Plan Review Details - Permit 22020832
Plan Review Stops For Permit 22020832
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-04-05 Cont ID  
Sent By jwitmer Date 2022-04-05 Time 09:19 Rev Time 0.00
Received By jwitmer Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-03-16 Cont ID  
Sent By jwitmer Date 2022-03-16 Time 15:12 Rev Time 0.00
Received By jwitmer Date 2022-03-16 Time 15:07 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-03-23 Cont ID  
Sent By pleduc Date 2022-03-23 Time   Rev Time 0.00
Received By pleduc Date 2022-03-23 Time 11:48 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2022-02-25 Cont ID  
Sent By pleduc Date 2022-02-25 Time   Rev Time 0.00
Received By pleduc Date 2022-02-25 Time 15:25 Sent To  
Notes
2022-02-25 15:28:14THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) THERE IS AN INDICATION OF THE SPEC SHEET FOR THE
 FLOOR UNDERLAYMENT, BUT NO PRODUCT NAME NOR A PRODUCT
 SPEC SHEET FOR THE ACTUAL PROPOSED VINYL FLOORING.
  
 VINYL FLOORING IS MANUFACTURED AROUND THE WORLD AND NOT
 ALL ARE TESTED AND MEETING LISTED AND NFPA STANDARDS.
  
 30.3.3.3 INTERIOR FLOOR FINISH.
 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN
 ACCORDANCE WITH
 SECTION 10.2.
  
 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH
 10.2.2.2
 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL
 HAVE A
 MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2.
  
 FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE PRODUCT
 SPEC SHEETS OF THE PROPOSED FINISHED
 VINYL FLOORING INDICATING THE FIRE BEHAVIOR RATING.
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By aoliver Date 2022-03-22 Time 06:31 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-03-16 Cont ID  
Sent By jwitmer Date 2022-03-16 Time 15:14 Rev Time 0.00
Received By jwitmer Date 2022-02-24 Time 07:40 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-03-16 Cont ID  
Sent By jwitmer Date 2022-03-16 Time 15:12 Rev Time  
Received By jwitmer Date   Time   Sent To  
Notes
***NONE***