Plan Review Stops For Permit 22011297
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-04-25 Cont ID  
Sent By rrossano Date 2022-04-25 Time   Rev Time 0.00
Received By rrossano Date 2022-04-25 Time   Sent To  
Notes
2022-04-25 09:08:03PASSED WITH PROVISOS:
  
 DO NOT CONSTRUCT DRIVEWAY ON TOP OF WATER METERS,
 SANITARY CLEANOUTS, STORMWATER INLETS ETC.
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 PROPOSED DRIVEWAY CONSTRUCTION.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-03-28 Cont ID  
Sent By rrossano Date 2022-03-28 Time   Rev Time  
Received By rrossano Date 2022-03-28 Time   Sent To  
Notes
2022-03-28 10:42:14INDICATE AREAS OF PROPOSED DRIVEWAY CONSTRUCTION.
 DIMENSION DRIVEWAYS, LOCATED HORIZONTALLY AND
 VERTICALLY. CALL OUT SETBACK. SHOW ANY WATER METERS,
 SANITARY CLEANOUTS, STORM INLETS ETC. IN VICINITY OF
 PROPOSED DRIVEWAY.
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-04-25 Cont ID  
Sent By asangele Date 2022-04-25 Time 10:33 Rev Time 0.00
Received By asangele Date 2022-04-25 Time 10:33 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-04-05 Cont ID  
Sent By asangele Date 2022-04-05 Time 11:38 Rev Time 0.00
Received By asangele Date 2022-04-05 Time 11:38 Sent To  
Notes
***NONE***

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 1 Status P Date 2022-02-23 Cont ID  
Sent By shill Date 2022-02-23 Time 17:10 Rev Time 0.00
Received By shill Date 2022-02-23 Time 17:10 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-04-25 Cont ID  
Sent By asangele Date 2022-04-25 Time 10:32 Rev Time 0.00
Received By asangele Date 2022-04-25 Time 10:32 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-04-05 Cont ID  
Sent By asangele Date 2022-04-05 Time 11:34 Rev Time 0.00
Received By asangele Date 2022-04-05 Time 11:34 Sent To  
Notes
2022-04-05 11:38:234/5/2022
 FAIL
 PLEASE SHOW THE DRIVEWAY SETBACKS ON THE SURVEY.
 DRIVEWAY WIDTH CANNOT EXCEED 20FT
 IS THE WALK ALSO NEW OR EXCEED PLEASE DEMONSTRATE ON
 THE SURVEY AS WELL.
  
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved