BE OF A
 TYPE THAT IS NOT ADVERSELY AFFECTED BY MOISTURE.
  
 3B) 2509.1. WET AREAS. SHOWERS AND PUBLIC TOILET WALLS
 SHALL COMPLY WITH 1210.2.
  
 3C) 1210.2. FINISH MATERIALS. WALLS, BASE, FLOORS AND
 PARTITIONS IN TOILET AND BATHROOMS SHALL COMPLY WITH
 SECTIONS 1210.1 THROUGH 1210.4.
  
  
 4) 2020 FBC-B 2509.2 BASE FOR TILE. MATERIALS USED AS A
 BASE FOR WALL TILE IN TUB AND SHOWER AREAS AND WALLS
 AND CEILING PANELS IN SHOWER AREAS SHALL BE OF
 MATERIALS LISTED IN TABLE 2509.2 AND INSTALLED IN
 ACCORDANCE WITH MANUFACTURER?S RECOMMENDATIONS. WATER
 RESISTANT GYPSUM BACKING BOARD SHALL BE USED AS A BASE
 FOR TILE IN WATER CLOSET COMPARTMENT WALLS WHEN
 INSTALLED IN ACCORDANCE WITH GA-216 OR ASTM C840 AND
 THE MANUFACTURE?S RECOMMENDATIONS.
  
 5) 2020 FBC-B SHOWERS & TUBS 1210.3. SHOWER
 COMPARTMENTS AND BATHTUBS WITH INSTALLED SHOWER HEADS
 SHALL BE FINISHED WITH A NONABSORBENT SURFACE TO A
 HEIGHT NOT LESS THAN 72 INCHES ABOVE THE DRAIN INLET.
  
 6) POST TENSION SLAB/ NEW HOLES. THE PLAN IS SILENT AS
 IF THE LOCATION OF THE EXISTING TUB DRAIN IS GOING TO
 BE REUSED IN THE SAME LOCATION. IF NOT, THEN THE FLOOR
 SLAB WILL NEED TO BE X-RAYED TO FIND THE POST TENSION
 CHORD LOCATIONS. 107.2.1.2. ADDITIONAL INFORMATION IS
 REQUIRED.
  
 7) THROUGH-PENETRATIONS FIRESTOP SYSTEMS (HORIZONTAL
 ASSEMBLIES). IF A NEW FLOOR PENETRATION IS MADE FOR THE
 FUTURE SHOWER DRAIN, THEN YOU NEED TO SHOW COMPLIANCE
 WITH THE 2020 FBC-B SECTION 714.5.1.2.
 THROUGH-PENETRATIONS FIRESTOP SYSTEMS (HORIZONTAL
 ASSEMBLIES). THROUGH PENETRATIONS SHALL BE PROTECTED BY
 A THROUGH PENETRATION FIRESTOP SYSTEM INSTALLED IN
 ACCORDANCE WITH ASTM E814 OR UL 1479. THE SYSTEM SHALL
 HAVE AN F RATING / T RATING OF NOT LESS THAN 1 HOUR BUT
 NOT LESS THAN THE REQUIRED RATING OF THE FLOOR
 PENETRATED.
  
 8) TUB ENCLOSURE WALLS AND OR SHOWER WALLS. TUB
 ENCLOSURE WALLS AND OR SHOWER WALLS WHICH ARE ALSO
 TENANT SEPARATION WALL WHICH WILL ALSO NEED TO SHOW
 COMPLIANCE WITH SECTION 420.2 SEPARATION WALLS AND FIRE
 PARTITIONS IN ACCORDANCE WITH SECTION 708 OF THE 2020
 FBC-BUILDING CODE.
  
  
 9) FLOOR INSULATION/ UNDERLAYMENT (FBC-B 2020) FOR
 TILE, STONE, MARBLE, VINYL (LYT/ LYP), LAMINATE
 FLOORING AND WOOD FLOORING ALL NEED TO HAVE HAD THE
 SOUND UNDERLAYMENT TESTED FLOOR ASSEMBLIES TO THE
 FOLLOWING STANDARDS AND MEET THE QUALIFICATIONS LISTED
 UNDER EACH OF THE STANDARDS FOR A 6 INCH CONCRETE FLOOR
 ASSEMBLY/ NO DROPPED CEILING:
 PLEASE PROVIDE ALL THREE TEST REPORTS FOR TYPE I AND OR
 TYPE II BUILDINGS SHOWING COMPLIANCE WITH:
  
 9A) FBC-B 2020 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E-492.
  
 9B) FBC-B 2020 1207.2 AIR-BORNE SOUND. WALLS,
 PARTITIONS AND FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR
 AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E
 90.
  
 9C) FLAME SPREAD- FBC-B 2020 603.1. EXCEPTION 2.
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
 10) A TRANSMITTAL LETTER / NARRATIVE LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 PLEASE NOTE WITH THE LACK OF INFORMATION FOR THIS
 REVIEW, SUBSEQUENT REMARKS MAYBE MADE IN THE NEXT
 REVIEW CYCLE.
  
