Plan Review Details - Permit 22020801
Plan Review Stops For Permit 22020801
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-03-02 Cont ID  
Sent By dbattles Date 2022-03-02 Time 13:59 Rev Time 0.00
Received By dbattles Date 2022-03-02 Time 13:38 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-02-25 Cont ID  
Sent By dbattles Date 2022-02-25 Time 12:49 Rev Time 0.00
Received By dbattles Date 2022-02-25 Time 12:49 Sent To  
Notes
2022-02-25 12:53:21PLEASE PROVIDE LIFE SAFETY DATA AS REQUESTED BY FIRE
 MARSHALL.
  
 107.2.3 FBC[AMENDED] MEANS OF EGRESS. THE CONSTRUCTION
 DOCUMENTS SHALL SHOW IN SUFFICIENT DETAIL THE LOCATION,
 CONSTRUCTION, SIZE AND CHARACTER OF ALL PORTIONS OF THE
 MEANS OF EGRESS IN COMPLIANCE WITH THE PROVISIONS OF
 THIS CODE.
  
 W.P.B. PERMIT: 22020801
 REVIEWED: FEBRUARY 25, 2022
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER PX4191
 [email protected]
 561-805-6718
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-03-03 Cont ID  
Sent By pleduc Date 2022-03-03 Time   Rev Time 0.00
Received By pleduc Date 2022-03-03 Time 12:07 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2022-02-17 Cont ID  
Sent By pleduc Date 2022-02-17 Time   Rev Time 0.00
Received By pleduc Date 2022-02-17 Time 12:38 Sent To  
Notes
2022-02-17 12:44:55THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) THIS PROPOSED EVENT WAS PREVIOUSLY REVIEWED THRU AN
 EMAIL WITH THE FOLLOWING COMMENTS THAT ARE NOT
 ADDRESSED IN THIS SUBMITTAL:
  
 ? PROPOSED MAXIMUM OCCUPANCY LOAD.
 ? OCCUPANCY LOAD CONTROL TO ENSURE NO OVER CROWDING
 ? TYPE OF ENTRANCE/EXIT CONTROL(GATES, MANNED, ETC.)
 ? WIDTH OF PROPOSED EXITS
 ? EXIT SIGNS/EXIT LOCATION DIRECTIONAL
 DEVICES/EMERGENCY LIGHTING
 ? GENERATOR, IF SO, PROPOSED LOCATION, FUEL SOURCE
 ? NUMBER OF STAFF CROWD MANAGER CERTIFIED ?
 ? BASED ON THE PICTURES OVER LARGE CROWDS WITH NO
 STANDING ROOM AND THE PROPOSED LOCATION OF THE STAGES
 IF APPEARS THAT THE EXITS COULD BE BLOCKED.
  
 WHAT IS PROPOSED TO CONTROL THE CROWD FROM BLOCKING
 EXITS?
  
  
  
 2) PLEASE PROVIDE DETAILS AND/OR SPECIFICS TO EACH OF
 THE BULLET POINTS AND QUESTION ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date   Cont ID  
Sent By   Date 2022-03-03 Time   Rev Time 0.00
Received By dbattles Date 2022-03-02 Time 14:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-03-02 Cont ID  
Sent By amcgrego Date 2022-03-02 Time 12:52 Rev Time 0.00
Received By amcgrego Date 2022-03-02 Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-02-14 Cont ID  
Sent By amcgrego Date 2022-02-14 Time 17:51 Rev Time 0.00
Received By amcgrego Date 2022-02-14 Time 17:51 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-02-22 Cont ID  
Sent By aaponte Date 2022-02-22 Time 10:38 Rev Time 0.00
Received By aaponte Date 2022-02-22 Time 09:59 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved