Plan Review Details - Permit 22020276
Plan Review Stops For Permit 22020276
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2022-08-05 Cont ID  
Sent By cthroop Date 2022-08-05 Time 15:37 Rev Time 0.00
Received By cthroop Date 2022-08-05 Time 09:21 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2022-07-27 Cont ID  
Sent By cthroop Date 2022-07-27 Time 12:04 Rev Time 0.00
Received By cthroop Date 2022-07-27 Time 11:43 Sent To  
Notes
2022-07-25 14:37:29BUILDING PLAN REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 BU1635 BN4338
 ASFPM CFM US-21-11935
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NFPA 70 2017 EDITION NEC 2017
  
 3RD REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 3RD REQUEST: SITE WALL WATERPROOFING
  
 1. PROVIDE WATERPROOFING PRODUCT SPECIFICATIONS PER
 R406.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 NEW COMMENT:
  
 2. SITE DRAINAGE PLAN C-1 AND SURVEY DATED 2/7/22 SHOWS
 RETAINING WALL WITHIN THE 2.5' UTILITY EASEMENT.
 RE-LOCATE WALL OR PROVIDE UTILITY RELEASE FORMS FROM
 ALL UTILITY COMPANIES.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-05-26 Cont ID  
Sent By cthroop Date 2022-05-26 Time 14:56 Rev Time 0.00
Received By cthroop Date 2022-05-26 Time 12:10 Sent To  
Notes
2022-05-26 14:56:51BUILDING PLAN REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 BU1635 BN4338
 ASFPM CFM US-21-11935
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NFPA 70 2017 EDITION NEC 2017
  
 2ND REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 2ND REQUEST: SITE WALL WATERPROOFING
  
 1. PROVIDE WATERPROOFING DETAILS AND PRODUCT
 SPECIFICATIONS PER R406.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-03-07 Cont ID  
Sent By cthroop Date 2022-03-07 Time 06:38 Rev Time 0.00
Received By cthroop Date 2022-03-06 Time 11:36 Sent To  
Notes
2022-03-07 07:45:54BUILDING PLAN REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 BU1635 BN4338
 ASFPM CFM US-21-11935
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NFPA 70 2017 EDITION NEC 2017
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 NOTICE: THIS IS A STAND ALONE RES-MISC PERMIT FOR THE
 SITE WALLS. ALL PLANS AND SPECIFICATIONS GOVERNING THE
 DESING AND CONSTRUCTION OF THE SITE WALLS SHALL BE
 SUBMITTED FOR REVIEW'
  
 REF. SURVEY OF PROPOSED DWELLING FOR THE FOLLOWING
 COMMENT:
 1. UTILITY EASEMENT LOCATED ALONG SOUTH PROPERTY LINE.
 SUBMIT EASEMENT CONSENT FORMS FROM;
 FPL,FPU.AT&T,COMCAST & WPB UTILITIES DEPT.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 REF. SURVEY AND PLAN PAGE S10 FOR THE FOLLOWING
 COMMENT:
 2. SURVEY STATES "PROPOSED 4" C.B.S. RETAINING WALL".
 DETAIL 1/S-10 INDICATES THE WALLS SHALL BE "FULLY
 GROUTED 8" CMU WALL". PLEASE CLARIFY?
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 REF. PLAN PAGE SP1 FOR THE FOLLOWING COMMENT:
 3. PROVIDE SITE DRAINAGE PLAN.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 REF. PLAN PAGE S10 FOR THE FOLLOWING COMMENTS:
  
