Plan Review Details - Permit 22011240
Plan Review Stops For Permit 22011240
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status N Date 2022-03-31 Cont ID  
Sent By rmcphers Date 2022-03-31 Time 08:17 Rev Time 0.00
Received By rmcphers Date 2022-03-31 Time 08:17 Sent To  
Notes
2022-03-31 08:20:49THERE IS A RE ROOFING PERMIT (21080306)

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-03-02 Cont ID  
Sent By rmcphers Date 2022-03-02 Time 15:56 Rev Time 0.00
Received By rmcphers Date 2022-03-02 Time 15:56 Sent To  
Notes
2022-03-02 16:03:41ROOF TOP EQUIPMENT
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) ON THE PROVIDED ENGINEERING FOR THE AC STAND -
 PLEASE CIRCLE THE STAND DESIGN TO BE USED FROM THE
 SCHEDULES.
  
 2) PLEASE SHOW THE WIDTH OF THE MECHANICAL UNIT AND THE
 CLEARANCE FROM THE ROOF TO THE BOTTOM OF THE STAND -
 FBC 1510.10 MECHANICAL UNITS.
 ROOF MOUNTED MECHANICAL UNITS SHALL BE MOUNTED ON CURBS
 RAISED A MINIMUM OF 8 INCHES (203 MM) ABOVE THE ROOF
 SURFACE, OR WHERE ROOFING MATERIALS EXTEND BENEATH THE
 UNIT, ON RAISED EQUIPMENT SUPPORTS PROVIDING A MINIMUM
 CLEARANCE HEIGHT IN ACCORDANCE WITH TABLE 1510.10.
  
 3) PLEASE SHOW THE HEIGHT OF THE BUILDING - NEEDED TO
 DETERMINE THE WIND DESIGN PRESSURES.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-04-05 Cont ID  
Sent By medwards Date 2022-04-05 Time 15:01 Rev Time 0.00
Received By medwards Date 2022-03-29 Time 07:23 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-03-02 Cont ID  
Sent By rmcphers Date 2022-03-02 Time 16:03 Rev Time 0.00
Received By rmcphers Date 2022-01-31 Time 06:37 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2022-04-05 Cont ID  
Sent By medwards Date 2022-04-05 Time 15:00 Rev Time 0.00
Received By medwards Date 2022-04-05 Time 15:00 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2022-02-09 Cont ID  
Sent By hmoser Date 2022-02-09 Time 08:18 Rev Time 0.00
Received By hmoser Date 2022-02-09 Time 07:20 Sent To  
Notes
2022-02-09 08:26:17PLAN DENIED
 PROVIDE A COMPLETE SET OF CONDENSER STAND SUBMITTALS
 WITH THE ANCHOR SCHEDULE.
 PER SECTION 107 FBC 2020.
 PLAN REVIEW BY HAROLD MOSER
 HMOSER@WPB .ORG
 OFFICE 561-805-6732
 FAX 561-805-6676

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-03-31 Cont ID  
Sent By rmcphers Date 2022-03-31 Time 08:18 Rev Time 0.00
Received By rmcphers Date 2022-03-31 Time 08:18 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-03-02 Cont ID  
Sent By rmcphers Date 2022-03-02 Time 16:12 Rev Time 0.00
Received By rmcphers Date 2022-03-02 Time 16:12 Sent To  
Notes
2022-03-02 16:12:05SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) ENGINEERING FROM FRANK BENNARDO P.E. DOES NOT SHOW
 AS DIGITALLY SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES
 NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN
 DROP OFF THE ORIGINAL SIGNED AND SEALED
 DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING
 DIVISION AT THE CITY HALL.
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-02-09 Cont ID  
Sent By hmoser Date 2022-02-09 Time 08:26 Rev Time 0.00
Received By hmoser Date 2022-02-09 Time 08:26 Sent To  
Notes
***NONE***