  
 MY WORK HOURS ARE USUALLY TUES. & WED. 7:30 AM- 4:30 PM
 PART-TIME/ SEMI-RETIRED.
  
 IF YOU WISH TO SPEAK WITH A PLANS EXAMINER BEFORE I GET
 BACK INTO THE OFFICE CALL
 (561)805-6700 AND ASK FOR THE PLANS EXAMINER ON-CALL.
 THANK YOU.
  
 JAMES A. WITMER BN, PX, SFP, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST. WEST PALM BEACH. FL 33402
 TEL: 561-805-6717
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2022-06-23 Cont ID  
Sent By mpeterso Date 2022-06-23 Time 13:42 Rev Time 0.00
Received By mpeterso Date 2022-06-23 Time 13:42 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2022-06-03 Cont ID  
Sent By mpeterso Date 2022-06-03 Time 09:22 Rev Time 0.00
Received By mpeterso Date 2022-06-02 Time 16:11 Sent To  
Notes
2022-06-03 09:27:04ELECTRIC REVIEW FAILED
 1) IT APPEARS PANEL LOCATION DOES NOT MEET NEC CODE FOR
 CLEARANCES. PLEASE LOCATE ELECTRIC PANEL TO MEET THE
 REQUIREMENTS OF NEC 110.26(A)(1)
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM.
  
 CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2020 7TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020
 7TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION
 NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-04-07 Cont ID  
Sent By mpeterso Date 2022-04-07 Time 15:54 Rev Time 0.00
Received By mpeterso Date 2022-04-07 Time 15:54 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 2022-06-08 Cont ID  
Sent By pleduc Date 2022-06-08 Time   Rev Time 0.00
Received By pleduc Date 2022-06-08 Time 10:50 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2022-05-23 Cont ID  
Sent By pleduc Date 2022-05-23 Time   Rev Time 0.00
Received By pleduc Date 2022-05-23 Time 11:17 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-03-21 Cont ID  
Sent By pleduc Date 2022-03-21 Time   Rev Time 0.00
Received By pleduc Date 2022-03-21 Time 11:08 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2022-02-25 Cont ID  
Sent By pleduc Date 2022-02-25 Time   Rev Time 0.00
Received By pleduc Date 2022-02-25 Time 15:42 Sent To  
Notes
2022-02-25 15:47:08THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) THERE IS AN INDICATION OF THE SCOPE OF WORK OF
 REPLACING THE TILE AND THERE IS A SPEC SHEET FOR THE
 FLOOR UNDERLAYMENT, BUT NO PRODUCT NAME NOR A PRODUCT
 SPEC SHEET FOR THE ACTUAL PROPOSED TILE.
  
 FLOORING IS MANUFACTURED AROUND THE WORLD AND TILE CAN
 HAVE DIFFERENT MEANING A PRODUCED DIFFERENTLY AND NOT
 ALL ARE TESTED AND MEETING LISTED AND NFPA STANDARDS.
  
 30.3.3.3 INTERIOR FLOOR FINISH.
 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN
 ACCORDANCE WITH
 SECTION 10.2.
  
 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH
 10.2.2.2
 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL
 HAVE A
 MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2.
  
 FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE PRODUCT
 SPEC SHEETS OF THE PROPOSED FINISHED
 TILEL FLOORING INDICATING THE FIRE BEHAVIOR RATING.
  
 *****FYI ****
  
 PLEASE PROVIDE THE TILE TYPE I.E. CERAMIC, MARBLE,
 TERRACOTTA, STONE WHICH WOULD NOT REQUIRE A SPEC SHEET.
  
 FOR OTHER TYPE OF TILE PRODUCT TYPE I.E. VINYL OR VINYL
 PLANKS, CORK, WOOD PLEASE PROVIDE THE MANUFACTURE
 PRODUCT FLAME SPREAD/PRODUCT SAFETY TEST SHEET
  
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date   Cont ID  
Sent By   Date 2022-06-28 Time   Rev Time 0.00
Received By lmarchan Date 2022-06-07 Time 13:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-06-03 Cont ID  
Sent By mpeterso Date 2022-06-03 Time 10:17 Rev Time 0.00
Received By mpeterso Date 2022-05-22 Time 14:48 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-04-07 Cont ID  
Sent By mpeterso Date 2022-04-07 Time 15:56 Rev Time 0.00
Received By mpeterso Date 2022-03-18 Time 07:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-02-28 Cont ID  
Sent By lmarchan Date 2022-02-28 Time 14:26 Rev Time 0.00
Received By lmarchan Date 2022-02-25 Time 05:56 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2022-06-13 Cont ID  
Sent By medwards Date 2022-06-13 Time 16:41 Rev Time 0.00
Received By medwards Date 2022-06-13 Time 16:41 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2022-05-26 Cont ID  
Sent By medwards Date 2022-05-26 Time 10:34 Rev Time 0.00
Received By medwards Date 2022-05-26 Time 10:34 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2022-03-28 Cont ID  
Sent By medwards Date 2022-03-28 Time 15:27 Rev Time 0.00
Received By medwards Date 2022-03-28 Time 15:27 Sent To  
Notes
2022-03-28 15:29:19PROVIDE A SCOPE OF WORK FOR THE MECHANICAL WORK BEING
 COMPLETED UNDER THIS PERMIT ALONG WITH A MECHANICAL
 DRAWING SHOWING THE EXISTING MECHANICAL SYSTEM AND THE
 PROPOSED MECHANICAL CHANGES.
  
 FBC107.2.1
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2022-05-24 Cont ID  
Sent By rwbrown Date 2022-05-24 Time 12:18 Rev Time 0.00
Received By rwbrown Date 2022-05-24 Time 12:17 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2022-03-22 Cont ID  
Sent By rwbrown Date 2022-03-22 Time 08:36 Rev Time 0.00
Received By rwbrown Date 2022-03-22 Time 08:21 Sent To  
Notes
2022-03-22 08:36:141ST PLUMBING REVIEW
  
 V7 FBC P - 2020 FLORIDA PLUMBING CODE
 2021 F.A.C. - 2021 FLORIDA ADMINISTRATIVE CODE
 2017 WPB AMEND - 2017 WEST PALM BEACH AMENDMENTS TO THE
 FBC CHAPTER 1
  
 THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED
 BY RYAN BROWN WITH THE FOLLOWING COMMENTS.
  
 1. 2017 WPB AMEND 107.2.1 - YOUR APPLICATION SAYS
 "PLUMBING PER PLAN" BUT THE PLANS DO NOT DETAIL ANY
 PLUMBING. PLEASE INDICATE IN SOME FASHION THE PLUMBING
 WORK TO BE DONE, EVEN IF IT STATES "LIKE FOR LIKE IN
 SAME LOCATION" OR OTHERWISE.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
  
 RYAN W. BROWN
 CHIEF PLUMBING INSPECTOR
 OFFICE: 561-805-6692
 CELL: 561-517-4293
 EMAIL: [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-06-23 Cont ID  
Sent By mpeterso Date 2022-06-23 Time 13:42 Rev Time 0.00
Received By mpeterso Date 2022-06-23 Time 13:42 Sent To  
Notes
2022-06-23 13:43:24ALL PLANS PASSED SIGNATURE. MP
2022-06-13 16:42:33MECHANICAL DIGITAL SIGNATURES APPROVED ME

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-06-06 Cont ID  
Sent By mpeterso Date 2022-06-03 Time 10:14 Rev Time 0.00
Received By mpeterso Date 2022-06-03 Time 10:14 Sent To  
Notes
2022-06-06 09:20:07CLIENT EMAILED PLANS WITH CORRECT SIGNATURE. I UPLOADED
 THEM TO SIGNATURE FILE 6/6/22. MP
2022-06-03 10:17:49SIGNATURE REVIEW FAILED
 1) PLANS TITELED PLAN EXIST, PLAN PROPOSED AND HVAC
 APPEAR TO BE COPIES OF DIGITAL SIGNATURES OR DO NOT
 HAVE THE REQUIED DIGITAL SIGNATURE.
  
 PLEASE FOLLOW THE DIRECTIONS OUTLINED BELOW TO CORRECT
 THIS ISSUE.FS471/FS481 DOCUMENTS PREPARED BY AN
 ARCHITECT OR ENGINEER AND SUBMITTED FOR PUBLIC RECORD
 ARE TO BE SIGNED, SEALED, DATED ORIGINALS OR DIGITALLY
 SEALED AND SIGNED.
  
 EITHER UPLOAD A DIGITALLY OR ELECTRONICALLY SIGNED PLAN
 TO THE SIGNATURE FOLDER WITH YOUR RESUBMITTAL (IF
 APPLICABLE) AND COMPLETE THE UPLOAD TASK IN PROJECTDOX,
 OR YOU CAN SUBMIT ONE ORIGINAL SIGNED AND SEALED PAPER
 ORIGINAL WITH A WET SIGNATURE TO THE BUILDING
 DEPARTMENT.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM.
  
 SIGNATURE DOCUMENTS ARE TYPICALLY REVIEWED WITHIN TWO
 BUSINESS DAYS AFTER SUBMITTAL; DIGITALLY SIGNED
 DOCUMENTS ARE PREFERRED.
 PLEASE EMAIL [email protected] AND CC TO
 [email protected] WITH ANY QUESTIONS
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  
2022-05-26 11:12:40DIGITAL SIGNATURE ON THE MECHANICAL DRAWING IS A COPY
 OF THE ORIGINAL DIGITAL SIGNATURE. PROVIDE THE
 ORIGIANAL DIGITALLY SIGNED DRAWING. ME

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-04-07 Cont ID  
Sent By mpeterso Date 2022-04-07 Time 15:56 Rev Time 0.00
Received By mpeterso Date 2022-04-07 Time 15:56 Sent To  
Notes
2022-04-07 15:56:43CONTRACTOR DRAWINGS