 4. SPECIFY SIZE OF HORIZONTAL BOND BEAM RE-INFORCING
 PER DETAIL 1/S10.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 5. DETAIL 1/S10 STATES: STUCCO (SEE ARCH. PLAN).
 PROVIDE ARCHITECHTURAL PLAN WITH DETAILS OF STUCCO.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 6. DETAIL 1/S10 STATES: WATERPROOFING & DRAINAGE BY
 OTHERS.
 PROVIDE WATERPROOFING DETAILS AND PRODUCT
 SPECIFICATIONS PER R406.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2022-08-05 Cont ID  
Sent By cthroop Date 2022-08-05 Time 15:38 Rev Time 0.00
Received By cthroop Date 2022-08-01 Time 12:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-07-27 Cont ID  
Sent By cthroop Date 2022-07-27 Time 13:08 Rev Time 0.00
Received By cthroop Date 2022-07-14 Time 15:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-05-26 Cont ID  
Sent By cthroop Date 2022-05-26 Time 15:04 Rev Time 0.00
Received By cthroop Date 2022-04-28 Time 07:05 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-03-07 Cont ID  
Sent By cthroop Date 2022-03-07 Time 09:27 Rev Time 0.00
Received By cthroop Date 2022-02-08 Time 08:26 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-07-27 Cont ID  
Sent By cthroop Date 2022-07-27 Time 12:04 Rev Time 0.00
Received By cthroop Date 2022-07-27 Time 11:43 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-05-26 Cont ID  
Sent By cthroop Date 2022-05-26 Time 15:02 Rev Time 0.00
Received By cthroop Date 2022-05-26 Time 12:11 Sent To  
Notes
2022-05-26 15:03:37SIGNATURE REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 CFM
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NEC2017
  
 2ND REVIEW
 RESULTS: DENIED
  
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 RE: PLAN PAGE SP2
  
 1. DOCUMENTS PREPARED BY AN ARCHITECT OR ENGINEER AND
 SUBMITTED FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED,
 DATED ORIGINALS. A SCAN OF A WET SEAL AND SIGNATURE OR
 DIGITAL SIGNATURE IS NOT CONSIDERED A DIGITAL
 SIGNATURE.
  
 2. EITHER UPLOAD A VALID DIGITALLY SIGNED DOCUMENT OR
 DROP OFF (OR MAIL) ONE PAPER ORIGINAL WITH AN ORIGINAL
 WET SEAL AND SIGNATURE TO:
  
 BUILDING DIVISION, FIRST FLOOR
 CITY OF WEST PALM BEACH
 401 CLEMATIS ST
 WEST PALM BEACH, FL 33401
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-03-07 Cont ID  
Sent By cthroop Date 2022-03-07 Time 06:35 Rev Time 0.00
Received By cthroop Date 2022-03-06 Time 11:36 Sent To  
Notes
2022-03-07 06:38:20SIGNATURE REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 CFM
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NEC2017
  
 1ST REVIEW
 RESULTS: DENIED
  
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 RE: SP-1
  
 1. DOCUMENTS PREPARED BY AN ARCHITECT OR ENGINEER AND
 SUBMITTED FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED,
 DATED ORIGINALS. A SCAN OF A WET SEAL AND SIGNATURE OR
 DIGITAL SIGNATURE IS NOT CONSIDERED A DIGITAL
 SIGNATURE.
  
 2. EITHER UPLOAD A VALID DIGITALLY SIGNED DOCUMENT OR
 DROP OFF (OR MAIL) ONE PAPER ORIGINAL WITH AN ORIGINAL
 WET SEAL AND SIGNATURE TO:
  
 BUILDING DIVISION, FIRST FLOOR
 CITY OF WEST PALM BEACH
 401 CLEMATIS ST
 WEST PALM BEACH, FL 33401
  
  

Review Stop Z ZONING
Rev No 2 Status P Date 2022-05-09 Cont ID  
Sent By vbroglia Date 2022-05-09 Time 14:59 Rev Time 0.00
Received By vbroglia Date 2022-05-09 Time 14:59 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-02-14 Cont ID  
Sent By vbroglia Date 2022-02-14 Time 15:23 Rev Time 0.00
Received By vbroglia Date 2022-02-14 Time 15:23 Sent To  
Notes
2022-02-14 15:24:002/14/22 FAILED
  
 PLEASE PROVIDE AN EASEMENT CONSENT FORM FROM FPL, FPU,
 AT&T, COMCAST, WPB UTILITIES AND FLORIDA WATER
 UTILITIES
  
  
 VALENTINA BROGLIA
 ASSOCIATE PLANNER
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved