Plan Review Details - Permit 22011226
Plan Review Stops For Permit 22011226
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2022-06-01 Cont ID  
Sent By rmcphers Date 2022-06-01 Time 07:32 Rev Time 0.00
Received By rmcphers Date 2022-06-01 Time 07:32 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-04-25 Cont ID  
Sent By rmcphers Date 2022-04-25 Time 10:29 Rev Time 0.00
Received By rmcphers Date 2022-04-25 Time 10:29 Sent To  
Notes
2022-04-25 10:29:46PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-06-06 Cont ID  
Sent By rmcphers Date 2022-06-06 Time 07:53 Rev Time 0.00
Received By rmcphers Date 2022-06-06 Time 07:53 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-06-01 Cont ID  
Sent By rmcphers Date 2022-06-01 Time 07:44 Rev Time 0.00
Received By rmcphers Date 2022-06-01 Time 07:43 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-04-25 Cont ID  
Sent By rmcphers Date 2022-04-25 Time 10:29 Rev Time 0.00
Received By rmcphers Date 2022-04-25 Time 10:29 Sent To  
Notes
2022-04-25 10:33:10REMODEL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE SHOW THE CEILING HEIGHTS. FBC 1208.2
  
 2) FOR THE FLOORING - THE FOLLOWING ACUSTICAL TEST
 REPORTS ARE REQUIRED:
  
 MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO
 DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST
 REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE
 MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT)
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90..
 PROVIDE A COPY OF THE TEST REPORT. (A DROP CEILING
 SHOULD NOT BE INCLUDED IN THE FLOOR/CEILING ASSEMBLY
 DESCRIPTION UNLESS THE UNIT MATCHES THE TESTED DROP
 CEILING DESCRIPTION)
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. PROVIDE A COPY OF THE TEST REPORT. (A DROP
 CEILING SHOULD NOT BE INCLUDED IN THE FLOOR/CEILING
 ASSEMBLY DESCRIPTION UNLESS THE UNIT MATCHES THE TESTED
 DROP CEILING DESCRIPTION)
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS
 ATTACHED TO THE FLOORING)
  
 YOU CAN EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY
 THAT THEY ARE TEST REPORTS BEFORE RESUBMITTING TO
 PROJECTDOX ( [email protected] )
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-04-14 Cont ID  
Sent By mpeterso Date 2022-04-14 Time 11:53 Rev Time 0.00
Received By mpeterso Date 2022-04-14 Time 11:53 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2022-06-08 Cont ID  
Sent By cwalker Date 2022-06-08 Time   Rev Time 0.00
Received By cwalker Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-05-20 Cont ID  
Sent By clfranci Date 2022-05-20 Time   Rev Time 0.00
Received By clfranci Date 2022-05-20 Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2022-03-24 Cont ID  
Sent By clfranci Date 2022-03-24 Time   Rev Time 0.00
Received By clfranci Date 2022-03-24 Time   Sent To  
Notes
2022-03-24 12:46:14THIS PLAN WAS REVIEWED AND FAILED BY CAITLIN L.
 FRANCIS, FIRE INVESTIGATOR, WITH THE FOLLOWING
 COMMENTS:
  
 1) THE PLANS INDICATE THERE WILL BE REPLACEMENT OF
 FLOORING WITHOUT THE DOCUMENTS IDENTIFYING MATERIALS
 BEING USED, PLEASE PROVIDE THE PRODUCT SPECS FOR ANY
 FLOORING, UNDERLAYMENT, AND THEIR FIRE RATING INCLUDE
 THE FIRE RATING.
 - PER NFPA 101 CHAPTER 10, 10.2.7.2
 SHALL HAVE A MINIMUM CRITICAL RADIANT FLUX OF 0.1
 W/CM2.
  
 2) ANY REMOVAL AND/OR CONSTRUCTION OF THE CEILING/WALL
 AREAS MAY REQUIRE AN EVALUATION OR MODIFICATION OF THE
 FIRE SPRINKLER AND FIRE ALARM SYSTEMS FOR CODE COVERAGE
 AND COMPLIANCE BY CERTIFIED CONTRACTORS.
  
 3) ANY AND ALL WORK ON THE FIRE SPRINKLER AND/OR FIRE
 ALARM SYSTEMS SHALL BE DONE UNDER SEPARATE PERMITS AND
 SHOP DRAWINGS BY CERTIFIED CONTRACTORS.
  
 4) THE FIRE SPRINKLER AND FIRE ALARM SYSTEMS SHALL
 REMAIN ACTIVE THROUGHOUT THE DEMO AND CONSTRUCTION
 PERIODS.
  
  
 CAITLIN L. FRANCIS
 FIRE INVESTIGATOR
 561-804-4728
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-06-09 Cont ID  
Sent By aoliver Date 2022-06-09 Time 07:44 Rev Time 0.00
Received By aoliver Date 2022-06-06 Time 06:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-06-01 Cont ID  
Sent By rmcphers Date 2022-06-01 Time 07:48 Rev Time 0.00
Received By rmcphers Date 2022-05-19 Time 10:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-04-25 Cont ID  
Sent By rmcphers Date 2022-04-25 Time 10:34 Rev Time 0.00
Received By rmcphers Date 2022-03-22 Time 12:09 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2022-04-06 Cont ID  
Sent By medwards Date 2022-04-06 Time 15:39 Rev Time 0.00
Received By medwards Date 2022-04-06 Time 15:39 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-04-01 Cont ID  
Sent By rwbrown Date 2022-04-01 Time 15:03 Rev Time 0.00
Received By rwbrown Date 2022-04-01 Time 14:57 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-06-06 Cont ID  
Sent By rmcphers Date 2022-06-06 Time 07:53 Rev Time 0.00
Received By rmcphers Date 2022-06-06 Time 07:53 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-06-01 Cont ID  
Sent By rmcphers Date 2022-06-01 Time 07:46 Rev Time 0.00
Received By rmcphers Date 2022-06-01 Time 07:46 Sent To  
Notes
2022-06-01 07:48:06SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS A-100,A-200, A-300, A-400 DO NOT SHOW AS
 DIGITALLY SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).- OR - IF YOUR ARCHITECT,
 ENGINEER OR SURVEYOR DOES NOT HAVE A VERIFIABLE
 ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN DROP OFF THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE
 FRONT DESK IN THE BUILDING DIVISION AT THE CITY HALL.
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-04-25 Cont ID  
Sent By rmcphers Date 2022-04-25 Time 10:34 Rev Time 0.00
Received By rmcphers Date 2022-04-25 Time 10:34 Sent To  
Notes
2022-04-06 15:40:21MECHANICAL DIGITAL SIGNATURES APPROVED ME


Account Summary | Usage Policy | Privacy Policy