Plan Review Details - Permit 22020872
Plan Review Stops For Permit 22020872
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2022-05-05 Cont ID  
Sent By cthroop Date 2022-05-05 Time 17:12 Rev Time 0.00
Received By cthroop Date 2022-05-05 Time 14:34 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-03-08 Cont ID  
Sent By cthroop Date 2022-03-08 Time 13:54 Rev Time 0.00
Received By cthroop Date 2022-03-08 Time 11:41 Sent To  
Notes
2022-03-08 13:55:05SEE DEMO CHECKLIST UNDER BLDG REVIEW COMMENTS. CT

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-05-24 Cont ID  
Sent By cthroop Date 2022-05-24 Time 12:34 Rev Time 0.00
Received By cthroop Date 2022-05-24 Time 12:27 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-05-05 Cont ID  
Sent By cthroop Date 2022-05-05 Time 17:12 Rev Time 0.00
Received By cthroop Date 2022-05-05 Time 14:35 Sent To  
Notes
2022-05-05 17:03:11PLAN REVIEW BUILDING DEMO
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 2ND REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
  
 DEMO CHECKLIST-ENTIRE STRUCTURE
  
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1.
  
 2.
  
 3.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED; (SCHEDULE
 AND PASS A 703 FINAL PLUMBING INSPECTION).
  
 5.
  
 6.
  
 7.
  
 8.
  
 9.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-03-08 Cont ID  
Sent By cthroop Date 2022-03-08 Time 13:55 Rev Time 0.00
Received By cthroop Date 2022-03-08 Time 11:40 Sent To  
Notes
2022-03-08 14:03:37PLAN REVIEW BUILDING DEMO
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
  
 DEMO CHECKLIST-ENTIRE STRUCTURE
  
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 SUBMITTED FOR REVIEW 2/16/22. APPROVED. CT
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM
 "DEMOLITION APPLICATION"
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING INSPECTION #703.
  
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT DEMOLITION ADDRESS HAS
 BEEN INSPECTED AND/OR TREATED FOR RODENTS.
  
 6. COMPLETE THE DEMO DEBRIS FORM: SUBMITTED FOR REVIEW
 2/16/22. APPROVED. CT
  
 7. PROVIDE A SITE PLAN. SUBMITTED FOR REVIEW 2/16/22.
 APPROVED. CT
  
 8.PROVIDE A STORMWATER POLLUTION PREVENTION PLAN.
 YOU MAY USE THE SURVEY. SHOW SILT FENCEING OR OTHER
 APPROVED METHODS
  
 9.ASBESTOS
  
 PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE CONTRACTOR,
 ON LETTERHEAD, STATING THAT:
  
 THE INSTRUCTIONS ON THE WEBSITE OF THE ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
  
  
 IF YOU FEEL YOUR BUILDING IS EXEMPT, PROVIDE A SIGNED
 ACKNOWLEDGEMENT FROM THE CONTRACTOR, ON LETTERHEAD,
 STATING THE REASON WHY THE BUILDING IS EXEMPT.
  
 THIS PROJECT IS EXEMPT BECAUSE IT IS A SINGLE-FAMILY
 RESIDENCE AND IS NOT A PART OF A COMMERCIAL OR PUBLIC
 PROJECT AND IS NOT A CITY-INITIATED DEMOLITION.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-04-04 Cont ID  
Sent By rrossano Date 2022-04-04 Time   Rev Time 0.00
Received By rrossano Date 2022-04-04 Time   Sent To  
Notes
2022-04-04 11:09:18PASSED WITH PROVISO: PROTECT AREA CATCH BASINS
 (INCLUDING THOSE AROUND FRONTAGE OF PROJECT ON 45TH
 ST.) USING BMP'S.
  
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-02-23 Cont ID  
Sent By rrossano Date 2022-02-23 Time   Rev Time  
Received By rrossano Date 2022-02-23 Time   Sent To  
Notes
2022-02-23 10:57:16PASSED WITH PROVISOS:
  
 PLEASE PROVIDE STORMWATER POLLUTION PREVENTION PLAN -
 SILT FENCE AROUND PROPERTY TO PREVENT DEBRIS RUNOFF;
 PROTECT ROADWAY FROM TRACKING OF DIRT FROM TRUCKS
 HAULING DEBRIS; PROTECT ANY STORM DRAIN INLETS IN
 VICINITY USING BEST MANAGEMENT PRACTICES (FILTER
 FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
  
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-02-24 Cont ID  
Sent By amhamilt Date 2022-02-24 Time 10:27 Rev Time 0.00
Received By amhamilt Date 2022-02-24 Time 10:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-05-24 Cont ID  
Sent By cthroop Date 2022-05-24 Time 12:34 Rev Time 0.00
Received By cthroop Date 2022-05-10 Time 14:34 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-05-05 Cont ID  
Sent By cthroop Date 2022-05-05 Time 17:12 Rev Time 0.00
Received By cthroop Date 2022-04-01 Time 10:05 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-03-08 Cont ID  
Sent By cthroop Date 2022-03-08 Time 14:03 Rev Time 0.00
Received By cthroop Date 2022-02-17 Time 07:22 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-03-08 Cont ID  
Sent By cthroop Date 2022-03-08 Time 13:55 Rev Time 0.00
Received By cthroop Date 2022-03-08 Time 11:41 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-04-20 Cont ID  
Sent By amhamilt Date 2022-04-20 Time 09:47 Rev Time 0.00
Received By amhamilt Date 2022-04-20 Time 09:47 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-02-24 Cont ID  
Sent By amhamilt Date 2022-02-24 Time 10:27 Rev Time 0.00
Received By amhamilt Date 2022-02-24 Time 10:27 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved