| Plan Review Stops For Permit 22020840 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2022-06-03 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-06-03 |
Time |
09:32 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-06-03 |
Time |
09:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-04-18 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-04-18 |
Time |
16:24 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-04-18 |
Time |
05:22 |
Sent To |
|
|
| Notes |
| 2022-04-18 16:28:58 | PLAN REVIEW BUILDING | | | | | | CHRISTOPHER S. THROOP, C.B.O., CFM | | | PLANS EXAMINER II PX3169/SFP306 | | | BU1635 BN4338 | | | ASFPM CFM US-21-11935 | | | CITY OF WEST PALM BEACH | | | (561) 805-6726 | | | [email protected] | | | | | | CODES IN EFFECT: | | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | | CHAPTER 1 ADMINISTRATION | | | NFPA 70 2017 EDITION NEC 2017 | | | | | | 1ST REVIEW | | | | | | RESULTS: DENIED | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | | | 1. PROVIDE A SITE PLAN.... | | | 107.2.5 SITE PLAN, THE CONSTRUCTION DOCUMENTS SUBMITTED | | | WITH THE APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY | | | A SITE PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF | | | NEW CONSTRUCTION AND EXISTING STRUCTURES ON THE SITE, | | | AND IT SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE | | | AND INCLUDED BOUNDRAY LINE SURVEY. | | | | | | 2.PROVIDE SMOKE ALARM OUTSIDE BEDROOM 1 & 2 (HALLWAY). | | | R314.2.2ALTERATIONS, REPAIRS AND ADDITIONS. | | | WHERE ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A | | | PERMIT OCCUR, OR WHERE ONE OR MORE SLEEPING ROOMS ARE | | | ADDED OR CREATED IN EXISTING DWELLINGS, THE INDIVIDUAL | | | DWELLING UNIT SHALL BE EQUIPPED WITH SMOKE ALARMS | | | LOCATED AS REQUIRED FOR NEW DWELLINGS. | | | | | | 3.PROVIDE DESIGN PRESSURES FOR NEW ROOFING PER FIGURE | | | R301.2(7) COMPONENT AND CLADDING PRESSURE ZONES | | | R301.2.1.1WIND DESIGN REQUIRED. | | | | | | 4.PROVIDE ROOF SHEATHING FASTENER SCHEDULE PER | | | CALCULATED DESIGN PRESSURES. | | | TABLE R301.2.1.2 WINDBORNE DEBRIS PROTECTION FASTENING | | | SCHEDULE FOR WOOD STRUCTURAL PANELS. | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-05-24 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-05-24 |
Time |
23:05 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-05-24 |
Time |
22:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-03-08 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-03-08 |
Time |
20:58 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-03-08 |
Time |
19:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2022-02-23 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-02-23 |
Time |
10:24 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2022-02-23 |
Time |
10:24 |
Sent To |
|
|
| Notes |
| 2022-02-23 10:27:32 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | | THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT | | | BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND | | | PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | | FOR THE SCOPE OF WORK PER THE WPB AMENDMENT TO THE FBC | | | SEC. 105.1. | | | | | | NOTE: YOU MAY CHOOSE TO HAVE A GAS REVIEW DONE THIS | | | TIME AND ADDRESS THE COMMENTS ABOVE. THIS WILL HAVE THE | | | GAS APPROVE FOR A SUB PERMIT, OR IF YOU DECIDED NOT TO | | | ADDRESS THESE COMMENTS, PLEASE PUT A NOTE ON THE GAS | | | HEATER (A SEPARATE PERMIT BY A LICENSED CONTRACTOR FOR | | | THE GAS SYSTEM). THEN PLEASE TAKE OFF ANY GAS SHOWN ON | | | PLANS; THESE COMMENTS CAN BE FORWARD TO THE GAS | | | CONTRACTOR FOR REFERENCE. AN N WILL BE PUT ON THIS | | | REVIEW, WHICH STANDS FOR NOT REQUIRED, BUT A SUB PERMIT | | | WON'T BE ISSUED ONCE A REVIEW IS DONE FOR THAT SUB | | | PERMIT, SO PLEASE BE ADVISED ON THIS PROCEDURE. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-06-08 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-06-08 |
Time |
07:55 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-06-07 |
Time |
13:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-06-07 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-06-07 |
Time |
08:03 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-06-03 |
Time |
15:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-06-03 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-06-03 |
Time |
09:32 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-05-11 |
Time |
09:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-04-18 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-04-18 |
Time |
16:30 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-02-22 |
Time |
09:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2022-06-08 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-06-08 |
Time |
07:54 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-06-08 |
Time |
07:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2022-06-07 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-06-07 |
Time |
07:58 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-06-07 |
Time |
07:58 |
Sent To |
|
|
| Notes |
| 2022-06-07 08:01:42 | APPROVED WITH PRIVISO: | | | THE DRYER DUCT SHALL BE A MINIMUM OF 4 INCH ROUND DUCT. | | | ME | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2022-06-08 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-05-13 |
Time |
06:10 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-05-13 |
Time |
06:10 |
Sent To |
|
|
| Notes |
| 2022-05-13 06:10:52 | 1ST REVIEW FMC | | | PERMIT: 22020840 | | | | | | CODES IN EFFECT: 2020 | | | | | | FBC- FLORIDA BUILDING CODE | | | FMC- FLORIDA MECHANICAL CODE | | | FEC- FLORIDA ENERGY CONSERVATION | | | FGC- FLORIDA FUEL GAS | | | FEX- FLORIDA EXISTING BUILDING CODE | | | FRC- FLORIDA RESIDENTIAL BUILDING CODE | | | F.S.- FLORIDA STATUTES | | | FAC- FLORIDA ACCESSIBILITY CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) RETURN AIR CANNOT BE TAKEN FROM A KITCHEN OR A | | | BATHROOM, REVISE THE PLAN TO REFLECT THIS. FRC | | | M1602.2-4 | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2022-03-01 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-03-01 |
Time |
16:35 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-03-01 |
Time |
16:35 |
Sent To |
|
|
| Notes |
| 2022-03-01 16:37:26 | PLEASE PROVIDE A MECHAICAL SCOPE OF WORK ALONG WITH A | | | MECHANICAL DRAWING SHOWING ALL MECHANICAL WORK BEING | | | COMPLETED UNDER THIS PERMIT. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2022-02-23 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-02-23 |
Time |
09:51 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2022-02-23 |
Time |
09:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2022-04-18 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-04-18 |
Time |
15:38 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-04-18 |
Time |
14:08 |
Sent To |
|
|
| Notes |
| 2022-04-18 15:39:15 | PROVISO ON PLAN PAGE A-004: A SEPERATE ROOFING PERMIT | | | IS REQUIRED. CT |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2022-06-08 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-06-08 |
Time |
07:55 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-06-08 |
Time |
07:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2022-06-07 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-06-07 |
Time |
08:02 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-06-07 |
Time |
08:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-06-03 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-06-03 |
Time |
09:32 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-06-03 |
Time |
09:32 |
Sent To |
|
|
| Notes |
| 2022-05-13 06:11:36 | MECHANICAL DIGITAL SIGNATURES APPROVED ME |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-04-18 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-04-18 |
Time |
16:24 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-04-18 |
Time |
05:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-05-31 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-05-16 |
Time |
16:53 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-05-16 |
Time |
16:53 |
Sent To |
|
|
| Notes |
| 2022-05-16 16:54:44 | 5/16/2022 | | | | | | PLEASE APPLY FOR A LANDSCAPE PERMIT | | | | | | LANDSCAPE PLANS CAN BE SUBMITTED AT A DIFFERENT TIME, | | | BUT A PERMIT MUST BE APPLIED FOR TO ALLOW STAFF TO MOVE | | | FOWARD | | | | | | VALENTINA BROGLIA | | | ASSOCIATE PLANNER | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-02-25 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-02-25 |
Time |
13:02 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-02-25 |
Time |
13:02 |
Sent To |
|
|
| Notes |
| 2022-02-25 13:04:54 | 2/25/2022 **** FAILED **** | | | | | | THE VALUE OF THE CONSTRUCTION ($225,000) EXCEEDS 50% OF | | | THE STRUCTURE'S VALUE ($306,277) ACCORDING TO THE | | | P.B.C. PROPERTY APPRAISER'S OFFICE; THEREFORE, PURSUANT | | | TO SECTION 94-441(B) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS (ZLDR), THE LANDSCAPE ON THE SITE SHALL BE | | | IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS FOUND IN | | | ARTICLE XIV OF THE ZLDR. IF THE SITE CONFORMS TO | | | ARTICLE XIV, THEN TWO (2) COPIES OF A LANDSCAPE PLAN | | | DEMONSTRATING COMPLIANCE SHALL BE INCLUDED WITH THE | | | PERMIT RE-SUBMITTAL. IF THE SITE DOES NOT CONFORM TO | | | ARTICLE XIV, THEN PRIOR TO THE ZONING APPROVAL OF THIS | | | PERMIT A SEPARATE LANDSCAPE PERMIT AND IRRIGATION | | | PERMIT SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE | | | SITE INTO CONFORMITY. | | | | | | | | | VALENTINA BROGLIA | | | ASSOCIATE PLANNER | | | [email protected] | | | |
|
|