| Plan Review Stops For Permit 22020449 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2022-08-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-08-24 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-08-24 |
Time |
08:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2022-07-23 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-23 |
Time |
19:15 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-23 |
Time |
19:15 |
Sent To |
|
|
| Notes |
| 2022-07-23 19:16:47 | FS471, UPLOAD DIGITALLY SIGNED ENGINEERING. THE | | | DOCUMENT UPLOADED APPEARS TO A DIGITALLY SIGNED | | | DOCUMENT, BUT THE DIGITAL SIGNATURE WAS REMOVED FROM | | | THE DOCUMENT. | | | | | | IF YOU WOULD LIKE FOR US TO VERIFY THE DIGITAL | | | SIGNATURE BEFORE YOU RESUBMIT, EMAIL THE DOCUMENT TO: | | | [email protected] | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-06-24 |
Time |
12:02 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-06-24 |
Time |
12:02 |
Sent To |
|
|
| Notes |
| 2022-06-24 11:49:16 | PLAN | | | REVIEW COMMENTS | | | 2ND REVIEW: FBC SEVENTH EDITION (2020) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SUBMIT THE MANUFACTURER'S SPECIFCATIONS FOR THE 27 | | | KW GENERATOR. FBC AMEND. 107.2.1 | | | | | | 2) RESOLVED. | | | | | | 3) SEE SIGNATURE REVIEW COMMENTS. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-04-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-04-05 |
Time |
09:44 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-04-05 |
Time |
09:44 |
Sent To |
|
|
| Notes |
| 2022-04-05 09:44:48 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SEVENTH EDITION (2020) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SUBMIT THE MANUFACTURER'S SPECIFCATIONS FOR THE 27 | | | KW GENERATOR. FBC AMEND. 107.2.1 | | | | | | 2) THE GENERATOR EXHAUST IS REQUIRED TO BE AT LEAST 10 | | | FEET FROM ANY OPENINGS INTO A BUILDING. | | | R303.5.1 INTAKE OPENINGS. MECHANICAL AND GRAVITY | | | OUTDOOR AIR INTAKE OPENINGS SHALL BE LOCATED NOT LESS | | | THAN 10 FEET (3048 MM) FROM ANY HAZARDOUS OR NOXIOUS | | | CONTAMINANT, SUCH AS VENTS, CHIMNEYS, PLUMBING VENTS, | | | STREETS, ALLEYS, PARKING LOTS AND LOADING DOCKS. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-03-08 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-03-08 |
Time |
19:47 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-03-08 |
Time |
18:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2022-02-16 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-02-16 |
Time |
09:52 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2022-02-16 |
Time |
09:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-08-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-08-24 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-07-27 |
Time |
15:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-07-23 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-23 |
Time |
19:17 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-06-27 |
Time |
13:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-06-24 |
Time |
12:03 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-05-24 |
Time |
10:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-04-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-04-05 |
Time |
09:45 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-02-15 |
Time |
07:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2022-02-16 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-02-16 |
Time |
09:52 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2022-02-16 |
Time |
09:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2022-08-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-08-24 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-08-24 |
Time |
08:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2022-07-23 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-07-23 |
Time |
19:16 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-07-23 |
Time |
19:16 |
Sent To |
|
|
| Notes |
| 2022-07-23 19:17:20 | SEE BUILDING COMMENTS | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2022-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-06-24 |
Time |
12:02 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-06-24 |
Time |
12:02 |
Sent To |
|
|
| Notes |
| 2022-06-24 11:54:34 | THE DIGITAL SIGNATURE ON THE SLAB DRAWING CAN NOT BE | | | VERIFIED. IT APPEARS TO BE A COPY. ELECTRONICALLY | | | SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT | | | OR ENGINEER'S DIGITAL SIGNATURE ON THEM. THE ARCHITECT | | | OR ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL | | | IS REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR | | | OTHER FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS | | | 481 & FAC 61G1 OR FS 471 & FAC 61G15 |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-04-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-04-05 |
Time |
09:38 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-04-05 |
Time |
09:37 |
Sent To |
|
|
| Notes |
| 2022-04-05 09:40:18 | THE DIGITAL SIGNATURE ON THE SLAB DRAWING CAN NOT BE | | | VERIFIED. IT APPEARS TO BE A COPY. ELECTRONICALLY | | | SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT | | | OR ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ARCHITECT OR ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE | | | AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO | | | PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE | | | ACCEPTABLE. FS 481 & FAC 61G1 OR FS 471 & FAC 61G15 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-05-27 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2022-05-27 |
Time |
09:03 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2022-05-27 |
Time |
09:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-02-18 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2022-02-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2022-02-18 |
Time |
14:36 |
Sent To |
|
|
| Notes |
|
|