Plan Review Details - Permit 22020960
Plan Review Stops For Permit 22020960
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-02-23 Cont ID  
Sent By ldeloren Date 2022-02-23 Time   Rev Time  
Received By ldeloren Date 2022-02-23 Time   Sent To  
Notes
2022-02-23 10:45:16CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS.
  
 THERE IS AN EXISTING VALVE COVER OR CLEANOUT ADJACENT
 TO THE PROPOSED DRIVEWAY IN THE SIDEWALK, VALVE
 COVER/CLEANOUT SHALL NOT BE INCORPORATED INTO NEW
 DRIVEWAY APPROACH.
  
 CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
  
 LYNN DELORENZO, PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1085, FAX: (561) 494-1116,
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-02-25 Cont ID  
Sent By vbroglia Date 2022-02-25 Time 12:34 Rev Time 0.00
Received By vbroglia Date 2022-02-25 Time 12:34 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-02-25 Cont ID  
Sent By vbroglia Date 2022-02-25 Time 12:34 Rev Time 0.00
Received By vbroglia Date 2022-02-25 Time 12:34 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved