Plan Review Details - Permit 22020021
Plan Review Stops For Permit 22020021
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-02-28 Cont ID  
Sent By rrossano Date 2022-02-28 Time   Rev Time 0.00
Received By rrossano Date 2022-02-28 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-02-23 Cont ID  
Sent By rrossano Date 2022-02-23 Time   Rev Time 0.00
Received By rrossano Date 2022-02-23 Time   Sent To  
Notes
2022-02-23 07:05:19PLEASE CONFIRM THAT GREASE TRAP IS ONSITE/NOT IN RIGHT
 OF WAY.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2022-03-01 Time   Rev Time 0.00
Received By aoliver Date 2022-02-25 Time 16:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-02-23 Cont ID  
Sent By jleahy Date 2022-02-23 Time 12:37 Rev Time 0.00
Received By jleahy Date 2022-02-16 Time 12:49 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2022-03-01 Cont ID  
Sent By medwards Date 2022-03-01 Time 17:31 Rev Time 0.00
Received By ccole Date 2022-03-01 Time 17:31 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2022-03-08 Cont ID  
Sent By ccole Date 2022-03-08 Time 14:56 Rev Time 0.00
Received By ccole Date 2022-03-08 Time 14:54 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2022-03-01 Cont ID  
Sent By ccole Date 2022-03-01 Time 17:30 Rev Time 0.00
Received By ccole Date 2022-03-01 Time 16:49 Sent To  
Notes
2022-03-01 17:31:182ND REVIEW FBC-2020 PLUMBING
 PERMIT- 22020021
 3/1/2022
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION
 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED. FAILED CPOMMENTS FROM THE
 1ST REVIEW ARE LISTED BELOW WITH ADDITIONAL NOTES IN
 CAPS FOR CLARIFICATION.
  
 2) FAILED. SHEET P1.0 & P1.3: SHOW THE LOCATIONS OF THE
 SAMPLING PORT ON P1.0, AND INCLUDE THE GREASE
 INTERCEPTOR AND VENT LINE IN THE RISER DRAWING- SEC.
 1003.3.5 FBC P. THE MANUFACTURER RECOMMENDED SAMPLING
 PORT HAS HAS BEEN REMOVED. PLEASE PROVIDE DATA
 INDICATING THE REMAINING CLEANOUTS CAN BE USED FOR
 SAMPLING THE EFFLUENT.
  
 3) FAILED. SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE INTERCEPTOR AND
 SAMPLING PORT- SEC. 1003.3.5 FBC P. PLEASE NOTE THAT
 SCHIER RECOMMENDS REINFORCED CONCRETE SLABS FOR BELOW
 GRADE INSTALLATIONS. THE SPECS SHEETS WERE SUBMITTED
 BUT NOT THE INSTALLATION INSTRUCTIONS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2022-02-18 Cont ID  
Sent By ccole Date 2022-02-18 Time 14:15 Rev Time 0.00
Received By ccole Date 2022-02-18 Time 12:31 Sent To  
Notes
2022-02-18 14:16:501ST REVIEW FBC-2020 PLUMBING
 PERMIT- 22020021
 2/18/2022
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION
 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE SUBMIT REVISED CIVIL PLANS FOR ENGINEERING
 REVIEW- SEC. 107.2.1 WPB.
  
 2) SHEET P1.0 & P1.3: SHOW THE LOCATIONS OF THE
 SAMPLING PORT ON P1.0, AND INCLUDE THE GREASE
 INTERCEPTOR AND VENT LINE IN THE RISER DRAWING- SEC.
 1003.3.5 FBC P.
  
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE INTERCEPTOR AND
 SAMPLING PORT- SEC. 1003.3.5 FBC P. PLEASE NOTE THAT
 SCHIER RECOMMENDS REINFORCED CONCRETE SLABS FOR BELOW
 GRADE INSTALLATIONS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-03-01 Cont ID  
Sent By ccole Date 2022-03-01 Time 17:31 Rev Time 0.00
Received By ccole Date 2022-03-01 Time 17:31 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-02-23 Cont ID  
Sent By jleahy Date 2022-02-23 Time 12:37 Rev Time 0.00
Received By jleahy Date 2022-02-23 Time 12:37 Sent To  
Notes
***NONE***