Plan Review Details - Permit 22020214
Plan Review Stops For Permit 22020214
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-11-01 Cont ID  
Sent By rmcphers Date 2022-11-01 Time 09:23 Rev Time 0.00
Received By rmcphers Date 2022-11-01 Time 09:23 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-04-19 Cont ID  
Sent By rmcphers Date 2022-04-19 Time 07:54 Rev Time 0.00
Received By rmcphers Date 2022-04-18 Time 17:19 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2022-11-07 Cont ID  
Sent By rrossano Date 2022-11-07 Time   Rev Time 0.00
Received By rrossano Date 2022-11-07 Time   Sent To  
Notes
2022-11-07 10:56:54PASSED WITH PROVISO: PLEASE UPLOAD APPROVED ENGINEERING
 PLANS AFTER PRE-CONSTRUCTION CONFERENCE AND RELEASE.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES
 DEPT., 561-494-1098, FAX: 561-494-1116
 [email protected] FOR 24-HOUR EMERGENCY RESPONSE
 SERVICES TO PUBLIC UTILITIES, PUBLIC WORKS, PARKS, ETC.
 561-822-2210
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-06-07 Cont ID  
Sent By rrossano Date 2022-06-07 Time   Rev Time 0.00
Received By rrossano Date 2022-06-07 Time   Sent To  
Notes
2022-06-07 08:14:05UNDER FORMAL ENGINEERING REVIEW.
  
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-03-28 Cont ID  
Sent By rrossano Date 2022-03-28 Time   Rev Time 0.00
Received By rrossano Date 2022-03-28 Time   Sent To  
Notes
2022-03-28 10:26:02UNDER FORMAL ENGINEERING REVIEW.
  
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-03-31 Cont ID  
Sent By   Date 2022-03-31 Time   Rev Time 0.00
Received By bdolan Date 2022-03-31 Time 13:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-11-08 Cont ID  
Sent By aoliver Date 2022-11-08 Time 11:42 Rev Time 0.00
Received By aoliver Date 2022-10-24 Time 07:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-06-17 Cont ID  
Sent By mpeterso Date 2022-06-17 Time 13:46 Rev Time 0.00
Received By mpeterso Date 2022-06-02 Time 09:08 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-04-25 Cont ID  
Sent By rmcdouga Date 2022-04-25 Time 09:52 Rev Time 0.00
Received By rmcdouga Date 2022-03-23 Time 07:55 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-04-20 Cont ID  
Sent By ccole Date 2022-04-20 Time 10:52 Rev Time 0.00
Received By ccole Date 2022-04-20 Time 10:37 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-11-01 Cont ID  
Sent By rmcphers Date 2022-11-01 Time 09:23 Rev Time 0.00
Received By rmcphers Date 2022-11-01 Time 09:23 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-06-17 Cont ID  
Sent By mpeterso Date 2022-06-17 Time 13:45 Rev Time 0.00
Received By mpeterso Date 2022-06-17 Time 13:45 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date   Cont ID  
Sent By   Date 2022-04-25 Time   Rev Time 0.00
Received By rmcphers Date 2022-04-19 Time 07:56 Sent To  
Notes
2022-04-19 07:57:17SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) THE PROVIDED SURVEY DOES NOT SHOW AS DIGITALLY
 SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES
 NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN
 DROP OFF THE ORIGINAL SIGNED AND SEALED
 DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING
 DIVISION AT THE CITY HALL.
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2022-06-14 Cont ID  
Sent By asangele Date 2022-06-14 Time 12:12 Rev Time 0.00
Received By asangele Date 2022-06-14 Time 12:12 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-04-21 Cont ID  
Sent By asangele Date 2022-04-21 Time 09:19 Rev Time 0.00
Received By asangele Date 2022-04-21 Time 09:19 Sent To  
Notes
2022-04-21 09:32:254/21/2022
 FAIL
  
 * NEEDS TO PROVIDED MEASUREMENTS OF THE ACCESSIBLE
 PARKING SPOT ON SURVEY AND STANDARD PARKING SPOTS SINCE
 YOU ARE SLIGHTLY ALLITERATING THE EXISTING PARKING
 SPOTS.
  
 ACCESSIBLE PARKING SPOT:
 12' MIN ENTRY WAY
 WHITE STRIPS 5' MIN
 HEIGHT OF THE SPOT 18'
  
 STANDARD PARKING SPOT:
 8'6" MIN ENTRY WAY
 4" WHITE STRIP WIDTH
  
 * SEPARATE PERMIT IS REQUIRED FOR FENCE AND DUMPSTER:
 FENCE
 * NEEDS TO SHOW SETBACKS OF THE FENCE, WHERE IS IS
 GOING TO BE LOCATED AND HEIGHT OF THE FENCE ON SURVEY.
 DUMPSTER
 * SEE TO COMMENTS MADE REGARDING THE DUMPSTER PERMIT
 SUBMITTED
  
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved